The Assessment of Alumino-Sillicate Refractories Raw Material in Indonesia: An Exercise in Mineral Resource PlanningBy J H. Baker, P G. Beadle, J P. O&apos, Brien
In 1974 a preliminary study of the refractories industry in theRepublic of Indonesia was completed by Crown Lynn Consultants, a subsidiary of Cerarnco Ltd., on behalf of the Indonesian and New Zealand
Jan 1, 1978
-
The Charging of Slurry Explosive with the Nitro Nobel Cartridge Loader at the Mount Lyell Mining and Railway Co. Ltd., Queenstown, TasmaniaBy Wilson J. R
The main mining method employed at Mt Lyell is sub-level open stoping with a typical extraction level interval of 100 m and sub-level intervals of 30 m. Currently, pillar blasts provide the major p
Jan 1, 1977
-
Fundamentals of Open Pit Planning and SchedulingOpen pit planning and scheduling play a significant role in establishing, maintaining and improving the economics of open pit mining ventures.The development of an open pit plan and schedule involves
Jan 1, 1992
-
Geology and Mineralization of the Wagon Pass Prospect, Napier Range, Lennard Shelf, Western AustraliaThe Lennard Shelf is an Upper Devonian carbonate reef complex striking northwest for 350 km along the northeast margin of the Canning Basin. Numerous small Mississippi Valley type (MVT) Pb-Zn pros
Jan 1, 1986
-
Good Management and Ore-Dressing by Automatic MachineryThe necessity for good management and economic working in our mines and ore-dressing sheds is impressed upon us by the present low prices of all our metals. Silver, lead, copper, and tin have all suff
-
Station Electrical and Mechanical DesignThis paper forms part of a series of papers relating to the Melbourne Underground Rail Loop and presented to the Fourth Australian Tunnelling Conference in Melbourne, March 1981. The Design of Ele
Jan 1, 1981
-
æKeep the CreamÆ ù Reconciling Coal Recovery at BMA Goonyella RiversideBy M J. Kelleher
CREAM is an acronym for coal recovery, evaluation, analysis and management and is a business improvement project at BMAÆs Goonyella Riverside mine that is focussed on maximising coal recovered. In Au
Jan 1, 2005
-
Methane Drainage Experience with Horizontal Boreholes in a Western CoalbedBy Perry JH, King RL
The Bureau of Mines in cooperation with Kaiser Steel Corporation conducted two methane drainage studies in an advancing section of the Sunnyside No. I Mine where production was being severely hampe
Jan 1, 1982
-
Refined Zinc Metal Production at the MinesiteProduction of refined zinc (99.95 per cent) at the minesite without increasing greenhouse gas emissions is considered. As an example, exploitation of the full reserve of the McArthur River orebody is
Jan 1, 1998
-
Mine Haulage - Options and the Process of ChoiceIn the last eight years inclined conveyor haulage systems have established themselves in the mainstream for hard rock underground mine haulage. This leaves the question; what else might be on the hori
Jan 1, 2008
-
Monitoring of the Performance of a Crushed Waste/Classified Tailings Backfill for Shaft Pillar Pre-extraction in the South Deep Section, Western Areas Gold MineBy S Z. Petho
The South Deep surface shaft system is being sunk to a final depth of 2750 m below surface and on completion will be the deepest single drop shaft in the world. The shafts will intersect the target re
Jan 1, 1998
-
Futuristic Surface Mining TechnologyBy Collins J. L, Fytas K
Surface mining accounts for more than 50% of the world's total mineral production. In future years this status is expected to change somewhat in favour of surface mining. The production technol
Jan 1, 1988
-
PACMANUS: An Active Seafloor Hydrothermal Field on Siliceous Volcanic Rocks in the Eastern Manus Basin, Papua New Guinea (3c389328-8706-4f53-9d31-55f40fac9ab9)By Parr JM, Scott SD, Herzig PM, Gemmell JB
PACMANUS is an actively-forming seafloor analogue of volcanic-hosted massive sulfide orebodies, situated on the crest of an andesite-dacite-rhyodacite ridge overlying rifted older arc crust in a back
Jan 1, 1995
-
Blast Vibration Control in hunter Valley Coal MinesBy Moore A. J
Control of blast vibration requires that its nature and causes be understood, and that effective control procedures be implemented to ensure compliance with limits related to the probability of dama
Jan 1, 1995
-
A Simple Finite Element Model for Predicting the Behaviour of Hydraulically Powered Coalmine SupportsBy Olden WH
A scheme is presented whereby the complexities of design and operation of a hydraulically powered coalmine support are modelled using the finite element method. This enables predictions to be made o
Jan 1, 1992
-
Modern Cooling Strategies for Ultra-Deep Hydropower MinesBy H E. S Moorcroft, D Scott
The increasing mining depths of South African gold mine deposits are resulting in ever-increasing heat loads associated with depth and the geothermal gradient. Together with changes in the mining hori
Jan 1, 2005
-
Selecting Frothers for the Flotation of Specific Ores by Means of Batch Scale Foaming TestsBy S R. Grano
The selection of the proper frother, specifically for a given ore, is essential in flotation. Traditionally, strong and stable froths are required in the scavengers, where metal recovery needs to be m
Jan 1, 2006
-
Overburden Removal Activities Associated with the Yallourn Open Cut Township FieldBy Fraser C. J
The township of Yalloum was established in 1921 to provide accommodation for the work force on the sites of the power station and open cut which were to become the basis of Victoria's electricity
Jan 1, 1992
-
The Modelling and Control of Transients in Solvent Extraction Mixer-SettlersThree transient phenomena have been observed and experienced in the operation of large solvent extraction mixer-settlers. These relate to the ability of the settler to discharge streams with low entra
Jan 1, 2000
-
Pillar Extraction at the Doe Run Company, 1991-1998By W L. Lane, T R. Yanske
The Doe Run Company and its predecessors have been mining for over 130 years utilising the room and pillar mining method. This method has left approximately 20 per cent of the orebody in the remaining