Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Demonstrable Data Integrity of Mineral Resource Grade Estimation Decreases Economic Risk

    Mineral resource estimation is commonly based on the accumulation of a series of local estimates. At times, the distribution of these grade estimates is not appropriate to the grade distribution of th

    Jan 1, 2003

  • AUSIMM
    Blasting at Shallow Depths: Problems and Improvements

    Rock formation at shallow depths is generally associated with complex geology consisting of many joints, fractures, bedding planes, etc. Fragmentation results from primary blasts in such strata are

    Jan 1, 1995

  • AUSIMM
    Application of the SIROLOG Downhole Geophysical Tool at Callide Coalfields ù East Central Queensland

    Callide Coalfields produces a sub-bituminous, very subhydrous, low rank, steaming coal with good combustion properties, primarily for domestic power generation. Geological input into planning of coal

    Jan 1, 2000

  • AUSIMM
    The Manufacture of Tungsten Powder and Ferro-Silicon at the Works of the Broken Hill Pty. Company Limited, Newcastle:

    Shortly after the outbreak of war in September, 1939, it became apparent that considerable quantities of certain metals and alloys which at that time were not being produced in Australia would be requ

    Jan 1, 1947

  • AUSIMM
    Adsorption and Desorption Technique in Predicting Outburst of Gas and Coal (Coal Mines Symposium September. 1980)

    The paper describes the studies conducted to date on the short term adsorption/desorption of gases in coal from the point of view of developing techniques to predict imminent outbursting condition

    Jan 1, 1980

  • AUSIMM
    Decoppering of Lead and Hard Lead by Stirring with Sulfur and Pyrites

    By Segnit ER, Jensen G

    The decoppering of soft and hard leads was investigated by stirring in an open pot, using sulfur or sulfur plus pyrites, or sulfur plus pyrrhotite, as reagents. Lead samples taken during the proce

    Jan 1, 1980

  • AUSIMM
    A New Laboratory Flotation Rig for Ore Floatability Determination

    By E V. Man, O N. Savassi, J-P Franzidis

    In flotation, the property that is exploited to effect the separation of a mineral from an ore is referred to as its floatability. Assessment and quantification of ore floatability is of fundamental i

    Jan 1, 2000

  • AUSIMM
    Drilling and Blasting for Underground Space

    By A Robertson

    Australia has been slow in adopting the use of underground space as a part of our urban planning process. Australia has one of the highest levels of tunnel advance per capita per annum in the world, y

    Jan 1, 2007

  • AUSIMM
    Evaluating rheological features inside tumbling mills using DEM data previously validated against PEPT measurements

    By I Govender, T L. Moodley

    Tumbling mills are grossly inefficient, using only 5 per cent of the total energy supplied for actual breakage. A significant proportion of this inefficiency is unavoidable owing to geometric limitati

    Aug 24, 2022

  • AUSIMM
    Uranium Ore Deposit at Mary Kathleen

    By Munro DL

    The Mary Kathleen uranium deposit is in north-west Queensland, approximately halfway between the townships of Mount Isa and Cloncurry, at long. 1400 009 E and lat. 200 44' S. The deposit Iwas d

    Jan 1, 1968

  • AUSIMM
    Shaft Hoisting Based on Direct Torque Control Technology

    By Y Wu, F-J Ping

    Today, coal production accounts for about 65 per cent of the nationÆs gross energy in China. By the year 2010, the output of coal is planned to increase to 1.65 billion tonnes and by the year 2020 to

    Jan 1, 2005

  • AUSIMM
    Slurry Loading Of Ironsand Concentrate At Taharoa

    By Gadd D. E

    Since October 1972, New Zealand Steel Mining Ltd has loaded around 10 million tonnes of ironsand concentrate from single-point mooring buoys located off-shore at Taharoa on the west coast of the No

    Jan 1, 1980

  • AUSIMM
    Geological Modelling of a Stoping Block at BHP's Cannington Ag-Pb-Zn Mine

    Production of oic at BHP Minerals Pty Ltd's Cannington Mine commenced in May 1997. The initial sloping blocks at the [nine are located in the upper part of the Footwall Lead lode, and the Hangi

    Jan 1, 1997

  • AUSIMM
    Use of Carbon-in-Pulp Process in Russia

    By Rashchenko AF, Voiloshnikov GI, Elshin VV, Khomutov VV

    The sorption method for the precious metals recovery fromsolutions and pulps are a perspective trend of modernhydrometallurgy. Russian gold mining industry uses thesemethods, anion-exchange resins bei

    Jan 1, 1993

  • AUSIMM
    ImPact ù Extending Wireless LAN Technology Underground

    By D Kent, J Kirkpatrick

    The mining industry has long wanted a single communication back bone to cover the majority of their requirements underground. The convergence of communication technologies in the office/surface enviro

    Jan 1, 2005

  • AUSIMM
    Design and Commissioning of the Sepon Copper Pressure Oxidation Circuit

    By A G. Pavlides, B L. Weekes

    The Sepon Copper Project is located in the Savannakhet Province of Laos PDR and is operated by Lane Xang Minerals Ltd (LXML). An Ausenco - Bateman Engineering joint venture, the Khanong Development Gr

    Jan 1, 2005

  • AUSIMM
    Slope Stability Radar for Managing Rock Fall Risks in Open Cut Mines

    By N Harries

    The management of risks associated with slope instability is an essential process in the safe and economic operation of open cut mines. The æslope stability radarÆ (SSR) has been developed to better m

    Jan 1, 2007

  • AUSIMM
    Preconditioning a Large Pillar at Mt Charlotte Mine

    By Lee M. F, Guilfoyle K

    A large hard rock rib pillar was recently preconditioned at Mt Charlotte mine using a novel blasting technique. The motivation for trialling this procedure was a history of past pillar failures, wit

    Jan 1, 1995

  • AUSIMM
    Ore Block Optimisation for Open Pit Grade Control

    By M B. McKevitt, W J. Shaw

    The main task of grade control on a daily basis is to define the material that should be mined to a destination under various categories. This can be determined by grade, lithology, quality and blendi

    Jan 1, 2009

  • AUSIMM
    Long-Term Erosional Stability of Mine Spoils

    By Riley S

    Many regulatory bodies have, or are considering, guidelines that require rehabilitated mine spoils to be erosionally stable (satisfying quantitative limits) over specified design lifetimes. One of

    Jan 1, 1994