Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Transition from Open Cut to Underground Coal Mining

    At some time in the mining life of an open cut coal deposit, consideration is usually given to determine the point at which underground mining becomes an economic proposition or even necessary. Thi

    Jan 1, 1997

  • AUSIMM
    The Use of a Computer to Describe Blasting

    By Hengst B

    The first production stage in any mining operation is the breaking of whole rock into fragments small enough for loading and subseq- uent handling. This primary fragmentation is most frequently acc

    Jan 1, 1977

  • AUSIMM
    Planning Stable Post-Mining Landforms: The Application of Erosion Modelling

    By Riley S. J

    The basic aim of mine planning is to design mine layouts and schedules that achieve optimisation of operations, minimum cost and maximum resource recovery. Successful accomplishment of this aim is f

    Jan 1, 1994

  • AUSIMM
    Mineral Processing to the Year 2001: Expected Changes

    The direction taken by mineral processing in the next 20 years will be determined by sharing of Australia's resources to fill world needs; by the low energy costs in Australia; by environmenta

    Jan 1, 1981

  • AUSIMM
    Description of Continuous Lead Refinery at the Works of the Broken Hill Associated Smelters Proprietary Limited, Port Pirie, South Australia

    In the new refinery, at the works of the Broken Hill Associated Smelters Proprietary Limited, situated at Port Pirie, South Australia, the refining routine is similar to that carried on in the old one

    Jan 1, 1932

  • AUSIMM
    Assessment of Stemming Plug Plastic Elements to Improve Blasting Gases Confinement in Escondida

    By M F. Navarrete

    During 2003, different plastic stemming plugs (Cats«, Stemtite«, and Taponex«) were tested in EscondidaÆs Mina Sur, to determine the effect on gas retention time when used in conjunction with drill cu

    Jan 1, 2004

  • AUSIMM
    Hydrology of Final Void and Spoil Catchments

    Reliable predictions of the long-term water quality and water level fluctuations in a final void are vital if mine operators propose to decommission final voids in open cut mining operations. The catc

    Jan 1, 2003

  • AUSIMM
    Optimising the Production Chain from Resource to Product

    By P Cameron

    Many products and technologies have been developed from outcomes of research projects carried out by the Julius Kruttschnitt Mineral Research Centre (JKMRC). When these products and technologies are a

    Jan 1, 2002

  • AUSIMM
    Milling at Mount Isa

    An account of milling "methods and costs at Mount Isa Mines Limited up to the year 1938 has been published. The present paper outlines the methods since adopted in the milling of lead-zinc ores a

    Jan 1, 1953

  • AUSIMM
    Developments in the Use of Waikato Refractory Clays

    The refractory industry in New Zealand is small, consisting of two main manufacturers - one at Huntly and the other at Kamo. Together these would have an annual refractory production of about 30 000 t

    Jan 1, 1976

  • AUSIMM
    A New Approach to Mining Research in Canada

    By A Galley, M Plouffe, T Hynes

    Canadian mining research has recently been reinvigorated through a pan-Canadian research strategy driven by the industry, the research community and government departments. These organisations have co

    Jul 10, 2012

  • AUSIMM
    Transport And Its Relationship To The Mining Industry

    Transport technology has produced social changes since the invention of the wheel five millenna ago when man was freed from the need to expend large amounts of energy to move goods and people. Fur

    Jan 1, 1973

  • AUSIMM
    Two- and Three-Dimensional Numerical Analysis of the Interaction Between Open Pit Slope Stability and Remnant Underground Voids

    By M E. Pierce

    Recent advances in comminution and heap leach technology have resulted in the development of many large-scale, low-grade open pit mines that coincide with areas of historical underground workings. Two

    Jan 1, 2003

  • AUSIMM
    Responding to the Challenge - Necessity Driving Circuit Change

    By R Barrette, V Lawson

    Over the last year at Clarabelle Mill, three circuit reconfigurations were implemented. One circuit reconfiguration, æA CleaningÆ, was initiated due to a furnace failure at the smelter complex, and tw

    Oct 29, 2012

  • AUSIMM
    Hole to Hole Interaction in Production Blasting at Mount Tom Price

    By McKenzie C. K

    During a programme of explosive performance evaluation at Hamersley Iron, Mount Tom Price Mining Operations, the relative performances of a range of heavy ANFO explosives were compared during normal

    Jan 1, 1990

  • AUSIMM
    Application Of ICP Analysis To Geochemical Prospecting-2

    Systematic ICPES (Inductively coupled plasma emmission spectrometry) analysis of magnetic concentrates from drainage samples has been used to discriminate concentrates dominated by magnetite from

    Jan 1, 1987

  • AUSIMM
    Textural Evaluation of Nickel Sulphide Gossans

    By Travis G. A

    The Mons Cupri Cu-Pb-Zn deposit is situated within a complex Archaean volcanic sequence dominated by rhyolitic fragmental rocks. This sequence is underlain by a 150 m group of rhyolitic ash flow t

    Jan 1, 1973

  • AUSIMM
    Large Vibrating Screens and New Applications Challenge for the Future

    During the last century Allis-Chalmers has supplied many screens of various types to industry, from revolving screens to the large capacity highly efficient screen available today. The features in

    Jan 1, 1984

  • AUSIMM
    A Practical Method of Approach to the Problems of Mineral Flotation

    Response of a mineral to anionic and cationic flotation reagentsvaries with the nature of the mineral and the particle size. A ruleis deduced for the selection of the correct type of reagent, which le

    Jan 1, 1963

  • AUSIMM
    The McArthur River Project (734176fa-ffb4-43c7-95c3-495d0f273632)

    The HYC mineral deposit at McArthur River is about 1.5 kilometres long by 1.0 kilometres wide and 55 metres thick, and contains 227 000 000 tonnes of ore of average grade 9.2% Zn, 4.1% Pb and 41 g/

    Jan 1, 1984