Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Geomorphology of the Channel Iron Deposit in Bungaroo Valley - The Formation of an Irregular Basal Topography and its Impacts on Resource Recovery

    By L Terrusi

    The Bungaroo Valley hosts a concealed Tertiary channel iron deposit (CID) along a 17 km stretch of its length. Bungaroo Valley is approximately 0.5 km wide upstream at its easternmost extent, and 3.5

    Jan 1, 2007

  • AUSIMM
    Characterisation of respirable dust generated from full scale laboratory concrete cutting tests with conical picks at three stages of wear

    By S Slouka

    Airborne rock dust poses serious long-term health complications to workers in the underground mining and civil environment where rock excavation is utilised. During drilling, airborne rock particles a

    Oct 12, 2022

  • AUSIMM
    Taming the dragon – the art of transitioning from reactive to proactive tailings management through strategic operator engagement

    By C N. Hatton, K Ward

    Tailings operations are inherently reactive as operations personnel continuously contend with a concentrator reject feed (tailings) transient in physical and engineering properties, which places a con

    Jul 1, 2021

  • AUSIMM
    Quality programs (QAQC) on Sample Stations – a prerequisite to achieve standards requirements and perform a robust reconciliation

    By O Dominguez

    Mine value chain reconciliation (MVC) is a necessary procedure to evaluate a mine’s performance against the assumptions and models used to plan mining and processing operations. Using nomenclature fro

    Mar 22, 2022

  • AUSIMM
    Kiruna Iron Ore Mine - Operations Today and Plans for the Future

    The difficulty in creating and obtaining a competitive edge in the mineral industry is rapidly increasing. The Kiruna Iron Ore Mine in the far north of Sweden is currently thriving on the world mark

    Jan 1, 1997

  • AUSIMM
    Dust Management - Thinking Outside the Square

    Dust emissions from mining, material processing and ship loading operations (fugitive dust sources) are an environmental issue of increasing concern to both government regulators and the community. Th

    Jan 1, 2009

  • AUSIMM
    Building better bow-ties – common pitfalls in risk analysis

    By B Beale

    Bow-tie analysis is a commonly used tool to identify and display risks that have the potential for an undesired hazardous event. The output of the analysis are bow-tie diagrams, which are an effective

    Apr 16, 2024

  • AUSIMM
    Opportunities for Partnerships in Contract Mining

    The underground mining of a narrow vein hard rock orebody is a capital and labour intensive method of extraction. Due to the nature of underground mining it is difficult for higher level managers to p

    Jan 1, 2006

  • AUSIMM
    Computer Assessment of Grades and Tonnages in an Operating Open-Pit Mine

    Digital computers, by virtue of their capacity for high speed repetitive calculation at low cost, are finding increasing application to routine calcula- tions in the mining industry. In this paper te

    Jan 1, 1971

  • AUSIMM
    Computer Based Design of Rehabilitated Strip Mine Landforms

    By Roe P, Lowell A

    This paper outlines software development and design work carried out by Mincom Pty Ltd in collaboration with Capricorn Coal Management (CAPCOAL) for computer based design of rehabilitated strip min

    Jan 1, 1991

  • AUSIMM
    Bendigo Mine Grade Control

    Bendigo is AustraliaÆs second-most productive goldfield, having produced some 22 million ounces of gold between 1851 and 1954. Bendigo Mining Limited (BML), the sole lease-holder of the Bendigo Goldfi

    Jan 1, 2006

  • AUSIMM
    Advances in Dense Medium Cyclone Plant Design

    By G Gibson, B Bessen

    In coal preparation, large dense medium cyclones (DMC) at low pressure heads (typically 9D where D = cyclone diameter) are the norm. This contrasts with high density mineral applications where, largel

    Jan 1, 2009

  • AUSIMM
    Drift and Fill - The High Value, High Recovery Mining System

    By M English, M Yumlu

    At times of high metal prices, mining projects that have previously been put into the ætoo hard basketÆ are now being more closely examined. Typically these projects include the potential recovery of

    Jan 1, 2008

  • AUSIMM
    Rainfall Patterns Rather than Climate Classification Control Cover Design for Closure

    By T Baumgartl, B Richards

    Covers on waste rock and tailings remain the primary choice for closure planning where the purpose is to create an environment where water ingress into reactive material can be controlled and/or preve

    Jun 28, 2016

  • AUSIMM
    Introduction of Electric L.H.D.Æs at Rosebery Engineering Aspects

    Production implications of the introduct- ion of electric L.H.D. units in sublevel open stoping and pillar recovery at Rosebery are covered by Faulkner (1982) and Carlton (1982). The following engin

    Jan 1, 1982

  • AUSIMM
    All-Flotation at North Broken Hill Limited

    IN this paper the author's intention is to convey a brief resume of the lead flotation treatment and lead flotation machines, which have replaced the May jigs and Wilfley tables at the plant of t

    Jan 1, 1930

  • AUSIMM
    The Broken Hill Proprietary Company Limited. (Iron and Steel Works.) The Basic Open Hearth Process

    By Walker E. R

    IN the early age of steel it was made hy what is known as the cementation proeess, in which wrought iron was embedded in charcoal and heated in a mufflc furnace to a tcmperature of approximately 1100&

    Jan 1, 1930

  • AUSIMM
    Copper Smelting in South Australia The First Fifty Years

    By Drew GJ

    Smelting is a process in which heat is applied to ores to produce metals. Impurities are removed by segregation in the slag, or converted to gases or sublimates and discharged up the flues. Mate- r

    Jan 1, 1987

  • AUSIMM
    Post-Permian Subsidence and Tectonics, Vulcan Sub-Basin, North West Shelf, Australia

    Tectonic subsidence plots have been calculated for well, extrapolated-well and significant off-well (seismically-based) locations in the Vulcan Sub-basin and adjacent highs (western Timor Sea). The su

    Jan 1, 1990

  • AUSIMM
    Globally Optimising Open Pit and Underground Mining Operations under Geological Uncertainty

    By R Dimitrakopoulos, K Kawahata, L Montiel

    A method that optimises mining complexes that are comprised of multiple processing destinations, open pits and underground operations is presented. Mining, blending, processing and transportation deci

    Nov 24, 2014