Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Optimisation of Installed Mill Power Post-installation of Secondary Crushing Circuit at Northparkes Mines

    By F Kock, Y Sulianto, T Trott, B G. Putland, D Morgan

    "Northparkes installed and commissioned a secondary crushing circuit in 2010 to debottleneck the semi-autogenous grinding (SAG) mill constrained grinding circuits. Following further improvements to th

    Oct 10, 2016

  • AUSIMM
    A cost-effective tool to assess iron ore products and optimise their operations in blast furnaces towards decarbonisation – state-of-the-art CFD models

    By X Yu, Y Shen

    The iron ore products should be assessed in terms of in-furnace behaviour and overall furnace performance, their operation should also be optimised under industry-scale blast furnace (BF) conditions,

    Sep 18, 2023

  • AUSIMM
    An Overview of Current Planning and Production Systems at McArthur River Mine

    By M Gwynne

    McArthur River Mine is located approximately 50 km south-east of the NT township of Borroloola and approximately 120 km from the Gulf of Carpentaria. The mine hosts a series of layered shallow dipping

    Jan 1, 1998

  • AUSIMM
    Investigation and Development of Pasminco No 5 Ventilation Shaft, Broken Hill

    By de Bruin J H

    A method new to Australia was used for sinking a vertical shaft at Broken Hill in the development of Pasminco Southern Operations No 5 Ventilation Shaft. The 6 m diameter shaft of 820 m depth was plan

    Jan 1, 1993

  • AUSIMM
    Viscosity and Composition Relationships in Kalgoorlie Nickel Smelter Slags

    By Segnit ER, Boow J

    The start up operations of Western Mining Corporation's Kalgoorlie nickel smelter encountered troubles due to the high magnesia content of the concentrates. The flash smelter slags, with highe

    Jan 1, 1980

  • AUSIMM
    Improving the prediction of stope hanging wall dilution – a critical factor to the success of Dugald River

    By J Player, R de Vries, J F. Carswell, R Hassell

    "The feasibility of Dugald River mine was highly sensitive to mining and geotechnical design assumptions, particularly stope dilution and strike length. Following the start of initial mine development

    Oct 16, 2017

  • AUSIMM
    Implementation of the BIOX® process at the Runruno Gold project

    By J A. van Niekerk, J G. Jardine, J W. Olivier

    The Runruno Gold Project is located on the island of Luzon, approximately 200 miles north of Manilla in the Philippines. The mine is an open cut operation and uses the proven BIOX® and carbon-in-

    Sep 11, 2017

  • AUSIMM
    Testing of Soil Covers for Waste Rock in the Ronneburg WISMUT Mine Closure

    By S Jahn, M Noel, E M. Rykaart, M Pau

    Three soil cover test areas were constructed on waste rock backfilled into the Lichtenberg Pit, near Ronneburg Germany. A fourth, uncovered area was included as a control. Each test area measures 50 m

    Jan 1, 2003

  • AUSIMM
    The Obuasi Mine - Longitudinal Retreat Mining Method Application and Challenges

    By F Owusu-Mensah, F Nsarko

    The Obuasi Mine has been in operation for the past 100 years. Within this period a host of mining methods have been employed during its various changing phases. The causes for the changes are multiple

    Mar 26, 2012

  • AUSIMM
    Some Performance Characteristics of Ammonium Nitrate-Based Explosives

    By Hagan T. N

    Quite apart from economic considerations, the following performance parameters must be considered when selecting an explosive for a particular blasting operation. 1. total energy yield/kg, and more

    Jan 1, 1974

  • AUSIMM
    Optimisation of constant rate of loading slurry consolidometer testing of fine-grained coal tailings

    By D J. Williams, S Islam

    Fine-grained coal tailings slurry undergoes only limited settling and self-weight consolidation, and tends to remain slurry-like and unsuitable for conventional laboratory consolidation testing. In ad

    Jul 23, 2018

  • AUSIMM
    A Further Study on the Attenuation Laws of Blasting Vibration Frequency

    By M Chen, G H. Wang, J R. Zhou, P Yan, W B. Lu

    Blast vibration analysis is one of the important topics in the control technology of blast vibration damage. Nowadays, blasting vibration safety standards are based on both the particle velocity and t

    Aug 24, 2015

  • AUSIMM
    The Role of Evaporitic-Shale Sediment Packages in the Localisation of Copper-Gold Deposits: Copper Canyon Area, Cloncurry

    By J I Stewart

    The Copper Canyon deposits, occur in proximity to the regionally distinctive formational boundary between the Staveley Formation and Marimo Shale. The mineralisation here is associated with breccias

    Jan 1, 1994

  • AUSIMM
    The Refurbishment of the Terrace and Mt Victoria Tunnels, Wellington, New Zealand

    By T J. McGavin

    This paper examines the fire life systems implemented in two existing tunnels and discusses whether the standards used were appropriate. It focuses on the Terrace Tunnel as this upgrade and refurbishm

    Sep 17, 2014

  • AUSIMM
    Geotechnical Factors Affecting the Surface Placement of Process Tailings in Paste Form

    By D J. A Van Zyl, J C. Cunning

    Technological advances associated with the expanded application of paste technology in underground mine backfilling are now stimulating an interest in the disposal of process tailings as paste in the

    Jan 1, 1998

  • AUSIMM
    Assessment of climate risk in the Australian mining industry

    By M Allen

    By its nature, the mining industry is energy and emissions intensive. In the future, the world will still require the outputs of mining but the industry will need to adapt to the low emissions economy

    Jul 25, 2018

  • AUSIMM
    Project Management for All Seasons ù Financial Risk Mitigation in a Challenging World

    By O C. Aitken

    Mining project developers are committed to taking on all the challenges and obligations of financial risk management. It is interesting that our current models of project finance have not changed mark

    Jan 1, 2004

  • AUSIMM
    Pillar Extraction at the Doe Run Company, 1991-1998 (82799d0e-2b30-4c7e-911c-ac1c973112a1)

    By Yanske TR, Lane WL

    The Doc Run Company and its predecessors have been mining for over 130 years utilising the room and pillar mining method. This method has left approximately 20 per cent of the orebody in the remaini

    Jan 1, 1998

  • AUSIMM
    Construction and Maintenance of Underground Mine Roads

    By Seedsman R. W

    Good roads are essential in moving men and materials to and from the underground workplace. Coffey Partners International Pty Ltd (Coffey) has recently completed a underground coal industry funded p

    Jan 1, 1995

  • AUSIMM
    Optimum Dig Lines for Open Pit Grade Control

    By I Treloar, T Elenbaas, E Isaaks

    Critical reviews of grade control generally focus on blasthole sampling and the estimation of ore control block model (OCM) grades, with little or no attention given to dig-line design. For example, t

    Aug 18, 2014