Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Geomechanical modelling of the Ernest Henry iron oxide copper gold deposit – identifying fluid pathways to predict potential mineralised zones

    By J G. McLellan, B Miller

    Copper and Gold mineralisation at the Ernest Henry deposit is bound by two controlling shears along the hanging wall and footwall margins. The shear zone geometries have been influenced by a large dio

    Sep 20, 2017

  • AUSIMM
    The practicalities of effective stress measurement in rock

    By I Gray

    This paper examines the practical limitations that affect the measurement of stress in rock. As most rock stress measurement is conducted through the invasive process of drilling a hole in a rock mass

    Nov 30, 2018

  • AUSIMM
  • AUSIMM
    Extension of the Rosebery Mine by Decline Access Below 17 Level

    Access to the Rosebery Orebody, which dips into the western slopes of Mount Black at 45¦, has been achieved in sequence by the following means: - A series of adits down to 8 level - An inclined shaf

    Jan 1, 1982

  • AUSIMM
    Investigation on Collector Optimisation in the Reverse – Iron Ore Flotation

    By M S. Cassola

    It’s expected that the world economy will face a stable and continuous growth in the demand of iron ore, reaching more than two billion tonnes per year within the next year. After decades exploiting r

    Jul 11, 2011

  • AUSIMM
    Designing Energy Efficiency Assessments that Work - Thiess Australian Mining û Case Study

    By P Crittenden

    Thiess Pty LtdÆs Australian Mining business unit used 7.6 PJ of energy in the 2007/2008 financial year. This represented more than 85 per cent of Thiess Pty LtdÆs total energy use and therefore meant

    Jan 1, 2009

  • AUSIMM
    A Change in Graphite Depressant to Improve the Recovery of Zinc at MMG Century Mine

    By R Wynn, N Stoitis, R A. Lauten, H Liang

    At the Century mine in North West Queensland, MMG produces lead and zinc concentrates. The current production rate is close to 500 000 t of zinc per annum. Graphite is the main gangue in the orebody a

    Sep 1, 2014

  • AUSIMM
    Is a 2.5áper cent Success Rate Good Enough? Traditional Mine Development Methods have the Tail Wagging the Dog

    By J Jackson, D C. Curry, A C. Keith

    Australian Bureau of Statistics (ABS) data shows that since 2006 the balance of capital costs associated with mine development has become weighted greater than 75 per cent to enabling infrastructure a

    Sep 29, 2013

  • AUSIMM
    Modelling multi-seam interactions for longwall mining

    By A Lines

    This paper addresses a gap in longwall multi-seam interactions and their predictions, providing a case study for future multi-seam operations for both anticipated conditions and a method for understan

    Nov 30, 2018

  • AUSIMM
    State-of-the-Art in Tunnel Ventilation Systems Design – Applicable Options to Meet Fire-Life-Safety Code Requirements

    By P C. Miclea

    Transportation networks extend every day around the world, requiring safe and well-maintained structures for efficiency and for users’ safety. Due to specific features of the infrastructure, such as l

    Mar 8, 2011

  • AUSIMM
    Continuing Education for the Australian Mining Industry Workforce

    By T O Aspinall

    The Australian mineral industry involves a diverse range of expertise and skills. Within that, the mining industry, representing mine planning, mine management and equipment operation, has capital i

    Jan 1, 1994

  • AUSIMM
    The Roy Hill Project

    By J M. F Clout

    The Roy Hill Project is an independent integrated port, rail and mine development in the Pilbara region of Western Australia. The bankable feasibility study for the project was completed in January 20

    Jul 11, 2011

  • AUSIMM
    Ultra-Deep Hoisting Technology at Moab Khotsong

    By M Dohm, L Pretorius

    This paper provides a brief historical background to the approximately 12-year project that led to the revision of rope selection factors in the South African regulations, thus providing the ability t

    Jan 1, 2005

  • AUSIMM
    The Approvals Process Through to Mining Lease Grant for a Small-Medium Sized Mining Development: The Mt Sinvit Gold Projects, East New Britain Province

    The Mt Sinivit gold project is located approximately 50km SSW of Rabaul in the Baining Mountains of the Gazelle Peninsula, East New Britain Province. The deposits were discovered in mid- 1983 and fo

    Jan 1, 1997

  • AUSIMM
    Calibration of post blast gas simulation using mine site readings

    By F C. D Michelin

    Blast fumes are a significant health risk to underground workers, containing several dangerous gases such as carbon monoxide (CO), nitrogen oxides (NOx) and ammonia. To ensure safe working conditions,

    Oct 12, 2022

  • AUSIMM
    Dewatering the Bowmans Trial Pit

    By Waterhouse J. D, Harris B. M

    This paper briefly describes the construction in 1979/80 of a 70m deep trial open pit coal mine near Bowmans S.A. and describes more fully the hydrogeological aspects of the exercise. The primary p

    Jan 1, 1981

  • AUSIMM
    Preventing unwanted events critical controls – success and failure in implementing the ICMM guidance

    By A P. Wilkinson

    This paper reports on the implementation of the critical control concept to manage material risks in the mining and metals industries. The critical control management (CCM) approach assumes it is bett

    Apr 16, 2024

  • AUSIMM
    Negatively Geared Ore Reserves – A Major Peril of the Break-even Cut-off Grade

    "Recognising that the mining industry is wedded to the break-even cut-off grade rather than a cut-off grade that optimises value, the author examines some perils and pitfalls in the use of break-even

    Mar 8, 2016

  • AUSIMM
    Practical Considerations when using Auxiliary Axial Flow Fans as a Primary Mine Fan

    By D Roughsedge, J van der Sandt, L van den Berg

    Axial flow fans are commonly used as auxiliary fans in underground mines to supply air to development headings. As diesel dilution requirements increase the fans used in conjunction with ventilation b

    Jul 1, 2013

  • AUSIMM
    Introducing and Sustaining a Continuous Improvement Program in Mines and Smelters

    By M Costa, L Polizzi

    Process optimisation and continuous improvement are usually acknowledged when making a process more effective, efficient and transparent. During the last few decades, thousands of companies around the

    Sep 1, 2014