Search Documents

  • DFI
    25 Story Structure On River Flood Plain Soils Improved By Vibrocompaction And Compaction Grouting

    By Frank Callanan

    The Ameristar Casino expansion project included the design and construction of a 25-story hotel and 9-story parking structure expansion. The site is located in a floodplain on the banks of the Missour

    Jan 1, 2009

  • DFI
    CPT - Guided Installation Of Pressure-Grouted Displacement Piles

    By Mark M. Petersen

    As part of the addition of eight new combined cycle generating units at the Florida Power & Light Sanford Plant, 2,129 piles were to be installed. The existing plant elements were supported on driven

    Jan 1, 2002

  • NIOSH
    IC 9048 Literature On The Revegetation Of Coal-Mined Lands: An Annotated Bibliography

    By David L. Veith

    This Bureau of Mines bibliography of U.S. and Canadian literature pertaining to revegetating coal-mined lands contains 805 references published from 1977 to 1984. Each reference is evaluated by keywor

    Jan 1, 1985

  • NIOSH
    OFR-28-82 Borehole Location System Concept Demonstration Tests

    By T. C. Moore

    This report describes the feasibility test of an electromagnetic method for locating boreholes, with or without casing, that have been drilled in conjunction with mining operations but whose location

    Jan 1, 1978

  • SME
    Project and Mining Geology

    By Donald A. Ranta

    Every mineral project or mine is based on a geologic entity-an ore (mineral) deposit. A well-defined mineral deposit and its associated geologic characteristics are the only aspects of a project that

    Jan 1, 2008

  • DFI
    The Effectiveness Of The Monotube Pile Taper At The Highway 280 Pile Uplift Test Site ? Introduction

    By Samuel J. Kosa

    The Monotube is a uniformly tapered high-strength steel shell pile manufactured for friction pile applications. The Monotube pile was developed in the early 1920's in Canton, Ohio. Its first comm

    Jan 1, 1993

  • AUSIMM
    Maximising the Operational Benefit of Capital Investment Via Computer Simulation

    In the minerals industry allocating capital for setting up a new project or for upgrading an existing facility usually requires that a compromise be found between the initial cost of equipment, its

    Jan 1, 1990

  • AUSIMM
    Description of the Shear Stree Distribution around and Excavation at WIPP

    The estimation of the shear stress distribution around an excavation is important to the design of the excavation since shear stresses can generate cracks, loosen grain boundaries or otherwise degrade

    Jan 1, 1998

  • NIOSH
    Silicosis

    By S. L. Weber, D. E. Banks

    "Silicosis was first reported by the ancient Greeks and is apparently as old as human history. The prevalence of this illness peaked in the last half of the 19th century and the early part of this cen

    Dec 1, 1995

  • SME
    Evaluation of Pollution of Mining Areas in Aspect of their Future Use and Development

    By D. J. Pyra, J. Kudelko, Korzekwam W.

    Polkowice region (Lower Silesia, Poland) is an area, where the copper mining activity started about 40 years ago and new technologies were applied. There are 3 underground mines, 3 processing plants,

    Jan 1, 2005

  • CIM
    Successful Design of the NICO Grinding Circuit for Unusually Hard Ore

    By Mike Samuels, John Starkey

    "This paper examines test results and grinding mill design for the recent Fortune Minerals’ NICO Project, located in the Northwest Territories. SAG milling and rod milling options are compared. Rod mi

    Jan 1, 2010

  • CIM
    Formulation and Plant Trial of a Mixed Collector Suite For Eland Platinum

    By Norman O. Lotter, Dominic Fragomeni, Jorge Oliveira, Dee J. Bradshaw, Rebecca Monnapula

    "The role of mixed collectors in enhancing the metallurgical performance of sulphide flotation processes was reviewed in 2008, and later published as an integrated theory by Lotter and Bradshaw, 2009.

    Jan 1, 2011

  • SME
    Developing Trees Tolerant to Degraded Mine Soils in an Underground Greenhouse Mining, Metallurgy and Exploration

    By Michael Kukay, Paul Conrad, Cosmas Opoku-Ware

    This project is exploring the potential for developing trees tolerable to degraded un-reclaimed mine site soils and tailings as a solution to re-establishing long-term tree growth on those sites. The

  • NIOSH
    RI 5597 Studies Of Several Flocculants To Improve Hydraulic Backfill Characteristics ? Introduction

    By John D. Bardill

    A cooperative project between the Bureau of Mines, Department of the Interior, and the Montana School of Mines, investigating results of hydraulic systems for transporting sand slurries for emplacemen

    Jan 1, 1960

  • AUSIMM
    Shaft Plumbing at Mount Isa

    In the plumbing of vertical shafts the methods employed and equipment used, are generally made to best suit existing conditions. Undoubtedly, there is no method that can be called standard or that can

    Jan 1, 1940

  • SME
    Impacts Of Ground Convergence On TBM Performance In Ghomroud Tunnel

    By Ebrahim Farrokh

    Ghomroud water conveyance tunnel project is under construction using shield Tunnel Boring Machines (TBM) for a total length in excess of 50 km. Phase 1 of the project included 36 km of tunnel divided

  • SME
    Remediating Historic Mine sites in Colorado

    By James Dunn

    “The strongest argument of the detractor (of mining)is that the fields are devastated by mining operations ...They argue that the woods and groves are cut down, for there is need of an endless amount

    Jan 1, 1999

  • CIM
    The impact on underground ventilation of the reduction of diesel emissions toxicity by water-in-oil fuel emulsification

    By J. P. Mogan, E. D. Dainty, A. Lawson

    "The toxicity reduction of emissions from two diesel engines by the emulsification of water into fuel oil was investigated to determine the applicability of such systems to underground mining machiner

    Jan 1, 1981

  • DFI
    Pile Design, Testing, And Installation For A Gated Dam ? Synopsis

    By B. H. Moore

    The opportunity to evaluate the pile design procedures used on a major project is an infrequent occurrence. It is even more infrequent that the project involves piles with significant tension and hori

    Jan 1, 2010

  • AUSIMM
    Determination of Fracture Toughness of Anisotropic Rocks Under Water Vapour Pressure by Semi-Circular Bend Test

    Failure of rock materials is a process of crack propagation. Crack initiation takes place when the crack tip stress intensity K reaches a critical value called fracture toughness, K1C. The rock fractu

    Dec 6, 2010