Search Documents

  • AIME
  • SME-ICGCM
    Geotechnical Factors Influencing A Time-Dependent Deformation Mechanism Around An Entry In A Dipping Seam

    By M. K. Larson

    The U.S. Bureau of Mines and Cyprus Shoshone Coal Corp. conducted a study of deformation mechanisms in strata around a longwall gate road system at two sites in an underground coal mine near Ham, WY.

    Jan 1, 1996

  • SME
    Warm Springs Ponds: Superfund Success

    By Harry E. Hughes

    A section of the largest Superfund site in the country has become a success story for engineering innovation and for cooperative problem solving. “Superfund site” and “success story” are phrases that

    Jan 1, 1996

  • AUSIMM
    Road Haulage of Ore by Peko Mines N.L.

    With the proving of a mineable orebody at Orlando in May 1961, Peko Mines N.L. was faced with the decision of whether to mill the ore on site or to haul it 25 miles to central facilities at Peko. Orla

    Jan 1, 1966

  • CIM
    Suivi non-destructif de l?évolution de la résistance mécanique des remblais cimentés en pâte: application de la résistivité et de la micro-sismique en laboratoire

    By Serge Ouellet

    Résumé Six modèles métriques de remblai cimenté en pâte (RCP) ont été suivis durant 120 jours par l?utilisation de deux méthodes géophysiques non-destructives : la résistivité et la micro-sismique.

    Feb 1, 2008

  • ISEE
    The New Progress in the BGRIMM Emulsion Explosives Technology

    By Wang Xuguang, Zhang Xiaozhi, Li Guozhong, Xiong Daiyu

    The emulsion explosive is a new kind of water-based industrial explosives that was developed at the end of 1960s. In the 1970s, BGRIMM invented EL-series emulsion explosive that created a new era of w

    Jan 1, 2003

  • CIM
    Contrasting Kimberlites and Lamproites

    By Barbara H. Scott Smith

    "During the last two decades lamproites have joined kimberlites as the only two known primary sources of economic quantities of diamonds. This paper contrasts the petrography, primary and xenocrystic

    Jan 1, 1992

  • SME
    Contribution to sustainable development through alternative dumping concepts for coal mine waste dumps in Vietnam

    "Quang Ninh province is located in the north east of Vietnam and the coal mining in the province generates two thirds of the province’s GDP. The coal is extracted from both open pit and underground mi

    Jan 1, 2011

  • SME
    RETC 2015 Full Proceedings - RETC2015

    By Shemek Oginski, MARK C. JOHNSON

    All Rights Reserved. Printed in the United States of America. Information contained in this work has been obtained by SME, Inc. from sources believed to be reliable. However, neither SME nor its autho

    Dec 1, 2015

  • CIM
    The Origins of Pressure Hydrometallurgy

    By F. Habashi

    The pioneer work on pressure hydrometallurgy was conducted in Russia at the end of the nineteenth, and the beginning of the twentieth centuries, by Karl Josef Bayer (1847-1904) and Vladimir Nikolyevit

    Jan 1, 2004

  • CIM
    Froth Phase Study of Coal Flotation in a Hybrid Mechanical Flotation Column

    By J. -C. Sztuke, M. Cao

    ABSTRACT The correlations between froth recovery of coal and air recovery were investigated using a hybrid mechanical flotation column. The particle slurry was fed onto the surface of air-water two ph

    Jan 1, 2013

  • IMPC
    Application of the Microwave Technology for the Processing of Iron Hydroxisulphates Recovered from Lignite Mine Acid Water

    By H. Z. Kuyumcu

    Associated with the development of a novel microbiological oxidation process for the conditioning of iron hydroxide slurries from ferrous mine waters, there is a realistic chance to make the contained

    Jan 1, 2014

  • AUSIMM
    Optimising carbon reactivation kiln operation

    By R Bezuidenhout, J K. Claflin, S R. La Brooy, G M. Wardell-Johnson, A M. Claflin

    Best practice gold (Au) recovery is not an accident. It is the result of proper operation of the adsorption circuit using good quality activated carbon. A conventional carbon ‘regeneration’ kiln canno

    Sep 11, 2017

  • AUSIMM
    Laboratory Experiences in the Heat Hardening of Australian High Grade Iron Ore Pellets

    By OÆBrien R. T

    A small static bed was used to study the thermal cycles required for the heat hardening of pellets based on synthetic magnetite concentrates and a naturally fine hematite. This apparatus can be employ

    Jan 1, 1963

  • CIM
    Advances in Drilling & Blasting Control at Barrick?s Pierina Mine

    By Will Callupe Arzapalo

    The success of the minimization of blast induced-damage at Barrick?s Pierina Mine in Peru is the result of an effective working relationship between Mine Operations and the Geotechnical Services Depar

    May 1, 2006

  • AUSIMM
    Mine Site Environmental Management and Sustainable Post-Mining Land Use in New South Wales, Australia

    The Department of Mineral Resources has a statutory responsibility for mine site environmental management and control in New South Wales. The Department is focusing on an environmental management syst

    Jan 1, 2002

  • CIM
    Climate and Hydrology Data Collection for Northern Mine Development

    By Nathan P. Schmidt

    Climate and hydrology data are required during all phases of mining projects, including impact assessment, mine planning and design, operational water management and mine closure and reclamation desig

    May 1, 2004

  • AUSIMM
    Are Blasthole Samples that Bad and Reverse Circulation Samples that Good for Open Pit Grade Control? Story of a Trade-Off

    Past arguments advocating reverse circulation sampling against blasthole sampling are reviewed to present the debate under a different light. The advantages and disadvantages of each drilling method a

    Mar 1, 2010

  • AIME
    The Degassing Of Metals

    By A. L. Marshall, F. J. Norton

    THE object of this investigation was to make a comprehensive study of the degassing of molybdenum in order to determine how rigorous a treatment was necessary to completely remove sorbed gases from mo

    Jan 1, 1944

  • DFI
    I-880 Replacement Project (Cypress Freeway) Large Diameter Driven Pipe Pile Foundations Test Program And Construction Test Pile Program - Indicator Pile Test Program - Field Work

    By Darrell L. Beddard

    Pile driving started October 29, 1993 and was completed on January 27, 1994. Field work included driving piling from ground surface at one site and at or near proposed footing elevations for the remai

    Jan 1, 1996