Search Documents

  • SME
    Design and Evaluation of the Roof Bolt Corrosion Test System in a Simulated Underground Coal Mine Environment Mining, Metallurgy and Exploration

    By Kanchan Mondal, Gopi Bylapudi, Anand Bhagwat

    Corrosion of steel roof support systems can cause potential premature failure of the support, thus adversely affecting the excavation stability and rock-related safety. An in-house corrosion test syst

  • SME
    Design and Evaluation of the Roof Bolt Corrosion Test System in a Simulated Underground Coal Mine Environment Mining, Metallurgy and Exploration (7cabb148-285f-4ad0-9583-a6d360323de4)

    By Kanchan Mondal, Gopi Bylapudi, Anand Bhagwat

    Corrosion of steel roof support systems can cause potential premature failure of the support, thus adversely affecting the excavation stability and rock-related safety. An in-house corrosion test syst

  • CIM
    Replacement of Classification Screens with Cyclones in the McArthur River Uranium Mine Grinding Circuit

    By Ken Dyck, Chuck Edwards

    "Cameco's McArthur River is the world's largest high grade uranium mine. Production started in late 1999. Cameco carried out the engineering design and construction management for the McArthur River p

    Jan 1, 2004

  • SAIMM
    Hydraulic mining of an in situ heavy mineral ore reserve

    By M. Berger

    The ‘Metallurgical Operations’ Department of Grinaker-LTA Process Engineering (GLTA) currently undertakes then primary mining as well as the re-deposition of tailings forTicor South Africa (Ticor) at

    Jan 1, 2003

  • DFI
    Deep Foundations On Deer Island

    By Michael W. Oakland

    Deer Island is the site of the Massachusetts Water Resources Authority (MWRA) wastewater treatment plant which, when completed in 1999, will serve 43 cities and towns in central eastern Massachusetts.

    Jan 1, 1994

  • CIM
    Promoting Energy Efficiency Stuidies during Mineral Processing Plant Design

    By A. Tylczak, C. Shook, A. Doogan-Smith, S. Loif, B. Hilscher, P. Nayak

    "This paper discusses how to effectively conduct energy efficiency studies during the design of new mineral processing plants and plant expansions. Energy management studies for new plants are ideally

    Jan 1, 2016

  • SAIMM
    Environmental Considerations In The Preparation Of Bankable Feasibility Documents - Introduction

    By A. A. Smithen

    There is an increasing awareness of the importance of including an assessment of environmental liabilities in the preparation of bankable feasibility documents. This means that environmental assessmen

    Jan 1, 1999

  • NIOSH
    OFR-115-93 Application Of Cost Engineering To Determine The Optimum Production Rate For Waste Remediation Of Mine Tailings

    By Thomas W. Camm

    The U.S. Bureau of Mines has developed a system for estimating mining and processing costs as a function of process feed rate with the objective of applying this system to abandoned mine tailings and

    Jan 1, 1993

  • SME
    Towards a More Cost Effective Mining Truck – Preprint 97-55

    By A. W. Dickerson, G. Hollier, F. A. Bartley

    Following on from many years of research aimed at improving the effectiveness of truck haulage operations in mines operated by BHP Minerals, BHP Research developed a concept for an Innovative Large Mi

    Feb 24, 1997

  • DFI
    Woodrow Wilson Bridge Cofferdams (ef6ed0b3-5c8c-41f1-8337-00ee57bff823)

    By Roderic A. Ellman

    The new Woodrow Wilson Bridge (WWB) will replace the existing bridge over the Potomac River to connect Alexandria, Virginia to Prince Georges County, Maryland. The new WWB will extend approximately 1.

    Jan 1, 2013

  • DFI
    Army Corps of Engineers Seepage Control Cutoffs for Dam and Levees Engineering Manual (EM)

    By David B. Paul

    "ABSTRACTThe US Army Corps of Engineers (USACE) has 704 dams in their inventory and over 100,000 miles of levees with a capital value of over $150 billion. Currently, there are 319 dams that are class

    Jan 1, 2014

  • NIOSH
    RI 5966 Fluorescent X-Ray Spectrography: Determination Of Trace Elements ? Introduction And Summary

    By William J. Campbell

    The purpose of this investigation was to extend the analytical services which are required for Bureau of Mines programs in developing and evaluating high-purity materials. Determination of trace eleme

    Jan 1, 1962

  • AUSIMM
    Cuprous Hydrometallurgy. Part V. Leaching of Copper-Lead Matte with Copper(II) Sulphate in Aqueous Acetonitrile

    By Parker A. J, Giles D. E

    Solutions of copper(II) sulphate in acidified aqueous acetonitrile leach copper from copper-lead matte derived from the drossing of lead with sulphur to produce solutions of copper(I) sulphate. The re

    Jan 1, 1979

  • SME
    McAlpine Mill and Haileybury School of Mines: A Co-op That Works

    By Kevin Beirne

    Most people involved in the mining industry are familiar with student-industry co-op work-study programs. Many colleges and universities have used them for years. Northern College’s Haileybury Schoo

    Jan 1, 1999

  • DFI
    Design And Performance Evaluation Of Bored Piles In Sand

    By Ashutosh S. Dhar

    Cast-in-place piles were examined in this paper from the viewpoints of construction quality, axial capacity, and load-displacement responses. The results of ten 450 mm diameter (18? f) bored piles, in

    Jan 1, 2006

  • CIM
    Application of Multivariate Image Analysis (MIA) to Predict Concentrate Grade in Froth Flotation Processes

    By Pierre Pelletier, Julie Fournier, Gianni Bartolacci, Yves Breau, Dominique Girard, Ahmed Bouajila, Carl Duchesne

    "The development of on-stream analyzers (OSA), such as those based on X-ray fluorescence (XRF), has been key to improve metallurgical performance of flotation processes. However, since these analyzers

    Jan 1, 2003

  • AUSIMM
    Timbering and its Importance in Making Estimates of Cost

    The importance of timbering, not only from a financial point of view but from an actual mining point of view, is so often overlooked or slightly glossed over by the average expert and investor, that I

    Jan 1, 1901

  • IIMP
    Concentradora Atacocha: Reingeniería alta rentabilidad

    By Marcos Villegas

    El presente texto describe el desarrollo del sistema de gestión de riesgos en la reingeniería de procesos, justificando la inversión en gestión de riesgos de la concentradora Atacocha donde se protege

    Sep 9, 2007

  • AUSIMM
    The Code of Practice for Risk Management of Tunnel Works - Future Tunnelling Insurance from the InsurerÆs Point of View

    The objectives of this paper are to introduce the International Code of Practice for Risk Management of Tunnel Works and to illustrate to the participants of the 13th Australian Tunnelling Conference

    Jan 1, 2008

  • AUSIMM
    An Analysis of the Performance of a Ball Mill Rake Classifier Comminution Circuit

    An extensive series of tests was carried out on a ball mill-rake classifier circuit in the New Broken Hill Consolidated Ltd. concentrator. The data were used to develop a mathematical model of the ope

    Jan 1, 1967