  • ISEE
    The Application of Electronic Detonators to Improve Blast Vibration Predictions at Limestone Quarries

    By R. Farnfield, W. Birch

    Arguably, some of the most restrictive statutory blast vibration requirements attached to mineral extraction operations can be found in the United Kingdom. Such limitations are, as a rule for the UK,

    Jan 1, 2006

  • DFI
    Application Of Augered, Cast-In-Place Displacement (ACIPD) Piles In New York City

    By Willie M. NeSmith

    Conventional augered, cast-in-place (ACIP) piles were introduced into the New York City area as a result of the damage to existing structures caused by pile driving operations. ACIP piles are often sp

    Jan 1, 2004

  • SME
    Planning And Preparation For Tunneling At Brightwater West

    By Mina M. Shinouda

    Brightwater West (BT4) represents the state of the art in utility tunneling, namely a long relatively small diameter, soft ground tunnel, with no intermediate shafts, under significant groundwater pre

  • CIM
    The Use of Diagnostic Testwork and CIP/CIL Modeling to Improve the Metallurgical Performance at Two IAMGOLD Operations

    "A simple approach to optimizing the performance of an operating carbon in pulp (CIP) or carbon in leach (CIL) plant is presented. It is possible to reproduce the performance of an operating CIP or CI

    Jan 1, 2011

  • NIOSH
    Development And Application Of Reservoir Models For The Evaluation And Optimization Of Longwall Methane Control Systems

    By S. J. Schatzel, W. P. Diamond, F. Garcia

    Methane explosions have historically been one of the major causes of fatalities and injuries in underground coal mining operations. Advanced numerical models and predictive modeling approaches have th

  • ISEE
    Use of Signature Hole Analysis for Blast Vibration Control at the Highvale Mine

    By Ron J. Elliott, Dylan Wedgewood

    A series of five signature holes were blasted at the Highvale Mine and the resultant seismic data was analyzed to make recommendations on how best to address neighbour complaints regarding blast vibra

    Jan 1, 2018

  • SME
    Tunnelling Under The Harlem River

    By Jacek B. Stypulkowski

    This paper discusses the challenges faced by the design team of the under-river crossings of electric transmission feeders in New York City, a densely populated urban area. The under-river crossing of

  • NIOSH
    RI 5426 Practical Evaluation Of Electrical-Resistivity Surveys As A Guide To Zinc-Lead Exploratory Drilling. Badger-Peacock Camp And Vicinity, Cherokee County, Kans. - Summary

    By L. C. Brichta

    During a study of the Badger-Peacock area from October 1950 to June 1953, the Federal Geological Survey and the Federal Bureau of Mines completed nearly 98 miles of resistivity profiling and drilled 9

    Jan 1, 1958

  • SME
    Operational Practices To Reduce Copper And Other Metals Loading Onto Activated Carbon In Heap Leach CIC Circuits - Introduction - Preprint 09-109

    By B. Cousins

    Copper, nickel, zinc and other ?penalty? metals are found with gold together in nature, and have a similar chemical affinity for cyanide used in leaching operations4. As a result, solutions that come

    Jan 1, 2009

  • AUSIMM
    Ventilating Metalliferous Mines: A Method of Attack Part II

    THE following really forms the second part of, or a sequel to, a paper, " Ventilating Metalliferous Mines: a Method of Attack," read before the Broken Hill Branch of the Australasian Institu

    Jan 1, 1923

  • DFI
    Driven Pile Foundation Design And Construction Genentech Hall - UCSF Mission Bay Campus

    By Robert E. Fosse

    Driven 14-inch-square concrete piles were used as the foundations of Genentech Hall at the new University of California, San Francisco Mission Bay Campus. The five-story, steel eccentrically-braced fr

    Jan 1, 2002

  • SME
    Boart Longyear Coring Bits Pass Field Tests

    Using mines in Canada, Boart Longyear, a leading provider of drilling services and products, has put its Stage 3 Coring Bit to the test and each time the bit has passed the test with great success. A

    Jan 1, 2009

  • CIM
    The Recovery of Rare Earths, Uranium and Pyrite from Pele Mountain’s Proposed Eco Ridge Mine Project

    By Roger Payne, John R. Goode, Feng Gao, James Brown

    The Eco Ridge deposit is located in the Elliot Lake mining camp in Northern Ontario, Canada. Between 1955 and 1996, the area produced more than 138,000 t (300 million pounds) of U3O8 and very signific

    Jan 1, 2014

  • SAIMM
    The History And Development Of The Pyrometallurgical Processes At Evraz Highveld Steel & Vanadium

    By W. S. Steinberg

    Keywords: Pyrometallurgy, furnace, open slag bath, Evraz, Highveld In 1963, the full-scale engineering study for the development of an Iron, Steel, and Vanadium plant was initiated. This was the

    Jan 1, 2011

  • CIM
    Pipeline syphons for economical and simple water transfer (0f637445-7793-433d-94a6-80e764b3d98e)

    By W. J. Dick, K. G. Kress

    A pipeline syphon can be a simple and reliable alternative for water conveyance as compared to otherwise more complex pumping systems or low-level outlet conduits through earthfill dams. In a simple f

    Jan 1, 2005

  • SAIMM
    Pre-sink shaft safety analysis using wireline geophysics

    By N. Andersen

    During the preliminary design phases and feasibility study of a proposed vertical shaft, a vertical diamond drill-hole is normally drilled on the site. This paper outlines how rock mass characteristic

    Jan 1, 2015

  • SME
    Effectively Utilize Voip And Web Compression Technology With Satellite And Other Low Bandwidth Connections To Improve Mine Efficiency And Safety And Reduce Communications Costs

    By M. Haase

    [ ] How important is a robust communications system for your mine site in order to meet operational and safety requirements? Do you currently have VSAT in place and need a low cost, high quality mu

    Jan 1, 2012

  • ISEE
    Crystal Falls Dam Demolition and Protection Techniques Using an Air Curtain

    By Alex Chapman, Cam Thomas, Bryan Karney

    "During the early summer of 1989, Ontario Hydro removed a concrete portion of the North Channel Dam at Crystal Falls Generating Station by blasting and excavating in marine conditions. Because of the

    Jan 1, 1992

  • CIM
    Finite Element Evaluation of the Residual Stress Fields Obtained by Hole Expansion on 6061-T6 Aluminum Welds

    By K. C. Viveros, R. R. Ambriz, C. García, F. De Villèle, A. Talha, D. Jaramillo

    Cold hole expansion on base metal, weld metal and heat affected zone of 6061-T6 aluminum alloy welds was simulated by means of finite element method. Three dimensional compact test models with a previ

    Jan 1, 2014

  • TMS
    Application Of Solvent Extraction To The Treatment Of Industrial Wastes

    By Junji Shibata

    It is important to recover and reuse the metal values contained in various industrial wastes in a viewpoint of environmental preservation. Most of industrial products are made through the processes to

    Jan 1, 1996