Search Documents

  • DFI
    Drilling And Dewatering In An Urban Environmentprivate - Project Description And Location

    By Joel Moskowitz

    In 1990, the United States General Services Administration (GSA) issued a contract for design and construction of a new federal court building in New York City. Mueser Rutledge Consulting Engineers (M

    Jan 1, 1996

  • CIM
    Applying a Customer-Based Approach at Vale’s Clarabelle Mill

    By A. Taylor, J. Shelegey, H. Sullivan, J. Doucet

    "Historically, performance at Vale’s Clarabelle Mill was measured by Mill throughput and Mill recovery. After the economic collapse in 2008, a series of reviews were performed to drive improvements in

    Jan 1, 2012

  • AUSIMM
    Opportunities and Future Directions for Aluminium Smelting Technology

    The 115-year history of the Hall-Heroult process for production of aluminium has been characterised by a sustained technology-driven improvement in costs and productivity. In the past decade the indus

    Jan 1, 2000

  • CIM
    Structure, Stratigraphy, U-Pb Geochronology and Alteration Characteristics of Gold Mineralization at the Detour Lake Gold Deposit, Ontario, Canada

    By B. Dubé, R. Friedman, J. Oliver, R. Aubertin, M. Burson, G. Panneton, M. Hamilton, J. Ayer

    "The Detour Lake gold deposit is located within the northwestern limit of the Archean Abitibi Subprovince of the Superior Province. Mineralized zones are hosted by a sequence of pillowed and massive f

    Jan 1, 2012

  • DFI
    Technical Visit

    By the courtesy of Metropolitana Milanese (Milan Underground), roost of the delegates visited on April 12, 1991 the tunnel of "PORTA VENEZIA" STATION of MILANO RAILWAY LINK. The "PORTA VENEZIA" ST

    Jan 1, 1994

  • CIM
    The Canadian Mineral Processors A Brief History

    By R. J. C. MacDonald

    "The first recorded discovery of placer gold in Canada was on the Chaudiere River in Quebec's eastern townships in 1832 and the first major production came from placer deposits in British Columbia in

    Jan 1, 1998

  • AUSIMM
    The Influence of Alluvial Gold Shape and Density on Discrepancies Between Prospecting and Mining Gold Grades: Implications for Plant Efficiency, Plant Design, and Mine Profits

    By S Adamson

    Morphological analysis of alluvial gold recovered from the same segment of a placer by four common commercial methods indicates that gold shape and the presence of quartz intergrowths or sulphide over

    Jan 1, 2001

  • NIOSH
    RI 9448 - Seismicity and Stress Changes Subsequent to Destress Blasting at the Galena Mine and Implications for Stress Control Strategies

    By P. L. Swanson, F. M. Boler

    The U.S. Bureau of Mimes conducts research at the Galena Mine, Wallace, ID, with the aim of mitigating the effects of rock bursting. Destress blasting is commonly used as a stress control technique at

    Jan 1, 1993

  • TMS
    Electrochemical Characterization And Modeling Of A Solid Oxide Membrane-Based Electrolyzer For Production Of Magnesium And Oxygen

    By Xiaofei Guan, Adam C. Powell, Uday B. Pal, Srikanth Gopalan

    This paper reports a solid oxide membrane (SOM) electrolysis experiment using an LSM– Inconel inert anode current collector for production of Mg and O2 at 1423K. The electrochemical performance of the

    Jan 1, 2014

  • AUSIMM
    ArriumÆs Iron Baron Hematite Beneficiation Plant - A Success from Start to Finish

    By M Bannear, C Stanton

    Since 2008, Arrium has been developing and commissioning a new low-grade hematite ore benefication plant (or OBP) at its Iron Baron mine site.The Iron Baron mine, which was closed in the 1990s, could

    Aug 12, 2013

  • SAIMM
    Sampling mineral commodities?the good, the bad, and the ugly - Synopsis

    A wide range of drill holes and process streams are sampled for resource estimation, grade control, and contractual purposes in the minerals industry. However, despite the availability of training cou

    Jan 1, 2010

  • AUSIMM
    Reverberatory Smelting Plant, Mount Morgan

    During the latter part of 1937 consideration was given to the construction of a; local smelting plant for producing blister copper. Previously copper concentrates had been shipped to the United States

    Jan 1, 1939

  • SME
    A Thermodynamic and Environmental Assessment of Lanthanide Chloride Production from Bastnaesite

    By A. Nivala, S. Ulgiati, M. Canino

    Mining and processing of bastnaesite ore, (Ln)CO3F, for lanthanides extraction is investigated in this paper. This series of elements proved to be applicable for a wide range of high-tech uses. In spi

    Jan 1, 2005

  • CIM
    Optimization of Capital Cost and Smelter Revenue - Integrated Team Rebuild of Barro Alto Furnaces

    By K Belanger, J. Mclachlan, F. Stober, G. Norval, B. Snider, A. Munsch, T. Koehler, E. Piantino, J. Carlos Queiroz

    The project to rebuild the smelting furnaces at the Anglo American - Barro Alto ferronickel smelter, located in Goias, Brasil, was initiated in September 2013. To optimize the capital cost, while maxi

    Jan 1, 2015

  • SME
    Improved Leaching Performance Of Chalcopyrite By Microbial Cultures Subjected To Mutation

    By J. Kang

    To obtain microbial cultures with the ability to efficiently leach copper ion from chalcopyrite, microbial samples from acid mine drainage sites were mixed and then subjected to mutation using sodium

    Jan 1, 2008

  • AIME
    Reservoir Engineering – Laboratory Research - Linear Waterflood Behavior and End Effects in Water-Wet Porous Media

    By J. R. Kyte, L. A. Rapoport

    The material balance equation for partiai or complete 1:trter-drivc reser1,oir.s been re-arranged to include a pressure irrferferencr ternr. This pressure interfernce term was ohtained from the theo

  • CIM
    In Situ Fracturing Mechanics Stress Measurements to Improve Underground Quarry Stability Analyses

    By Anna M. Ferrero

    Stability condition of underground excavations have to be assessed to guarantee safe operations within the quarrying working areas. This objective requires a reliable assessment of the rock mass natur

    May 1, 2009

  • DFI
    Problems Of Cast In Situ Driven Piles Added To Existing Piles And Built Near A Standing Structure

    By L. F. Albert

    The paper describes solutions given to foundation problems during the reconstruction of a power plant set on fire, located adjacent to several still Working Units. After a detailed site and laboratory

    Jan 1, 1989

  • CIM
    Some Insights into the Process Design of Ferronickel Smelters

    By S. Mostaghel, S. Nicol, M. Y. Solar

    Once upon a time, the process engineer developing the design criteria for a new saprolite ferronickel smelter had it easy: most ores were around 2.5% Ni, with a Fe/Ni ratio of 4 to 5 and a SiO2/MgO ra

    Jan 1, 2014

  • CIM
    Arsenic Management and Stabilization

    By K. Lundholm, A. E. Mäkinen

    "Ore grades are declining and getting more complex around the world which not only complicate the ore processing but also produce new type of requirements to manage the produce waste streams. One spec

    Jan 1, 2014