Search Documents

  • CIM
    Estimation Errors for Gold Inventory in Large Carbon-In-Leach Tanks

    By Jr. Blanchette, Claude Bazin, Paul Blatter

    "Reporting of the gold production during a month implies to estimate the mass of gold that is processed by a mill, recovered as dorés, lost to the tailings and the change of gold inventory within the

    Jan 1, 2011

  • CIM
    Information Strategy Planning on Nuclear Power Plant Project Management System

    By Son Hye Jin

    Abstract ? KHNP is participating in the construction of Nuclear Power Plant both in Korea and UAE. ? We want to improve our construction project management process. ? So we are now developing the

    Aug 1, 2013

  • CIM
    World’s First Power Demand Stabilization System for A 3-Electrode Electric Arc Furnace for Shielded Arc Nickel Smelting

    By B. Lueger, D. Shen, M. Sedighy, R. Rand, R. Saleh, J. Cheung, M. Rifai, I. Khan, W. Sauri, D. Setianto

    The world’s first active power demand stabilization system for a 3-electrode electric arc smelting furnace was commissioned at PT Vale Indonesia in December 2012 on Furnace No. 2 using an SPLC (Smart

    Jan 1, 2014

  • AUSIMM
    Human Resources Management at Grey River Gold Mining Limited

    Grey River Gold Mining Limited (GRGML) has constructed and largely completed the commissioning of an alluvial gold dredge designed to recover gold from a low grade gold deposit in the Grey River Valle

    Jan 1, 1989

  • NIOSH
    Three-dimensional time-lapse velocity tomography of an underground longwall panel

    By Kray Luxbacher, Mario Karfakis, Erik Westman, Peter Swanson

    Three-dimensional velocity tomograms were generated to image the stress redistribution around an underground coal longwall panel to produce a better understanding of the mechanisms that lead to ground

  • CIM
    Towards Sustainable Mining - Made-in-Canada solution to driving environmental and social performance in mining

    About MAC ? The national organization of the Canadian mining industry ? Mining, smelting and refining of base and precious metals ? Mining of iron ore, diamonds, uranium, oil sands, coal and

    Aug 1, 2013

  • CIM
    Integrated Experimental and Modelling Research on Copper-Making Slags

    By Sergei Decterov, Peter Hayes, Evgueni Jak, Taufiq Hidayat, Denis Shishin

    Copper smelter operations around the world are under sustained pressure to reduce costs and increase output. Through the provision of reliable data on fundamental properties of the chemical systems th

    Jan 1, 2014

  • CIM
    The identification of mineralized granitoid plutons from ore-element distribution patterns in regional lake sediment geochemical data

    By P. H. Davenport

    "The ore-element patterns in regional lake sediment geochemical survey data from four areas of Newfoundland containing granite-related mineralization reveal characteristics which can be used to identi

    Jan 1, 1982

  • CIM
    The Business Case for LHD Automation at Kidd Creek ? the World?s Deepest Base Metal Mine

    By Zachary Mayer

    Agenda ? Kidd Mine ? Background ? Problem & Opportunity ? Challenges associated to depth - Production Rates - Productive Work Time - Operational Delays - Transfer Levels - Mucking Time - Impa

    Aug 1, 2013

  • IOM3
    Geochemistry of the British Caledonides: the setting for metallogeny

    By D. M. A. Flight, P. M. Green, J. A. Plant, P. R. Simpson

    Paper presented at Mineralisation in the Caledonides, the Mike Gallagher memorial meeting held in Edinburgh, 27-28 June 1996. The British Geological Survey's regional geochemical database is used to i

    Jun 19, 1905

  • SME
    Observations on the Prospectors and Developers Association Conference

    By Bruce Geller

    The 2004 Prospectors and Developers Association of Canada (PDAC) conference contained an air of optimism and excitement that has not been seen since 1997. Many segments of the mining industry are ali

    Jan 1, 2004

  • CIM
    Pump and Cyclone Design/Optimization to Maximize Grinding Circuit Efficiency: A Systematic Method

    By Robert E. McIvor

    "The design/optimization of the pump and cyclones to maximize grinding circuit efficiency first requires a concise understanding of, and clearly defined specifications for, desired grinding circuit pe

    Jan 1, 2011

  • ISEE
    Blasting Results Compared Using Crusher Powder Consumption and Tonnage of Rock Produced

    By Ron Glowe

    This paper shows the potential of a new computer model, using the Glowe-Tech (GT) Tonnage Analyzer program to compare drilling and blasting results. This model uses the crushers and conveyors as measu

    Jan 1, 2005

  • DFI
    Resolution Of Prestressed Concrete Pile Splice Problems - Summary

    By David Siu

    Many problems were encountered with the mechanical wedge-type splices used for the 15-inch square precast prestressed concrete piles installed at an industrial plant site. Many of the wedges were brea

    Jan 1, 1991

  • CIM
    Port of Vancouver Expects a Huge Increase in Mineral Shipments

    By G. S. Crawford

    Forecasts prepared by the B.C. Research Council for the National Harbours Board suggest that mineral shipments through B.C. Lower Mainland port facilities will increase more than four-fold, from 6 to

    Jan 1, 1968

  • AIME
    Our Diversified Organization and Work

    By William H. Bassett

    RECENTLY it has become the custom of retiring presidents to talk of the relations of the Institute to its membership and its constituency- and it seems a good precedent to follow. Past-president Smith

    Jan 1, 1931

  • CIM
    Using 3D Computer Simulation to Improve Construction Project Planning

    By Patrick Cloutier

    Presentation objectives ? Introduce discrete-event 3D computer simulation as a tool to design, improve and optimize construction projects: ? Describe a real typical construction project planning i

    Aug 1, 2013

  • SME
    Long-Term Stability Of Overburden Above Room And Pillar Mines

    By Gennaro Gerald Marino

    Vast improvement in methods of design and analysis of the long- term stability of overburden above room and pillar mines is needed. Improved methods are vital for planning and land development and for

    Jan 1, 1986

  • SAIMM
    The State of Mine Closure in South Africa – What the Numbers Say

    By M. Olalde, I. Watson

    "The consequences of ineffective mine closure in South Africa are evident from the number of abandoned mines and operations on extended care-and-maintenance, the on-selling of mines to less well-resou

    Jul 1, 2019

  • CIM
    Beneficiation and Extraction of REE from Northern Minerals’ Browns Range Heavy Rare Earth Project

    By T. Hadley, E. Catovic

    "Northern Minerals Limited’s (ASX: NTU) flagship project is the Browns Range Rare Earth Project (the Project) located in Western Australia, consisting of a number of deposits with high value, heavy ra

    Jan 1, 2014