Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Mining Geotechnical BenchmarkingBy Vincent A. Scovazzo
Benchmarking is a business management process that seeks improvement through the study and reapplication of practices conducted by industry leaders. This discussion presents objectives and organizatio
Jan 1, 2000
-
Ground Condition Mapping: A Case StudyBy H. Lawson
The Mine Safety and Health Administration (MSHA) issued Program Information Bulletin P09-03in April of 2008, providing formal guidance on using programs that model the redistribution of stress during
Jan 1, 2012
-
Technical Note - Borealis Project: A Fast-Track Approach to Mine DevelopmentBy W. E. Coughlin, R. L. Faverty, F. H. Lightner
Introduction The intent of this paper is to present the general strategy and method of implementation to achieve a "fast-track" mine development. The major objectives of a "fast-track" or rapid devel
Jan 11, 1983
-
RD Pile Wall – A Water Tight Retaining Wall StructureBy Antti J. Perala, Teemu J. Yli-Kovero
"Efficient use of land is constantly requiring more underground construction. Minimized execution time and disturbance to surroundings and nearby structures are essential benefits for all construction
Jan 1, 2017
-
Mine Production Scheduling Optimization At Newmont?s Twin Creeks MineNewmont?s Twin Creeks Mine, located in northern Nevada, is producing gold ore from surface mining operations. The ore is currently processed at three different on site facilities depending on the ore
Feb 27, 2013
-
Teleoperated Cutting and Haulage For Thin Coal SeamsBy A. J. Kwitowski
Remote control is usually associated with deep mine, continuous mining machines. This is because thin-seam operation precludes an onboard operator's compartment or the mine has approval to conduc
Jan 1, 1992
-
Quantitative characterization of the REE minerals by QEMSCANTM from the Nechalacho Heavy Rare Earth Deposit, Thor Lake Project, NWT, CanadaBy Tassos Grammatikopoulos, Sarah Prout, William Mercer, C. Gunning
"The Nechalacho rare metal deposit is located in NWT, Canada. Avalon Rare Metals Inc. is now evaluating processing techniques for recovery of REE to be used in the industry. QEMSCANTM analysis coupled
Jan 1, 2011
-
Quality Assessment Procedure And Classifications Of Cast-In-Place Shaft Using Low Strain Dynamic TestBy Liqun Liang
Various nondestructive testing (NDT) inspection methods are available to evaluate the structural integrity of cast-in-place shafts. The widely used methods include Cross Hole Sonic Logging Testing and
Jan 1, 2011
-
RI 6005 Methods For Determining Microquantities Of Impurities In TungstenBy J. G. Haymes
This report by the Bureau of Mines is the first of two proposed papers on evaluation of spectrophotometric, spectrographic, polarographic, and other analytical methods for quantitatively determining i
Jan 1, 1962
-
Chuquicamata Sulphide Plant: Tailing DisposalBy R. M. Kuralt
CONCESSION from the Chilean government granting the company use of the Rio Salado water stipulates that a minimum of 35,000 metric tons of such salty water must be diverted from the Salado daily, and
Jan 1, 1952
-
Metallurgy of Copper - Insulation and Suspended Roofs for Reverberatories - An Arc Melting Furnace InstalledBy E. W. Rouse
THE year 1936 has seen rehabilitation of many plants which had been closed or severely curtailed. The Steptoe smelter of the Nevada Consolidated Copper Co. has been transformed by a rearrangement of t
Jan 1, 1937
-
Comparison of a and ß Methods with CPT and Pile Load Test Data: A Case Study with Attention on Soil Setup EffectsBy Mohammadreza Khanmohammadi, Kazem Fakharian
"AbstractIn driven piles, the gradual dissipation of excess pore water pressure and consequently the soil setup significantly contribute to increasing the pile capacity with time. The question is rise
Jan 1, 2014
-
Kell Hydrometallurgical Process For Extraction Of Platinum Group Metals And Base Metals From Flotation Concentrates ? SynopsisBy K. S. Liddell
The Kell Process has been developed for the extraction of platinum group metals (PGMs) and base metals from sulphide flotation concentrates. The process has been successfully tested on several differe
Jan 1, 2012
-
Managing SOE Construction Risk through Design-Build SystemsBy Rob Jameson
"The demand for commercial and residential construction has continued to evolve across the United States over the last decade. Our markets demand larger, deeper and inherently more complex structures,
Jan 1, 2017
-
Updating the Lucky Friday Mill – Experiences in Revamping a Historic Milling OperationBy Dale Dean, Bill Hancock, Raul Mondragon, Carlos Aguilar, Chris Martin
"In 1942, commercial mining operations began in what is now the Lucky Friday Ag/Pb/Zn mine in Idaho’s Silver Valley. Wholly owned since 1962 by Hecla Mining Company, the mine has produced more than 14
Jan 1, 2011
-
Risk-based approach to setting of flyrock danger zones for blast sitesBy P. A. Davies
Paper presented at the conference: Risk assessment in the extractive industries, held in Exeter, UK, 23-24 March 1994, and first published London: IMM, 1994, preprint volume, 11pp., 15 refs. Hazards s
Aug 1, 1995
-
Successful Treatment of Complex Feeds through the Isasmelt™ and Albion Process™By S. Nikolic, G. M. Stieper, D. P. Mallah, B. J. Hogg, P. B. Voigt
Copper feed materials processing is becoming more challenging, due to an incremental increase in the mineralogical and compositional complexity of these feeds. These complex and polymetallic feeds are
Jan 1, 2019
-
Water Treatment Upgrade at Sepon MineBy D McClelland, R Whittering
Minerals and Metals Group (MMG) subsidiary Lane Xang Minerals Ltd operates a single site copper and gold mine near Sepon in Lao PDR. Gold production commenced in 2002 and first cathode copper producti
Jan 1, 2009
-
Time-dependent behaviour of Tournemire argillites (France)By A. Rejeb
ABSTRACT: This paper contributes to the study of underground structures in argillaceous media, especially Tournemire argillites (Aveyron, France). The basic results obtained over six years in two expe
Jan 1, 2003
-
Large Scale Lateral Testing Of Pile Foundations (Young Professor Paper Competition 2010)By Anne Lemnitzer
Full-Scale cyclic field testing was performed on a 3x3 pile group consisting of nine cast-in-drilled-hole (CIDH) reinforced concrete shafts and a comparable single-shaft in order to investigate group
Jan 1, 2010