Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Wall control blasting – the influence of engineering geology on blast designBy T N. Little
This paper is concerned with the influence of engineering geology on design of Wall Control Blasts. In the Introduction, the Blast Management Framework and the Blast Design Requirements classification
Jun 22, 2022
-
How innovation trumps isolation, one mine at a timeBy J Pearce, R Ramanathan
hortly after the World Health Organization declared COVID-19 a pandemic, the words ‘social distancing’ entered the global lexicon. The effects on the public of social distancing, lockdowns and travel
Jun 22, 2022
-
Strategic short-term geotechnical designBy K T. Mandisodza, T J. Cartledge
The principal objective of Geotechnical Engineers supporting operating mines is to provide safe working conditions and ensure that pit designs are geotechnically optimised to site conditions and pre-d
Jun 22, 2022
-
Learning from and managing a significant saprolite instabilityBy M Bouare, C Holland, K N’Diaye
Two adjacent open pits in Mali hosted by deeply weathered saprolitic materials were mined consecutively over the course of approximately 12 months. During excavation, both pits experienced significant
Jun 22, 2022
-
Improvement of blast efficiency at Rio Tinto Borates and Lithium Mine in California, USABy J Furtney, W Fu, D Nutakor, A Brose
Rock blasting outcomes are often a shared responsibility of both the mine operations group and the mine geotechnical group. From an operational logistics and planning perspective, blasting concerns in
Jun 22, 2022
-
Quantifying iron ore ‘handleability’ to reduce processing plant delaysBy P Cherepanskiy, G Elphick, R Hus, C Perring
When an iron orebody nears its end of life, the extracted material can become increasingly problematic to handle. Higher moisture content occurs as larger portions of originally-below-water-table mate
Jun 22, 2022
-
Re-defining Compliance Planning through data integration and ultra-short-term schedulingBy C Fong
Compliance Planning is an active approach to ensure mining operations align more closely to their longer-term plans. Through Compliance Planning, operations can not only measure their performance on i
Jun 22, 2022
-
Applying control frameworks to enhance vehicle interaction technology outcomesBy P Standish
Qualitative risk assessment methods are not well suited to considering complex systems and potential interactions of new technology. As part of supporting tier one mining organisations and internation
Jun 22, 2022
-
Back analysis of pit slope performance in a saturated alluvial sedimentBy J Player, G Sweby
The material properties and hence performance of saturated alluvial sediments slope can be incorrectly forecast if the water content is not preserved, and materials properties not correctly determined
Jun 22, 2022
-
Mine to mill study – Bond Work index as factor for intrusive and non-intrusive rock typeBy W F. E Ouedraogo
This study data has been collected on a three-month period from November 2020 to January 2021 and based on three different pits: Vindaloo Main, Vindaloo Central and Bouere. Both pits having specific g
Jun 22, 2022
-
Scaled depth of burial application to increase blast efficiency in PT. Indo Muro KencanaBy A Suwandhi, H Utama
PT. Indo Muro Kencana (PT.IMK) is a gold mine that is located in Central Kalimantan, Indonesia. Drilling and blasting activity is applied in order to support mining production. Drilling and Blasting (
Jun 22, 2022
-
Blast design and execution drives mine site profitsBy J Loeb, J Dampney, P Cameron
Optimisation of Blast Design and Execution must be done right the first time. It is too late after the ore is broken. Consequences of poor design and execution negatively affect productivity from load
Jun 22, 2022
-
Mining method, and controls, to cut back a failed slope at KCGMs Fimiston Pit (KCGM Superpit)By C E. Woolley, H Jebaliya, J Foster
The East wall of the Kalgoorlie Consolidated Gold Mines Fimiston Open Pit (KCGM Superpit) has a history of wall instabilities impacting mining operations; the most significant of which occurred in May
Jun 22, 2022
-
The use of collaboration and management to turn-around the performance of a failing copper mineBy M Jacobs
This abstract discusses a heap leach copper mine that was failing to perform and as a result was not meeting targeted production. The mine had numerous technical challenges including: high water inflo
Jun 22, 2022
-
A tailored solution to determine plant capacity using strategic analysisBy J Nortier, J Dray
There is no single factor that determines the appropriate capacity for a mining project. It is driven by the size of the resource, the capacity of the market, the availability of capital, the availabi
Jun 22, 2022
-
The role of fleet management in reducing carbon emissions from haul trucksBy D Prior
The Australian mining industry is a significant contributor to the nation’s greenhouse gas (GHG) emissions, and like any industry, it must make efforts to reduce these. Medium- and long-term strategie
Jun 22, 2022
-
Transition from owner mining to contract mining – a structured tender process using a holistic approachBy Y G. Anoman
This paper discusses the operating model within Endeavour Mining Corporation regarding the options of owner mining against contract mining. It’s based on the concept of ‘are we carrying out the most e
Jun 22, 2022
-
The application of digital twin machine learning models for Mine to Mill and Pit to Plant optimisationBy X Hu, Z Pokrajcic, R Embry, P C. Stewart, J Carpenter, E Jones
Whilst the value of Pit to Plant and Mine to Mill optimisation has been proven since the 1990s, sustaining the productivity and efficiency gains typically requires ongoing test work, blast trials, pla
Jun 22, 2022
-
Managing uncertainty in large open pit geotechnical modellingBy R Hao
Uncertainties in large open pit geotechnical modelling has been a major concern for slope stability analysis. The level of confidence in the in-put assumptions, such as structural and rock mass model,
Jun 22, 2022
-
Managing remediation, and risk of failure, to complete extraction of a short life open pitBy C E. Woolley, A Hosseini, J Foster
Northern Star’s Thunderbox Open Pit C-Zone cutback was designed to maximise extraction in a short life excavation; In fresh rock on the western wall this included 20 m to 30 m bench heights with 6.5 m
Jun 22, 2022