  • SAIMM
    3-D Numerical Modelling Of Stresses Around A Longwall Panel With Top Coal Caving

    By N. E. Yasitli

    There is a considerable amount of lignite reserve in the form of thick seams in Turkey. It is rather complicated to predict the characteristics of strata response to mining operation in thick seams. H

    Jan 1, 2005

  • SME
    3-D Piping Design Speeds Impala Refinery Project

    By Ian Martin

    A precious metals refinery’s switch to personal computer-based, three-dimensional piping design saved many hours in the design of a South African precious metals refinery. Bateman Minerals and Ind

    Jan 1, 2000

  • TMS
    3-D Weld Pool Convection - A Dimensionless Presentation

    By Y. H. Wang, S. Kou

    "Three-dimensional weld pool convection was computer simulated using dimensionless variables. The electromagnetic force, the buoyancy force and the surface tension gradient on the pool surface were tr

    Jan 1, 1986

  • SME
    3-Dimensional Analysis of EPB TBM Operation in Close Proximity to Pile Foundations

    By Mahmoud Sepehrmanesh, Verya Nasri, Maziar Partovi

    "This paper presents an assessment of the impact of tunneling and its associated risks on pile foundations located in the influence zone of tunneling operation. Tunneling in proximity of pile foundati

    Jan 1, 2016

  • CIM
    3-Dimensional Numerical Modelling of Stope Sequencing for Mine Planning

    There are many inherent risks in creating a mine plan for a new ore zone in an underground mine; one of such risks is the redistribution of stresses that could be a cause of instability. Using numeric

    May 1, 2009

  • SME
    3. Capital Project Planning and Control ? Introduction

    By Gilmore R. Tostengard

    The advent of inexpensive computers has opened vast opportunities for improved planning and control of capital projects. The mining and mineral processing industries have welcomed the opportunity, and

    Jan 1, 1979

  • SME
    3. Materials Management ? Introduction

    By D. P. Plute

    The mechanization of the materials management function must contribute to the overall goal of optimization of profits. A computerized system contributes to the profitability of the company by saving m

    Jan 1, 1979

  • SME
    3. Models for Prospect Evaluation of Skarn Deposits

    By Victor F. Hollister

    Skam deposits considered as porphyry copper deposits have been classified into three basic prospecting models: (I) the skam deposit associated with a mineralized intrusive (Pima-Mission), (2) the depo

    Jan 1, 1991

  • SME
    3. Open-Pit Long-Range Mine Planning Using O.R.E. ? Introduction

    By David E. Sims

    Asarco has been using computer-aided open-pit mine design since 1966. The in-house developed program package includes drill-hole analysis programs, interpolation routines, and three-dimensional open-p

    Jan 1, 1979

  • SME
    3. Planning of Underground Materials-Handling Systems ? Introduction

    By L. H. E. Weyher

    A mine is essentially a vast materials-handling system. All other systems found in the mine exist to one degree or another to support the materials-handling functions, from the cutting at the face to

    Jan 1, 1979

  • SME
    3. Process Optimization

    By A. L. Mular

    Optimization has been defined as the procedure of locating the best of something or the best way of doing something (Mular, 1971). Several texts (Himmelblau, 1972; Ray and Szekeley, 1973; Box and Drap

    Jan 1, 1979

  • AIME
    3. The Benson Mines Iron Ore Deposit, Saint Lawrence County, New York

    By Edward L. Beutner, Robert M. Crump

    Benson Mines low-grade iron ore reserve is a replacement deposit within the Grenville gneisses of the Adirondacks. The average grade of the crude ore is about 23 per cent iron. The iron minerals are p

    Jan 1, 1968

  • SME
    3. Underground Coal Mine Production Reporting Developments at the Bethlehem Mines Corporation ? Introduction

    By L. H. E. Weyher

    The Bethlehem Mines Corp. is a captive mining subsidiary of Bethlehem Steel Corp. Its coal production is tied to the demands for and production of steel, a situation that has to balance between the fo

    Jan 1, 1979

  • AIME
    3.15 – Nonmetallics - Construction Minerals

    By Robert M. Dreyer

    AGGREGATE With an annual domestic production of over 1.6 billion tons at a value of over $2 billion (see Table 15.1.1), the production of aggregate (crushed rock, sand, and gravel) is a basic indus

    Jan 1, 1976

  • AIME
    3.15.4 - Other Nonmetallics - Abrasives

    By Robert M. Dreyer

    During the past two decades, synthetic abrasives have taken over successively greater percentages of the high-grade abrasive market, so that now, with the exception of natural diamonds (discussed in s

    Jan 1, 1976

  • SAIMM
    3.2 Lotz - Sampling For Cyanide In Metallurgical Processes

    By Peter W. Lotz

    Contents of: ?Sampling for Cyanide in Metallurgical Processes? ?Sampling at process level of operation ?Sampling at environmental level ?Sample stability and integrity issues ?each citing possi

    Jan 1, 2005

  • AUSIMM
    3.26 GA Black Smoker-Type Textures and Setting of VMS Mineralisation in the Pilbara Craton, Western Australia: Ancient Analogues of Modern Pacific-Rim Processes

    By R Kerrich

    Early-Archaean (3.26 Ga) volcanogenic massive sulphide (VMS) deposits located within the low strain and sub-prehnite-pumpellyite metamorphic-grade Strelley greenstone belt, East Pilbara, Western Austr

    Jan 1, 1995

  • SME
    3.3 Open-Pit Limits Analysis - 1. Technical Overview

    By Y. C. Kim

    One aspect of long-range mine planning in an open-pit mine is first to define the ultimate pit limit, i.e., the projected size and shape of the pit at the end of its life. This chapter is concerned wi

    Jan 1, 1979

  • SAIMM
    3.4 Biotrack - Environmental Assessment ,Monitoring And Interpretation

    By Mark Dangerfield

    [Power-Point Presentation]

    Jan 1, 2005

  • DFI
    30 Hudson Street Foundation Design and Construction in Variable Rock

    By Joel Moskowitz, George J. Tamaro

    "A new office complex is being constructed within 25m of the Hudson River in New Jersey. The project, about 140m by 100m, will include 4 basements under the entire footprint. The perimeter was to be s

    Jan 1, 2004