Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
3-D Numerical Modelling Of Stresses Around A Longwall Panel With Top Coal Caving
By N. E. Yasitli
There is a considerable amount of lignite reserve in the form of thick seams in Turkey. It is rather complicated to predict the characteristics of strata response to mining operation in thick seams. H
Jan 1, 2005
-
3-D Piping Design Speeds Impala Refinery Project
By Ian Martin
A precious metals refinery’s switch to personal computer-based, three-dimensional piping design saved many hours in the design of a South African precious metals refinery. Bateman Minerals and Ind
Jan 1, 2000
-
3-D Weld Pool Convection - A Dimensionless Presentation
By Y. H. Wang, S. Kou
"Three-dimensional weld pool convection was computer simulated using dimensionless variables. The electromagnetic force, the buoyancy force and the surface tension gradient on the pool surface were tr
Jan 1, 1986
-
3-Dimensional Analysis of EPB TBM Operation in Close Proximity to Pile Foundations
By Mahmoud Sepehrmanesh, Verya Nasri, Maziar Partovi
"This paper presents an assessment of the impact of tunneling and its associated risks on pile foundations located in the influence zone of tunneling operation. Tunneling in proximity of pile foundati
Jan 1, 2016
-
3-Dimensional Numerical Modelling of Stope Sequencing for Mine Planning
There are many inherent risks in creating a mine plan for a new ore zone in an underground mine; one of such risks is the redistribution of stresses that could be a cause of instability. Using numeric
May 1, 2009
-
3. Capital Project Planning and Control ? Introduction
By Gilmore R. Tostengard
The advent of inexpensive computers has opened vast opportunities for improved planning and control of capital projects. The mining and mineral processing industries have welcomed the opportunity, and
Jan 1, 1979
-
3. Materials Management ? Introduction
By D. P. Plute
The mechanization of the materials management function must contribute to the overall goal of optimization of profits. A computerized system contributes to the profitability of the company by saving m
Jan 1, 1979
-
3. Models for Prospect Evaluation of Skarn Deposits
By Victor F. Hollister
Skam deposits considered as porphyry copper deposits have been classified into three basic prospecting models: (I) the skam deposit associated with a mineralized intrusive (Pima-Mission), (2) the depo
Jan 1, 1991
-
3. Open-Pit Long-Range Mine Planning Using O.R.E. ? Introduction
By David E. Sims
Asarco has been using computer-aided open-pit mine design since 1966. The in-house developed program package includes drill-hole analysis programs, interpolation routines, and three-dimensional open-p
Jan 1, 1979
-
3. Planning of Underground Materials-Handling Systems ? Introduction
By L. H. E. Weyher
A mine is essentially a vast materials-handling system. All other systems found in the mine exist to one degree or another to support the materials-handling functions, from the cutting at the face to
Jan 1, 1979
-
3. Process Optimization
By A. L. Mular
Optimization has been defined as the procedure of locating the best of something or the best way of doing something (Mular, 1971). Several texts (Himmelblau, 1972; Ray and Szekeley, 1973; Box and Drap
Jan 1, 1979
-
3. The Benson Mines Iron Ore Deposit, Saint Lawrence County, New York
By Edward L. Beutner, Robert M. Crump
Benson Mines low-grade iron ore reserve is a replacement deposit within the Grenville gneisses of the Adirondacks. The average grade of the crude ore is about 23 per cent iron. The iron minerals are p
Jan 1, 1968
-
3. Underground Coal Mine Production Reporting Developments at the Bethlehem Mines Corporation ? Introduction
By L. H. E. Weyher
The Bethlehem Mines Corp. is a captive mining subsidiary of Bethlehem Steel Corp. Its coal production is tied to the demands for and production of steel, a situation that has to balance between the fo
Jan 1, 1979
-
3.15 – Nonmetallics - Construction Minerals
By Robert M. Dreyer
AGGREGATE With an annual domestic production of over 1.6 billion tons at a value of over $2 billion (see Table 15.1.1), the production of aggregate (crushed rock, sand, and gravel) is a basic indus
Jan 1, 1976
-
3.15.4 - Other Nonmetallics - Abrasives
By Robert M. Dreyer
During the past two decades, synthetic abrasives have taken over successively greater percentages of the high-grade abrasive market, so that now, with the exception of natural diamonds (discussed in s
Jan 1, 1976
-
3.2 Lotz - Sampling For Cyanide In Metallurgical Processes
By Peter W. Lotz
Contents of: ?Sampling for Cyanide in Metallurgical Processes? ?Sampling at process level of operation ?Sampling at environmental level ?Sample stability and integrity issues ?each citing possi
Jan 1, 2005
-
3.26 GA Black Smoker-Type Textures and Setting of VMS Mineralisation in the Pilbara Craton, Western Australia: Ancient Analogues of Modern Pacific-Rim Processes
By R Kerrich
Early-Archaean (3.26 Ga) volcanogenic massive sulphide (VMS) deposits located within the low strain and sub-prehnite-pumpellyite metamorphic-grade Strelley greenstone belt, East Pilbara, Western Austr
Jan 1, 1995
-
3.3 Open-Pit Limits Analysis - 1. Technical Overview
By Y. C. Kim
One aspect of long-range mine planning in an open-pit mine is first to define the ultimate pit limit, i.e., the projected size and shape of the pit at the end of its life. This chapter is concerned wi
Jan 1, 1979
-
3.4 Biotrack - Environmental Assessment ,Monitoring And Interpretation
By Mark Dangerfield
[Power-Point Presentation]
Jan 1, 2005
-
30 Hudson Street Foundation Design and Construction in Variable Rock
By Joel Moskowitz, George J. Tamaro
"A new office complex is being constructed within 25m of the Hudson River in New Jersey. The project, about 140m by 100m, will include 4 basements under the entire footprint. The perimeter was to be s
Jan 1, 2004