Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Prediction And Design Control Of Surface Subsidence By Global Simulation Of Mine Behavior Using Finite Element Mode

    By Shosei Ph. D Serata

    The Stress Control Method of mine design provides enhanced engineering control over the behavior of underground structures in comparison to conventional mine design methods. The same Method can be app

    Jan 1, 1986

  • SME
    Open Pit TBM Driven Drainage Tunnel?Ok Tedi Mine

    By Tony Peach

    Project Description The Ok Tedi Mine is located approximately 18 km east of the Papua and New Guinea-Indonesia border, on the southernmost extremity of the Star Mountains Range, it is situated almost

  • SME
    Exploratory Shafts For The Nuclear Waste Repository In Basalt

    By Birger Schmidt

    INTRODUCTION Conceptual design of the first Exploratory Shaft (ES-I) for the Nuclear Waste Repository in Basalt (NWRB) began in July 1981; detailed design began in February 1982, and was largely co

    Jan 1, 1987

  • SME
    Evaluation Of The NEPA Process For Estimating Water Quality Impacts At Hardrock Mine Sites

    By Kimberley MacHardy, Ann Maest, Greg Lawson, James Kuipers

    Although water quality predictions are often made in Environmental Impact Statements (EIS's) as part of the National Environmental Policy Act (NEPA), comparisons between predicted and actual wate

    Jan 1, 2005

  • SME
    Rare Earth Elements and selected major elements distribution in the siliceous-clayey silts from the NE Pacific abyssal Basin (Clarion-Clipperton Fracture Zone)

    By Lukasz Maciag, Ryszard Andrzej Kotlinski, Ryszard Krzysztof Borówka, Dominik Zawadzki

    Concentration and composition of rare earth elements (REE) and major elements in the sediment samples from the IOM H11 Fe-Mn nodule deposit, eastern part of the Clarion-Clipperton nodule field (locate

    Sep 1, 2014

  • SME
    Geology Of The Biwabik Iron Formation And Duluth Complex

    By Mark A. Jirsa

    The Biwabik Iron Formation is a ~1.9 billion year-old sequence of iron-rich sedimentary rocks that was metamorphosed at its eastern- most extent by ~1.1 billion year-old intrusions of the Duluth Comp

    Jan 1, 2007

  • SME
    Benefits Analysis Of Expert Control Systems

    By A. Broussaud, J. D. McKay

    Benefits analysis of adaptive Expert control systems operating at plants in Africa and the United States are presented. Proper statistical tools and techniques are discussed. Technical and practical

    Jan 1, 2001

  • SME
    Validation of the Predicted Heat Strain Model in Hot Underground Mines Mining, Metallurgy and Exploration

    By Paloma Lazaro, Moe Momayez

    Heat-related illnesses (HRI) are relatively common in both hot surface and underground mining operations. When workers are exposed to extreme heat or strenuous work in a hot environment, they become p

  • SME
    Validation of the Predicted Heat Strain Model in Hot Underground Mines Mining, Metallurgy and Exploration (b1204250-b5e6-44a6-902f-6383dbcaf5a3)

    By Paloma Lazaro, Moe Momayez

    Heat-related illnesses (HRI) are relatively common in both hot surface and underground mining operations. When workers are exposed to extreme heat or strenuous work in a hot environment, they become p

  • SME
    Cross-Border Mineral Investment Activity In The Pacific Rim

    By C. R. Tinsley

    Investment activity in the Pacific Rim of Fire has seen a phenomenal surge from epithermal gold exploration. Individual countries are attractive because of lower up-front minerals lease costs (US, Can

    Jan 1, 1990

  • SME
    Demonstration Of The Advanced Radio Imaging Method (Rim): Ground Truth Results For Three-Dimensional Imaging Of Coal Seams

    By L. G. Stolarczyk, Y. Luo, S. S. Peng

    Detection and assessment of severe geological anomalies ahead of a longwall face greatly benefits the mining operation. Electromagnetic-based Radio Imaging Method (RIM) is one of the most promising ge

    Jan 1, 2004

  • SME
    Managing Geologic Uncertainty in Pit Shell Optimization Using a Heuristic Algorithm and Stochastic Dominance Mining, Metallurgy and Exploration (444ce330-9c49-45a1-9758-2c54438ceb81)

    By · J. B. Boisvert, O. Leuangthong, T. Acorn

    Optimizing final pit limits for stochastic models provides access to geologic and economic uncertainty in the pit optimization stages of a mining project. This paper presents an approach for optimizin

  • SME
    Managing Geologic Uncertainty in Pit Shell Optimization Using a Heuristic Algorithm and Stochastic Dominance Mining, Metallurgy and Exploration

    By · J. B. Boisvert, O. Leuangthong, T. Acorn

    Optimizing final pit limits for stochastic models provides access to geologic and economic uncertainty in the pit optimization stages of a mining project. This paper presents an approach for optimizin

  • SME
    Planning And Teamwork Lead To Successful Start-Up At Batu Hijau

    By P. Hickey, J. Spenceley, T. J. DeMull

    Development of the Batu Hijau Project was successfully completed in the fourth quarter of 1999 with the final handover and start-up of ore processing facilities. The development project had started m

    Jan 1, 2001

  • SME
    The application of an improved multi-scale computational modelling techniques to predict fugitive dust dispersion and deposition within and from surface mining operations

    The extraction and processing of minerals from surface mines and quarries can produce significant fugitive emissions as a result of site activities such as blasting, unpaved road haulage, loading, pri

    Jan 1, 2009

  • SME
    The Illinois Mine Subsidence Research Program: An Update

    By Robert A. Bauer, Paul B. DuMontelle

    In 1985, participants of the multi-year Illinois Mine Subsidence Research Program conducted surveys of subsidence effects on crop production from current high-extraction mining methods, selected a sit

    Jan 1, 1986

  • SME
    Weinbach Soft Ground Tunnel: Lessons Learned

    By Raymond W. Henn, Kent A. Pease, Glen J. Rorison

    The paper focuses on construction of a 2.55-km (8,365-ft) long, 2.4-m (8-ft)diameter storm drain tunnel in Evansville, Indiana. The tunnel was driven through saturated soft ground varying from clay to

    Jan 1, 2001

  • SME
    Energy Dissipation and Fragmentation of Granite Core During High Velocity Impact Mining, Metallurgy and Exploration

    By Ying Lu, Jeffrey C. Johnson, Chen-Luh Lin, Jan D. Miller, Sindhoora Puvvada

    Energy dissipation and fragmentation of rock is of interest for mine-to-mill operations in order to understand breakage and to minimize energy consumption during blasting at the mine site, and comminu

  • SME
    Energy Dissipation and Fragmentation of Granite Core During High Velocity Impact Mining, Metallurgy and Exploration (1de527b1-559a-4ec3-825e-46bd7ac58c2b)

    By Ying Lu, Jeffrey C. Johnson, Chen-Luh Lin, Jan D. Miller, Sindhoora Puvvada

    Energy dissipation and fragmentation of rock is of interest for mine-to-mill operations in order to understand breakage and to minimize energy consumption during blasting at the mine site, and comminu

  • SME
    Development Of High-Efficiency Hydraulic Separators

    By Karen Mikkola, Gerald Luttrell, Jaisen Kohmuench, Glen Oswald, Michael Mankosa, Tracy Westerfield

    Hydraulic separators are commonly used for particle size classification and gravity concentration of minerals and coal. Unfortunately, the efficiency of these processes can be quite low due to poor eq

    Jan 1, 2005