Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Remediation Of Historical Smelter Contamination Midvale Slag Superfund Site - Operable Unit One Midvale, Ut - Introduction - Preprint 09-012

    The Midvale Slag Site covers 300 acres in Midvale, Salt Lake County, Utah. Midvale (population 10,000) is part of the Salt Lake City metropolitan area (population 936,000). Between 1902 and 1971, Un

    Jan 1, 2009

  • SME
    Boggo Road Busway Project, Brisbane, Australia

    By Ted Nye

    This paper describes a number of aspects of the design and construction of a driven tunnel which forms part of the Boggo Road Busway project. The driven tunnel is 430m long with an excavated width of

  • SME
    Monitoring Reclaimed Mine Land For Stray CO2 Hazards

    By M. Moagabo

    CO2 emissions from carbonate laden reclaimed mine spoil has been shown to pose a hazard to residents in homes built on or adjacent to such land. The objective of this project was to develop a soil CO2

    Jan 1, 2012

  • SME
    How To Increase Plant Performance With Artificial Intelligence And Expert Systems - Preprint 09-074

    By L. B. Hales

    Expert control of grinding and flotation plants has been successfully used in the minerals industry since the 1970?s. The earliest of these systems were written in a hard-coded fashion in FORTRAN, BAS

    Jan 1, 2009

  • SME
    Effective Planning Of Underground Space?Planning And Implementation Of The First Underground Water Reservoirs In Hong Kong

    By T. H. Chan

    As the University of Hong Kong and their advisors planned their new Centennial Campus it became clear that they would have to re-provide existing water reservoirs on an adjacent site with new salt wat

  • SME
    Using GIS To Identify High Value Areas In Large Coal Resources

    By J. Kern, T. F. Torries

    Identifying high value areas of unmined coal when large quantities of coal are available relative to annual markets is difficult because of the uncertainty of when the coal is to be mined. A GIS based

    Jan 1, 1999

  • SME
    The Rib-In-Roc Pre-Reinforcement System For Large Underground Openings

    By Bengt L. Stillborg

    INTRODUCTION This paper summarizes the result of a two and a half year research program. The objective of the research was to develop a fundamental understanding of the Rib-in-Roc method. Through t

    Jan 1, 1979

  • SME
    Rare elements in seafloor massive sulfides of the Semyenov hydrothermal cluster, Mid-Atlantic Ridge

    By Georgy Cherkashov, Svetlana Babaeva, Tamara Stepanova, Firstova. Anna

    Seafloor massive sulfides (SMS) study in the Russian Exploration Area at the northern equatorial Mid Atlantic Ridge began after signing the contract with International Seabed Authority in 2012. In ord

    Sep 1, 2014

  • SME
    Significant Developments In Dry Rare-Earth Magnetic Separation - Preprint 09-004

    By M. Dobbins

    The advent of the more efficient and effective rare-earth roll (RER) separator in the early 1980?s began a new era of dry magnetic separation. The RER units quickly became the separator of choice with

    Jan 1, 2009

  • SME
    AUV and ROV magnetometer surveys, compensation

    By Peter Kowalczyk

    Magnetic surveying and map production is well established in land based mineral exploration. Magnetic data are routinely used to map geology in covered terrains, to estimate the depth to basement in o

    Sep 1, 2014

  • SME
    Reclamation And Remediation Of The Abandoned Belle Eldridge Mine Near Deadwood, South Dakota

    By A. D. Davis, C. J. Webb, C. S. Johnson, J. L. Porter

    The abandoned Belle Eldridge Mine near Deadwood, South Dakota, is on land controlled by the U.S. Bureau of Land Management (BLM) property. The mine produced primarily lead and zinc during the first h

    Jan 1, 2002

  • SME
    Synthetic aperture sonar as a tool for rapid high resolution deposit estimation

    By Rolf Birger Pedersen, Alden Ross Denny

    "Synthetic Aperature Sonar (SAS) is a powerful tool for ultra-high resolution marine survey. The Kongsberg HiSAS system deployed on the HUGIN AUV has a rangeindependent resolution of 3x3 cm for sonar

    Sep 1, 2014

  • SME
    Our Government's Stifling Excesses

    By R. E. Murray

    "It is a gloomy moment in the history of our country. Not in the lifetime of most men has there been so much grave and deep apprehension; never has the future seemed so incalculable as at this time. T

    Jan 1, 1980

  • SME
    Evaluation Of Blast Fragmentation In Quarries Nearby Istanbul ? Introduction

    By T. Hudaverdi

    Control of the particle size distribution of a muckpile after blasting is always an important subject for mining industry. Blasting has a significant impact on downstream processes such as loading, cr

    Jan 1, 2012

  • SME
    Arizona?s Mining History Featured At Precious Metals Symposium

    All aspects of precious metals processing were featured at a symposium held Oct. 3-6, 2007, at Loews Ventana Canyon Resort in Tucson, AZ. Although billed as "Precious Metals Processing: Advances in

    Jan 1, 2008

  • SME
    Engineered Pumpable pHoam?: A New Innovative Method For Mitigating Ard

    If one can embrace the medical analogue, much of the mining industry currently suffers from a massive bacterial infection. When pyrite-bearing or sulfide-bearing rock formations, tailings, or mine was

    Jan 1, 2012

  • SME
    AUV- and ROV-based exploration of active and inactive seafloor massive sulfide deposits at the Semyenov and Irinovskoe sites on the Mid-Atlantic Ridge

    By J. W. Jamieson, J. Escartin, A. Steinführer

    Evidence of hydrothermal activity on two Mid-Atlantic Ridge oceanic core complexes (OCCs), at 13º30’N (the Semyenov 1 through 5 fields) and 13º20’N (the Irinovskoe field) (Fig. 1) were studied using C

    Sep 1, 2014

  • SME
    Optimization of Surface Mining Dig Limits with a Practical Heuristic Algorithm Mining, Metallurgy and Exploration (e8f12701-6e05-4369-9a27-d2734d7cf05f)

    By Y. V. Vasylchuk

    This paper presents an algorithm for optimizing the classification of surface mine material subject to excavating constraints. High-resolution expected profit models are input and optimized to classif

  • SME
    Optimization of Surface Mining Dig Limits with a Practical Heuristic Algorithm Mining, Metallurgy and Exploration

    By Y. V. Vasylchuk

    This paper presents an algorithm for optimizing the classification of surface mine material subject to excavating constraints. High-resolution expected profit models are input and optimized to classif

  • SME
    Design/Build Agreement For The Niagara Tunnel Project

    By Russel Delmar, Rick Everdell, Harry Charalambu, John Tait

    Award of the Design/Build Agreement for construction of Ontario Power Generation’s (OPG’s) Niagara Tunnel Project was made after an intensive 8-month international procurement process. The 14.4-m diam

    Jan 1, 2007