Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Violence Factor – The New Tool for Blast Performance Analysis
By Dr. Calvin J. Konya, Anthony Konya
Blast violence has always been a criteria that has been analyzed without a quantitative approach relying on opinions of those viewing the blast and oftentimes does not transfer between open-pit mines,
-
More than Scratching the Surface – Capturing Blast hole Features to Improve QA/QC and Compliance to Design
By Paul Klaric, Nicholas Bodley
Every blasting engineer or professional can attest to the age-old conundrum of obtaining accurate hole information on a large scale prior to loading explosive charges in a blast hole. Even though the
Feb 6, 2023
-
Ring Blasting Design Modeling and Optimization
By María Rocha, Benjamín Cebrián, Roberto Laredo
"Ring blasting designs have to achieve different goals in order to become efficient whether is done in up hole or downhole fashion. Ore recovery/dilution control, fragmentation and drift integrity all
Jan 1, 2017
-
Journal: 20th Annual Photo and Art Contest - Best of Show, "Pinkerton Tunnel Open Cut"
By Michael Weaver, Dale Ramsey
Description of Project: The National Gateway Clearance Initiative is an improvement program to achieve a minimum of 21 feet of vertical clearance along CSX Transportation Inc’s (CSX) rail corridor so
Jan 1, 2014
-
Journal: You Be the Judge - A Study on Ethics
The following situation was submitted as an ethics case study for inclusion in the Journal. To the best of our knowledge, they are based on actual circumstances encountered in the field. Blowing the W
Jan 1, 2007
-
Vibration Effects on Underground Concrete Structures
By Frederick Kuhnow
In open pit blasting, energy is released and transmitted through the geology. Negative effects can impact operations and can affect mine production. This paper presents recommendations for blast desig
Jan 1, 2014
-
Blast Modeling for Underground Mining
By Gordon K. Jorgeonson
Much of the modelling of blasting operations has been devoted to simulating blasts in open pit mines and quarries . This has been the most obvious application and has been reported in many papers and
Jan 1, 1990
-
Examination of Timing Requirements for Optimization of Fragmentation Using Small Scale Grout Samples
By O Omidi
Selection of delay times to optimize fragmentation has been a controversial topic among researchers and blasting practitioners. This paper reviews previous experimental information and presents the re
Jan 1, 2014
-
Electronic Detonator Timing Approaches for Surface Quarries and Metals Mines
By Tristan Worsey, Nathan Rouse, Evan Thibaud
Electronic detonators allow for variability and accuracy with blast delay selection and timing sequence. However, a single published guideline for selection of electronic timing delays is not availabl
Jan 21, 2025
-
A Review of Contemporary Blast Design Data and Rules of Thumb
By David La Rosa, Matthew Craft, Lee Julian
Rules of thumb are ubiquitous in blasting. Typically presented as ratios, they assist with the initial assumptions of blast design and provide guidance for best practice. Examples include the blast ho
Feb 6, 2023
-
Journal: A Public Relations Plan Based on Structure Generated Sounds and Public Input
By Ken Eltschlager, J Silva Castro, J. M. Hoffman, Braden Lusk
This case study focuses on analysis of sounds inside a house induced by blasts as result of surface mining coal in West Virginia and how to better communicate technical information to the public. The
Jan 1, 2012
-
Journal: Safety Talk, The Blaster’s Duty of Care
By William Reisz
In our line of work,like many other professions, there may be times when circumstances or a series of events may arise, contributing toward unacceptable risk. When multiple parties are involved, there
Jan 1, 2014
-
Full-Scale Testing of Delay Timing Effects on Rock Fragmentation in the Shock Collision Regions
By M R. Hettigner, J Nawrocki, C E. Johnson, P G. Cahill
This study evaluates the effects of both short inter-hole and intra-hole delay times on rock fragmentation and throw. Full-scale test blasts were analyzed at a granite quarry in Talbotton, GA. This an
Jan 1, 2017
-
Electronic Accuracy Achieved with Non-Electric Initiation (7a8110cb-addf-409b-b1cc-4a8ccdd15ad7)
By Sandy Tavelli, Thomas L. Barkley
This discussion will present a case study in developing solutions to a metropolitan quarry’s public relations, legal, environmental, and productivity problems. It details an extensive and detailed pro
Jan 1, 2004
-
A Lightning Safety Primer for the Explosives Industry
By Chris Vagasky
On July 10, 1926, lightning struck at Picatinny Arsenal, New Jersey, and caused the explosion of at least 600,000 pounds (272,000 kilograms) of ammunition, resulting in more than $600 million (2015 do
Jan 1, 2017
-
Safety in Blasting Has No Limits
By W C. Brukle
Our title for this presentation could be taken in many ways. One course would be terrifying and that would be to cite incredibly bad practices. All of our votes/efforts should be for the reverse direc
Jan 1, 1983
-
Using Explosives to Clear Manhattan's East River of Navigational Hazards -- The Great Hell Gate Poject of the 1870's
By Robert B. Hopler
Reefs, exposed rocks, and fast currents made the Hell Gate section of New York's East River a treacherous passage ever since man attempted to sail through the area. As the harbor's importance grew, at
Jan 1, 1981
-
Recent Projects - Emergency Bridge Blasting
By Brent Blanchard
As most veterans of our industry are aware, explosive demolition by its very nature is often a challenging proposition. Even under the best of circumstances, proper planning and care must be taken dur
Jan 1, 2003
-
Blast Optimization and Vibration Control at a Multi-Seam Coal Mine, Brazil
By Enrique Munaretti, Vitor Rosenhaim, Jair Carlos Koppe, Joao Francisco Feijo
The B3 mine is a multiple coal seam strip mining in operation in Rio Grande do Sul, the southernmost state in Brazil. A traditional truck & excavator operation is used to remove the overburden and sel
Jan 1, 2012
-
Damage to Rock: Near Field Seismic Models Revisited
By Santiago Gómez, Pablo Segarra, José A. Sanchidrián
In this paper, differences between the industry-standard Holmberg-Persson (H-P) approach and a semi-analytical vibration prediction model called full-field solution (FFS) are analized. The analysis is
Feb 1, 2020