  • DFI
    Collaborative Data Sharing During Seepage Barrier Wall Construction at Bolivar Dam – Perspectives from Owner, Contractor and Sub-Contractor

    By Robert Bachus, Jamey Rosen, Fabio Santillan, Georgette Hlepas

    "A seepage barrier of length 4,800 feet and maximum depth 144 feet is being installed at Bolivar Dam in Ohio. This project is owned by the United States Army Corps of Engineers and contracted to Trevi

    Jan 1, 2017

  • DFI
    TTMJ – The New System for Slurry (Diaphragm) Wall Joints

    By Maurizio Siepi, Paul van Horn, John Coupland, Julian Crawley

    "TTMJ is the acronym for the Slurry (Diaphragm) Wall Tension Track Milled Joint currently in development as part of the European Union's innovative and far-reaching Horizon 2020 initiative (FTI Pilot-

    Jan 1, 2017

  • DFI
    Recent Developments in Wind Turbine Foundation Design: Post Tensioned Single Pier

    By Mohsen Elsayed, Amr Sallam, Ahmad Mohamed, Xuebing Zheng, Mohamed Alrowaimi

    The foundation is an essential component of the wind turbine that ensures continued operation under stable and safe conditions. Both shallow and deep foundations are utilized to support wind turbines

    Jan 1, 2019

  • DFI
    Selection And Design Of Continuous Flight Auger And Drilled Displacement Piles

    By Dan Brown

    This paper provides an overview of the advantages and limitations of continuous flight auger (CFA) and drilled displacement (DD) systems compared to other deep foundation systems, along with a summary

    Jan 1, 2005

  • DFI
    The Underwater Cut-Off At The Walter F. George Dam

    By Gianfranco Di Cicco

    Seepage problems were recorded for more then 40 years at the Walter F. George lock and dam. In 2001 the Mobile district of The U.S. Army Corps of Engineers turned to the installation of a 200 feet dee

    Jan 1, 2013

  • DFI
    Installation of 10 Feet Diameter CIDHs in Soft Clay Using Rotator/Oscillator on Trestle

    By Babak Mamaqani, Pirooz Barar

    The Moanalua trestle spanned over Moanalua Stream, Honolulu, HI and was designed to accommodate construction of five 10 feet diameter cast in drilled hole (CIDH) piers as a part of Honolulu Authority

    Jan 1, 2019

  • DFI
    Load and Resistance Factor Design – Past, Present and Future

    By Silas C. Nichols, Jennifer E. Nicks

    "Limit states design (LSD), or load and resistance factor design (LRFD), is a method to account for the uncertainty in loads and resistance through a reliability calibration that requires all applicab

    Jan 1, 2015

  • DFI
    Quality Control and Testing of Jet Grouting and its Interpretation in Relation to the Christchurch Town Hall Restoration Project.

    By David Chadwick, Paul Marsden, Chris Hughes, Mathias Delapille

    "Following damage caused by the 2011 Christchurch earthquakes, the NZ$127.5million Christchurch Town Hall Restoration project is due for completion in 2018. The building is undergoing extensive repair

    Jan 1, 1900

  • DFI
    Design And Construction Constraints Imposed By Unique Geologic Conditions In New York City - Synopsis

    By George J. Tamaro

    The design and construction of foundations in the New York City area are usually dictated by the widely varying geologic conditions encountered in the five boroughs, particularly along the spine of Ma

    Jan 1, 2000

  • DFI
    Washington Avenue Tunnel Project: Fortifying Aging Underground Infrastructure

    By Andrew R. Klaetsch, Peter W. Deming

    "The Washington Avenue tunnel in Kingston, NY was completed in 1912 to convey combined storm water and sanitary sewage. Over a mile in length, the tunnel was driven almost entirely in bedrock, with th

    Jan 1, 2016

  • DFI
    Diaphragm Wall Technique Used In A Different Way Cutting Trenches Up To 823 Ft. (251 M) For An Exploration And Bulk Sampling Program

    By Stefan Schwank, Alexander Blatt, Franz-Werner Gerressen

    Diaphragm wall technique is usually used to install diaphragm walls, which are known as underground structural elements commonly used for retention systems and permanent foundation elements as well as

  • DFI
    University Of Minnesota Football Stadium Down Hole Pile: Innovative Solution For Difficult Conditions

    By Eric J. Pederson

    The down hole hammer is widely used in specialty geotechnical construction. The common uses include tie-back anchor installation, micropile installation, and general soil/bedrock drilling operations.

    Jan 1, 2008

  • DFI
    Pile Installation Recorder Tests For ACIP/CFA Piles - Introduction

    By Garland Likins

    The Texas Department of Transportation, now considering using Augered Cast-In-Place (ACIP) Piles (also known as Continuous-Flight-Auger or CFA Piles) in their foundations, awarded a research project t

    Jan 1, 1998

  • DFI
    Design And Performance Of Helical Screw Piles In Collapsible And Expansive Soils In Arid Regions Of The United States

    By David R. Black

    Foundation problems due to collapsible and expansive soils are well known throughout the arid western United States. Millions of dollars are spent annually to counteract the effects of such soils for

    Jan 1, 2002

  • DFI
    Case Study on the Frederick Douglass Memorial Bridge and the use of Large Diameter Open End Steel Pipe Piles, Washington, DC

    By Karl A. Higgins, Michael D. Venezia

    The South Capitol Street Corridor Project is one of the District Department of Transportation’s (DDOT) largest projects, and is currently under construction. This case study will focus on the design o

    Jan 1, 2019

  • DFI
    Innovative Driven Pile Solution for the Rhode Island Route 6/10 Interchange Project

    By Seth H. Hamblin, Leo J. Hart, John E. Regan

    The Route 6 /10 10 Interchange Design/Build project, located in Providence, Rhode Island, involves the design and construction of five (5) new elevated bridge structures to replace and reconfigure the

    Jan 1, 2019

  • DFI
    Capitol Complex Phase 1 Expansion

    By Eric S. Lindquist, Charles A. Luxford

    The State of Texas recently adopted a master plan to expand the existing Capitol Complex in Austin. Phase 1 of this expansion will add two new State office buildings and five levels of underground par

  • DFI
    Cement Deep Soil Mixed Walls/Grout Plug for Groundwater Cut Off and Excavation Support at the Bart Warm Springs Extension

    By Harry Schnabel, Mitchell L. Fong, Douglas R. Jenevein, Thomas S. Lee

    "The Warm Springs Extension (WSX) is one of a series of projects that will eventually extend the Bay Area Rapid Transit System (BART) from Fremont to San Jose, California. A cut and cover tunnel was u

    Jan 1, 2015

  • DFI
    Innovative Micropile Retrofit Of Two Existing Structures

    By Terence P. Holman

    Micropiles are employed to retrofit existing foundations, including underpinning prior to future construction operations and resupport of existing structures that have experienced distortion and settl

    Jan 1, 2007

  • DFI
    Estimation Of Compressibility And Consolidation Characteristics Of Lightly Overconsolidated Soils From In-Situ Time Settlement Plots

    By Lenin T., Madhav M. R., Padmavathi V.

    Use of PVDs and preloading on the ground can significantly reduce the time taken for ground to consolidate. Many soils in situ are lightly overconsolidated, with overconsolidation ratios (OCR) ranging

    Sep 1, 2022