    Injecting Sustainability into Deep Soil Mixing Projects

    By Paul R. Lear

    Sustainability continues to be an important aspect of remediation and infrastructure projects. Deep soil mixing (DSM), a common construction and remedial technology, can easily incorporate the followi

    Sep 8, 2021

  • DFI
    Load Testing Methods

    This Section describes four alternative methods for load testing of drilled shafts: high strain dynamic test (HSDT), rapid load test, static load test, and bottom load test. Until recently, static loa

    Jan 1, 2004

  • DFI
    CFA Pile Design Parameters in Sand

    By Stuart Coutts

    "This paper presents an overview of the author’s experience related to the assessment of the base capacity of straight shafted and enlarged-base bored piles in sand. A design approach based on CPT qc

    Jan 1, 1900

  • DFI
    Hybrid Shoring Solutions for a Challenging Excavation Project Adjacent to a Subway – 21 Avenue Road, Toronto

    By Graeme Smart, Thomas Fiala

    "Yorkville Plaza II, a 40-storey signature condominium residence, is scheduled to open on Avenue Road in Toronto’s prestigious Bloor-Yorkville neighbourhood in spring 2017. In close proximity to Toron

    Jan 1, 2015

  • DFI
    Proceedings Of Earth Retention Systems 2003: A Joint Conference - Earth Retention Systems In The Urban Environment - Special Considerations

    By George J. Tamara

    The urban environment presents special challenges for the design and construction of earth retention systems. Complications arising from difficult subsurface conditions are compounded by the presence

    Jan 1, 2003

  • DFI
    Bertha Rescue Shaft – SR99 Tunnel

    By Lance Rasband, Richard Hanke

    "Seattle Tunnel Partners (STP) started mining on Seattle’s SR99 tunnel on July 30, 2013, working slowly through a 15 ft (4.6 m) thick fiber-reinforced concrete headwall. Once through the headwall, the

    Jan 1, 2015

  • DFI
    Field and Laboratory Mix Trials for a Deep Soil/Cement/Bentonite Cut-Off Wall Using CSM Equipment

    By Russell J. Denny

    "A 25m deep cut-off wall is required for environmental remediation of a Former Chlor-Alkali Plant. Extensive trials were conducted to verify the effectiveness of the mixes proposed, with the requireme

    Jan 1, 2015

  • DFI
  • DFI
    Design And Construction Of The Deepest Cfa Pile In Australia

    By W. L. Chong

    For a project located in Docklands Victoria, a high-rise development was proposed where the geology comprised soils of various compositions and consistencies to approximately 50m deep before being und

    Nov 1, 2022

  • DFI
    Selmon Expressway, Tampa: Case History of Drilled Shaft Design for Extreme Variability

    By Ross T. McGillivray, David S. Graham, Dan A. Brown, Steven D. Dapp

    "The Selmon Expressway includes an elevated structure extending across several miles of weathered karstic limestone geology, and represents a challenge for design because of the high variability of th

    Jan 1, 2015

  • DFI
    Turning the Valley of Ashes into a Tennis Haven: The Development History of the USTA Site in Queens, NY

    By Athena C. Denivo, Pablo V. Lopez, Michael McMaster, Sissy Nikolaou, Alfred H. Brand

    "The paper presents the history of development of the United States Tennis Association (USTA) site, focusing on geotechnical, geoseismic, and foundation engineering challenges associated with it. The

    Jan 1, 2016

  • DFI
    Deep Soil Mixing Design and Construction for Surface Fault Rupture Mitigation

    By James R. Gingery, Byron Foster, Bret Lingwall

    While microzonation and setbacks are the typical mitigation for structures exposed to surface fault rupture hazards, lifelines and lifeline facilities are not easily relocated to avoid faulting. In th

    Sep 8, 2021

  • DFI
    Principles and Soil Mixing Examples of Portland Cement-Based Solidification/Stabilization Treatment

    By Charles M. Wilk

    "Solidification/stabilization (S/S) treatment is used to treat hazardous wastes for disposal and in the remediation/site restoration of contaminated land . SIS is also an increasingly popular technolo

    Jan 1, 2005

  • DFI
    Construction And Stability Risks Of Fluid Supported Deep Excavations And Their Effects On Design Parameters

    By Martin D. Larisch

    The construction of diaphragm walls and most large-diameter bored piles (piers) is often carried out under drilling support fluids to temporarily stabilise the excavation prior to concrete placement.

    Nov 1, 2022

  • DFI
    Capacity of Hydraulically Jacked Piles

    By Howard A. Perko, Melinda J. Hummel

    "Hydraulically jacked piles, herein referred to as jacked piles, are commonly used for underpinning existing structures to arrest settlement or augment an existing foundation for higher loads. They co

    Jan 1, 2017

  • DFI
    Case Study of Deep Mix Pile Supported Diaphragm Wall for a Stilling Basin Structure in Malaysia

    By Chandrasegaran, Tamilmani

    "This paper describes a case study of a retaining wall structure using a diaphragm wall to construct a stilling basin at Tanjung Bin T4 power plant in Johor Bahru, Malaysia. The stilling basin is part

    Jan 1, 2015

  • DFI
    Residual Load Development Case Study In Driven Cast-In-Situ Piles

    By Packer M. L

    Residual load development in driven precast piles has been widely researched in recent decades, however, cast-in-situ piles are often falsely assumed to be unaffected by this mechanism. In contrast to

    May 1, 2022

  • DFI
  • DFI
    Utilizing Drones to Improve Project Workflows

    By Barritt Lovelace

    Collins Engineers has been researching and implementing the use of drones on Civil Engineering Projects since 2015. Applications include bridge inspection, asset management, mapping, construction site

    Jan 1, 2019

  • DFI
    The Deep Cut-Off at the Walter F. George Dam

    "TREVIICOS CorporationINTRODUCTIONThe Walter F. George lock and dam was constructed on the Chattahoochee River between 1955 and 1963 with the double function of improving navigation and generating pow