    Argosy Casino Expansion: Open Cell Sheet Pile® Harbor Project

    By Michael Lane

    With the success of their existing casino operation on the Ohio River in Lawrenceburg, Indiana, the Indiana Gaming Co., LP planned a major expansion of the current facilities. This expansion includes

    Jan 1, 2008

  • DFI
    Geographic Information Systems Technology Use in Tracking Quality Control in In Situ Barrier Wall Construction

    By Robert Bachus, Jamey B. Rosen

    "Abstract Large scale In Situ Barrier Wall Construction projects, specifically those related to earth dams, dikes, and levees, frequently require stringent quality control measures to ensure the succe

    Jan 1, 2014

  • DFI
    Seismic Hazards Evaluation and Lateral Pile Design in Diatomaceous Earth

    By Arash Khosravifar, Matt Steffan

    An expansion of the City of Klamath Falls Wastewater Treatment plant required geotechnical seismic hazard evaluations and deep foundation design. The site is located on the shore of Lake Ewauna and is

    Jan 1, 2018

  • DFI
    Excavation Support At The Capitol Visitor Center In Washington DC

    By Harald Ludwig

    In 2002, excavation support work commenced on the Capitol Visitor Center project located adjacent to the nation?s Capitol building in Washington, D.C. The outlying work (Slurry Wall Work at Main Site

    Jan 1, 2006

  • DFI
    Anchored Excavation Support Using SMW (Soil Mixed Wall)

    By Seth L. Pearlman

    A major excavation support case history for the Eastern approach to the Third Harbor Tunnel (THT) in Boston, MA is described, which uses an anchored Soil Mixed Wall (SMW). Both general and project spe

    Jan 1, 1993

  • DFI
    Non-Destructive Testing Of Drilled Shafts and CFA Piles – Current Practice and New Method

    By George Piscsalko

    "Quality control of drilled shafts and CFA piles is greatly dependent upon the practices of the site personnel. In many applications it is difficult or not possible to fully inspect the shaft prior to

    Jan 1, 2014

  • DFI
    Case Study: MGM Casinonational Harbor, Washington, DC Displacement Cast-In-Place Piles in Coastal Plain Soils

    By Karl A. H iggins, James P. Racine

    "Displacement Cast-in-Place (DCIP) piles are not a common deep foundation type in the Washington, DC Metro Area market. As a result, less regional data is available for these foundations compared to o

    Jan 1, 2017

  • DFI
    Static Uplift and Lateral Load Testing of Piles for a New Power Plant

    By José L. M. Clemente, John R. Davie

    "Abstract An extensive pre-production static and dynamic pile load testing program was conducted for a coal-fired power plant. The static load testing program included axial compression, uplift (tensi

    Jan 1, 2014

  • DFI
    Basement Excavation: Cost Effective Retention System for a Multi Storeyed Structure

    By Madan Kumar Annam, Hari Krishna Y

    "Basement construction is one of the challenging geotechnical concerns in the urban environment. Several types of retention systems are practiced to support the earth which is suitable for restricted

    Jan 1, 2015

  • DFI
    Theoretical Examination of Initially Bent Piles

    By Janne P. Isohaka, Anssi M. Laaksonen

    "Abstract In Scandinavia the use of steel pipe piles in bridge foundations started in the mid-1980s and has increased steadily since. As the piles driven in soft soils are slender, they can fail by bu

    Jan 1, 2014

  • DFI
    Recommended Steps And Procedures For Planning And Performing A Geotechnical Investigation For A Seismic Retrofit ? Introduction

    By Mark DeSalvatore

    Currently, at Caltrans, the Office of Structure Design is carrying out an extensive seismic retrofit program involving transportation structures throughout California. The goal of the retrofit program

    Jan 1, 1993

  • DFI
    Ground Support And Its Toolbox

    By G. Sauer

    "More Skill is needed to avoid rather than to handle heavy ground loads." This finding, from a tunneling engineer of the nineteenth century, is still relevant today with all advanced sequential excava

    Jan 1, 2003

  • DFI
    Design Of The Drilled Shaft Foundations For The Cooper River Bridge

    By Liang Shen

    The Cooper River Bridge, the longest cable-stayed bridge in North America, replaces two existing bridges along U.S. Highway 17 and connects the City of Charleston and the town of Mount Pleasant, South

    Jan 1, 2013

  • DFI
    Lateral Load Testing Micropiles To Evaluate The Impact Of Threaded Joints And Casing Embedment On Short Micropiles In Shallow Rock

    By J. Brian Anderson

    Jointed micropiles were investigated to support bridge foundations where shallow rock was present. In this application, micropiles would have some amount of unsupported length, and would be subject t

    Jan 1, 2011

  • DFI
    Design And Construction Of The Sutong Bridge Foundations

    By Robert B. Bittner

    The Sutong Bridge across the lower Yangtze River in China will have, when completed, the longest span (1,088 m) and the highest towers (306 m) of any cable stayed span in the world. The foundations fo

    Jan 1, 2007

  • DFI
    Reconstruction Of Hudson River Pier 86 - Home Of The USS Intrepid Aircraft Carrier

    By Michael Quadagno

    Hudson River Pier 86, home of the historic USS Intrepid Aircraft Carrier and the Intrepid Sea-Air-Space Museum, is currently undergoing a $30M reconstruction. This project involves the demolition of t

    Jan 1, 2008

  • DFI
    St Joseph Hospital Of Bellingham, Washington Addition Supported On Helical Pulldown Micropiles

    By J. L. Goen

    The Saint Joseph Hospital of Bellingham is located on a site underlain by glacial outwash. The construction of a five-story tower addition above an existing two-story wing was supported by five large

    Jan 1, 2004

  • DFI
    Pin Piles For Structural Underpinning - Summary

    By Seth L. Pearlman

    Pin Piles are small diameter high capacity drilled and grouted piles also called minipiles or micropiles. They are ideal for building foundations on sites with poor ground conditions, sensitive surrou

    Jan 1, 2000

  • DFI
    A Unique Solution To Mitigate Movement At The Jefferson Memorial Seawall

    By Jesús E. Gómez

    In the Summer of 2011, emergency repairs to the Jefferson Memorial North Plaza and Seawall were completed. These repairs were necessitated by settlement and lateral movement of the seawall and North

    Jan 1, 2011

  • DFI
    Kentucky Route 9 - Licking Pike Widening Design Build Slope Stabilization

    By Frederick W. Slack

    This paper will discuss the inherent value engineering associated with the design and construction of approximately 184,000 SF of anchored tieback wall, installed as part of the widening and drainage

    Jan 1, 2003