Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Soil-Structure Interaction For A Tension Pile Pulled With Strand

    By Chandramohan P. V

    A unique tension pile where the pull is at a point a certain distance below the top of the pile. The pull is transferred by a cable consisting of high tensile strands. The HDPE duct of the cable preve

    Nov 1, 2022

  • DFI
    Improvements in Deep Compaction Using Vibratory Pile Hammers (a877ad8a-6d27-4e33-a419-f0edb9bac870)

    By Dennis Nottingham

    "Increased interest in seismic soil liquefaction and preventative soil stabilization sets the stage for improved deep compaction methods using pile driving techniques. In 1971, L.B. Foster Company per

    Jan 1, 2005

  • DFI
    Eglinton Crosstown - Over and Under the Existing Subway

    By Shawna Munn, Sarah Speir

    Cedarvale Station is one of 25 new Eglinton Crosstown light rail transit (ECLRT) stations along Eglinton Avenue in Toronto. It is an interchange station with the existing Toronto Transit Com- mission

    Jan 1, 2023

  • DFI
    Advances In Marine Piling Techniques And New Age Piling Materials

    By D. Cantali

    This paper will be presented in two parts. The first part will present the latest advancements in pile installation techniques using state-of-the-art press-in piling technology by Giken. By pressing i

    Nov 1, 2022

  • DFI
    Ground-Supported Working Platforms For Tracked Plants And Mobile Cranes – Investigations Of Intercaction Effects

    By Moritz Schleeh, Christian Moormann

    Temporary working platforms are generally required in order to ensure that heavy construction machinery such as drilling and trench wall units, pile drivers, vehicle and crawler cranes can be set up s

    May 1, 2022

  • DFI
    Determination Of Pile Spring In Stratified Layers

    By Sandeep Pattnaik

    Spring stiffness of soil and rock at different depth is often required for a pile structural model. If the pile is rested in multiple layers of soil, then it is rather more complex to simulate the soi

    Nov 1, 2022

  • DFI
    Augered Cast-In-Place Piles Quality Control

    By Rudolph P. Frizzi

    The current trend of increasing augered cast-in-place (ACIP) pile diameter, length, and load carrying capacities demonstrates improvements in installation equipment, increased acceptance, and that qua

    Jan 1, 2001

  • DFI
    Contactless Anchor Measurement with Elastomagnetic Sensors

    By Damir Dedic, Wörle. Patrick

    "Soil properties within a construction project area are analyzed during the planning phase. However, it is only possible to achieve selective soil exploration, even in the case of very extensive inves

    Jan 1, 2017

  • DFI
    Case Study Of Three Bidirectional Static Load Tests For Bored Piles At Sabana Costa Rica

    By Mauricio Coto

    Three bidirectional static load tests (BDSLT) were executed on bored concrete piles, as part of the permanent foundations for two buildings sites located at the Sabana, San Jose, Costa Rica, separated

  • DFI
    Failure Analysis and Strengthening of Tailing Pond Embankment by Prefabricated Vertical Drains and Geogrid

    By Anup Kumar Mandal, Sanjoy Chowdhury, Biswajit Das

    "Tailing pond of an iron ore mine necessitated raising the height of its embankment to create additional storage capacity. The tailing pond is located in eastern India and raising the height of embank

    Jan 1, 2015

  • DFI
    Seismic Stability Analysis of Seepage Control Measures for Levees in Central Valley, California

    By Zia Zafir

    "Levees in the central valley of California are primarily for flood control purposes and thus are subjected to infrequent hydraulic loading. The primary concern for these levees is their instability d

    Jan 1, 2016

  • DFI
    Vertical Load Sharing of Piled Raft with Grid-Form Deep Mixing Walls

    By J. Hamada, K. Yamashita, Y. Shigeno, T. Tanikawa

    "This paper offers a case history of piled raft foundation in soft ground supporting a twelve-story building in Tokyo. To increase bearing capacity of the soft soil as well as a countermeasure of liqu

    Jan 1, 2015

  • DFI
    Tresfjord Bridge -Pile Works

    By Andreas Andenæs, Arne Schram Simonsen

    "AbstractThe Tresfjord bridge is with its variety in foundation concepts and difficult soil conditions one of the most geotechnically challenging projects in Norway at the time. The project comprises

    Jan 1, 2014

  • DFI
    TRD Soil Mixing at Herbert Hoover Dike

    By George Burke

    "Many soil mixing methods have evolved over the years, but the Trench Cutting Re-mixing Deep method (TRD) was developed in Japan, circa 1993, to construct continuous uniform cutoff walls, without the

    Jan 1, 2009

  • DFI
    Reverse Circulation Drilling (Rcd) Technology For Largediameter Piles

    By Nikolas Schmitz

    For today’s construction industry, large-diameter piles are common practice, as they are more competitive than drilling a larger number of smaller piles. More and more piles are installed by drilling

    Nov 1, 2022

  • DFI
    Performance Of Open And Close-End Screw Piles In Bearing Layer

    By Faisal Shalzad, Adnan Anwar Malik, Tadashi Maejima, Jiro Kuwano

    Single helix screw piles carry most of the structural load through end-bearing if the helix is embedded in the dense bearing layer. The tip condition of the central shaft of the screw pile can be clos

    Oct 1, 2022

  • DFI
    Centrifuge Modelling Of Displacement Piles and Installation Effects

    By J. Gniel, L. King, C. Gaudin, C. O’Loughlin

    "This paper presents some recent advancements in centrifuge modelling, which enable the installation of displacement piles to be performed in-flight while measuring ground responses. Details and resul

    Jan 1, 1900

  • DFI
    Innovative Use Of Ground Improvement

    By Mark Koelling

    This paper presents a case history of a ground improvement program conducted in a soft soil environment and seismically active region in the northwest corner of Washington State near the Canadian bord

    Jan 1, 2010

  • DFI
    Thirty Years of Experience with the Wave Equation Solution Based on the Method of Characteristics

    By Peter Middendorp, Gerald E. H. Verbeek

    "This paper will describe a brief history of the method of characteristics as an accurate solution of the wave equation, and the author's experiences with the method of characteristics over a period o

    Jan 1, 2005

  • DFI
    An Introduction to Water-Powered Down-the-Hole Drilling in Specialty Geotechnical Construction

    By Stefan Swartling, Rudy Lyon, Donald A. Bruce

    "Since their first production application in Sweden in 1995, water-powered, down-thehole hammers (WDTH) have been used throughout the world in many different drilling applications, total lines, over 2

    Jan 1, 2015