Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Analysis of Load Transfer along Large Diameter Bored Piles in Very Dense SandsBy Nabil F. Ismael, Khalid Farraj
"The axial load transfer along large diameter bored piles in very dense silty sand was examined by field tests. Two instrumented piles 1.2 m diameter and with embedded length of 18 m and 25 m were loa
Jan 1, 2017
-
Case Histories of Arch Action Low Improvement Ratio Cement Column Method (ALiCC Method)By Jun Ohbayashi, Yoshiyuki Yagiura, Hiroaki Miyatake, Masuo Kondoh, Naotoshi Shinkawa
"Reducing the improvement ratio of ground improvement is an extremely efficient way to reduce the construction cost and construction period of mitigation measures for soft ground. The Arch Action Low
Jan 1, 2015
-
Overview of Construction and Design of Auger Cast-in-Place and Drilled Displacement PilesBy Monica Prezzi
"Auger cast-in-place (ACIP} piles and drilled displacement piles are being increasingly used as foundation elements for structures, particularly in projects requiring accelerated construction or invol
Jan 1, 2005
-
Geo-Foundations Project Information Management Systems on a BudgetBy Jamey B. Rosen
As Project Information Management Systems (PIMS) technologies develop, the range of projects to which one can apply these technologies grows while the cost to apply them shrinks. In recent years, tech
Jan 1, 2019
-
New Orleans Levee Improvement Project: An OPA ContenderBy Filippo Leoni, Wesley Schmutzler
"The LPV-111 East Back Levee Improvement Project lies along the Gulf Intracoastal Waterway (GIWW) in Orleans Parish of New Orleans, La., and is an essential component of the New Orleans Hurricane Prot
Jan 1, 2013
-
Interactive 3-Dimensional Modeling of Anchors at Bluestone DamBy Jamey Rosen, Georgette Hlepas
"Bluestone Dam is a concrete gravity structure with an overall length of 2,060 feet and a maximum height of 165 feet above the streambed. Several major project modification designs have been implement
Jan 1, 2016
-
Using Thermal Integrity Profiling to Evaluate the Structural Integrity of Soil NailsBy Inc. Pile Dynamics, Daniel S. Belardo, Marcus Galvan, George Piscsalko
Soil nails are often utilized as a temporary or permanent earth retention technique for slope stabilization and for excavation retention for existing or new structures. Soils nails are generally advan
Jan 1, 2017
-
Experiences Using A Leader System For Long Cfa(Acip) Piles In HawaiiBy Damien Enright, Franz-Werner Gerressen
CFA/ACIP pile is the most used single pass drilling method for deep foundation installations. It is constructed by rotating and driving a Continuous Flight Auger (CFA) into the ground at a controlled
Oct 1, 2022
-
Noise Attenuation and Reduced Risk Associated With New Double- Walled Pile TechnologyBy Julie H. N. Hampden, Per G. Reinhall
"Executive summary: Impact pile driving of steel piles is a common construction practice in freshwater and marine environments for the building of structures and foundations. This practice produces ex
Jan 1, 2017
-
A Decade of Experience with Drilled Foundations in HonoluluBy James W. Niehoff
"Prior to 2003, most high rise structures in Honolulu, Hawaii were supported on driven pile foundations, extending through shallow coral strata and bearing in competent formations at depths of 100 ft
Jan 1, 2016
-
Building a High-Rise Adjacent to Transit Tunnels in San Francisco (6bdbc52a-94a2-4c48-ba21-cc4450dc649d)By Lori A. Simpson, Linda H. Liang
A high-rise building, consisting of two tower structures occupying the entire site, is in construction in San Francisco. The North Tower will consist of 12 and 35 stories above a one-level basement. T
Jan 1, 2017
-
Building A High-Rise Adjacent To Transit Tunnels In San FranciscoBy Lori A. Simpson
A high-rise building, consisting of two tower structures occupying the entire site, is in construction in San Francisco. The North Tower will consist of 12 and 35 stories above a one-level basement.
-
Stone Column Treatment and Elaborate Load Tests Verification for Improving Subsoil Conditions on a Large-Scale Residential Development ProjectBy Vijaya Bhushan Rao, Jason Redgers
A substantial lifestyle destination in the United Arab Emirates, in the Emirate of Abu Dhabi comprising of 1315 villas, town houses and non-residential leisure facilities is built over an area of 280
Sep 8, 2021
-
Atlantic Wharf: Redevelopment Of A Historic Site On Boston's WaterfrontBy Lee S. Vanzler
Atlantic Wharf involved the construction of a six-level underground parking garage and a 32-story high rise tower along the historic Boston Harbor waterfront. The site, historically known as ?Russia W
Jan 1, 2011
-
Marine Clay Stabilisation Using An Encased Stone Column With Tyre Chips As AggregatesBy Rangaswamy. K, Naga Sivaji
A stone column is one of the most commonly employed methods of ground improvement techniques. This method used to increase the strength, decrease the compressibility of loose granular and finegrained
Nov 1, 2022
-
Fogg Museum Expansion - Support of Excavation Design and ConstructionBy James L. Christensen, Gregory Sanchez, Michael P. Walker
The Fogg Museum expansion project required excavation and construction in a congested urban area in Cambridge, Massachusetts. A soldier pile tremie concrete (SPTC) wall provided the support of excavat
Jan 1, 2015
-
Caisson Foundations For Mississippi River Bridges In The New Orleans Area (2e66a216-6dc8-4479-804e-25f5836f407e)By William B. Conway
This paper will describe the large caisson pier foundations for four of the bridges crossing the Mississippi River in the New Orleans area; and will discuss some of the unusual problems encountered du
May 11, 2007
-
Laboratory Mixing and Testing for Controlled Waste Disposal SiteBy Tomohiro Yamasaki
"At the pre-construction foundations of the controlled waste disposal site built at the Port of Kinuura, the clayey soil account for the most, and with lesser amounts of sand compaction piles and sand
Jan 1, 2015
-
Role Advanced Technology - Resolve Inherent Dichotomy In High Strain Dynamic TestingBy Achyut Kumar Allady, Praveen Arumughan
NCHRP Synthesis 418 (2011) entitled, “Developing Production Pile Driving Criteria from Test Pile Data” details the occurrence of dichotomy between pile Skin resistance and pile Tip resistance mobiliza
May 1, 2022
-
Cast Insitu Piling For The King's Wharf Project, Sydney, AustraliaBy Slav Tchepak
The King's Wharf development is located in Sydney's Darling Harbour area. The site was originally used for industrial maritime purposes, which over the years has been reduced to accommodatin
Jan 1, 2000