Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Use of X-Ray Computed Tomography to Quantify the Diffrences in Cracks and Pores of Sphalerite Ore Particles When Comminuted Using an HPGR and Cone Crusher for Heap Leach Feed Preparation (fc3480c4-6fd4-4fbd-a6a3-d3a6bd59fe1f)

    By J. T. Kalala

    Particles for heap leaching in conventional circuits are prepared using Cone crushers. Cone crushers are used to crush the ore to the size range between 12-25 mm for heap leaching operations. Leaching

    Jan 1, 2012

  • CIM
    Application of Advanced Directional Drilling and Artificial Permeability Creation for In-Situ Recovery of Minerals

    By K. R. Brown, P. L. Krawchuk

    In-situ recovery (ISR) is under increased investigation as a viable methodology for the extraction of minerals in ore bodies that may be uneconomic to mine by traditional methods or for resources situ

    Jan 1, 2019

  • CIM
    Thermophysical Experiment and Numerical Simulation of Thermal Cracking and Heat Transfer for Oil Shale

    By Y. J. Yu, C. D. Zhang, Y. S. Zhao, W. G. Liang, Y. D. Geng, J. L. Bi

    "In this study, the coefficient of thermal expansion (CTE) and thermal conductivity (TC) of shale in two perpendicular directions, vertical and parallel to the bedding of the rock, are firstly measure

    Jan 1, 2015

  • CIM
    Partners for Mutual Benefits ? Training by Inclusiveness

    Training by Inclusiveness ?Background ?Video ?Results ?Partners ?How SEM works ?Future of SEM Background: Inclusivity partners ?Northwest Community College ?Smithers Exploration Group ?With

    May 1, 2010

  • CIM
    Use of Airborne Resistivity Surveys for Gravel Location

    By R. W. Culley

    "In many areas of Saskatchewan, known gravel deposits have been depleted or are diminishing rapidly; in other areas, particularly in the north, demands for all-weather highways and access roads are fa

    Jan 1, 1973

  • CIM
    Principal Types of Iron-Formation and Derived Ores (c790e046-3ab7-49c9-a5af-9c8aaba2813d)

    By G. A. Gross

    "Nearly 90 per cent of the iron ore produced in Canada is derived from iron-formation or bedded iron deposits. About 70 per cent of this consists of concentrates obtained from iron-formation; another

    Jan 1, 1966

  • CIM
    Complex Copper Pyrometallurgy Challenges and Opportunities - Integrated Experimental Phase Equilibria and Thermodynamic Modelling Research and Implementation

    By T. Hidayat, D. Shishin, V. Prostakova, M. Shevchenko

    The chemical compositions of copper feed streams are becoming increasingly complex following the growing demand for metals and corresponding shortages of primary sources. The optimisation of process c

    Jan 1, 2019

  • CIM
    Robotic systems development for mining automation

    By S. Flewelling, M. Scobie, G. R. Baiden

    "SynopsisA feasibility study to develop a research program, the Mine Automation Plan (MAP), was recently completed. This was undertaken by a team comprised of Inco Ltd., Falconbridge Limited, the Cana

    Jan 1, 1994

  • CIM
    Pre-Reduction of Blast Furnace Burdens Using the S-L Process

    By F J. Pearce

    The Steel Company of Canada, utilizing the S-L process, has produced partially and highly reduced pellets for use in the blast furnace. Experimental blast furnace tests, using reduced pellet burdens,

    Jan 1, 1964

  • CIM
    Correlating Economic and Social Data for a Globalized Mineral Investment

    By Zetti Gavelán

    Globalization and the search for new ore deposits inevitably lead to investment in foreign markets. Investors need to be aware of the effect of their venture on regional, social and economic issues wh

    May 1, 2003

  • CIM
    Supervisory Control Project Of A Copper Solvent Extraction Pilot Plant

    By L. G. Bergh

    The experience developing a supervisory control and information systems in a SX pilot plant is presented. The plant is located at the Process Control Laboratory, Santa Maria University, in Chile. In t

    Jan 1, 2007

  • CIM
    The Influence of the Natural Abundance of Metals on Exploration

    By James K. B. Booth

    The natural crustal abundances of the principle metals of commerce are examined in relation to production and prices for each metal. Two factors, the abundance x price ratio (BP factor) and abundance/

    Jan 1, 1971

  • CIM
    Development of an Electrochemicalmicrobial Sensor for Analyticaldetermination of Pb(II) Ions in Aqueous Solution

    By R. V. Kumar, C. Schwandt, S. Subramanian, S. Sampath, S. Vimalnath

    Waste waters and industrial effluents containing toxic heavy metals such as Pb, Hg, As and Cr, beyond permissible limits (0.1 ppm, 0.01 ppm, 0.02 ppm and 0.05 ppm, respectively) (WHO, 2011), pose seri

    Jan 1, 2016

  • CIM
    Fire in Dominion No. 16 Colliery, New Waterford, Nova Scotia

    By Louis Frost

    "A FIRE which forced the sealing -of the east side of Dominion No. 16 Colliery in the Town of New Waterford, Nova Scotia, occurred on October 6th, 1952 (Figure 1).So far as can be ascertained, the fir

    Jan 1, 1953

  • CIM
    1976 Federal Budget - Grab Bag of Tax Changes

    By R. D. Brown

    "Finance Minister Donald Macdonald's budget of May 25, 1976 featured a restructuring of the anti-inflation profit controls and a grab bag of tax changes, some of direct interest to the mining industry

    Jan 1, 1976

  • CIM
    Carbon Ratios of Coal as an Index of Oil and Gas Prospects an Western Canada

    By G. S. Hume

    In the transformation of carbonaceous materials, such as peat, to coals of various grades, the changes are known to be both physical and chemical and the grade of coal finally produced depends on the

    Jan 1, 1927

  • CIM
    The compression-percolation test for mine tailings backfill

    By R. J. Mitchell

    "A lest apparatus has been developed for obtaining the relations among confining stress, porosity and percolation rate for hydraulic sand backfills. The apparatus can also be used to evaluate internal

    Jan 1, 1981

  • CIM
    Overview of overburden removal at Syncrude Canada Ltd.

    By Y. P. Malhotra, JE. C. Carter

    "Syncrude's overburden removal requirement ranges from 20 million to 30 million bank cubic metres per year to meet tarsand demands for the production of 129,000 barrels of synthetic crude oil per

    Jan 1, 1983

  • CIM
    Effects of Niobium Addition and Cool Deformation on Microstructure and Mechanical Properties in Low Carbon Microalloyed Steels

    By F. Siciliano, D. Bai, S. Yue, A. M. Elwazri

    The influence of niobium addition and very low temperature (`cool') deformation on the microstructure and properties of low carbon microalloyed steels was investigated. In this work, the specimen

    Jan 1, 2005

  • CIM
    Overdrilling of Open-Pit Blast Holes

    By A. Galibois, H. Monette, J. L. Collins

    This paper deals with the problem of caving, which occurs in varying degrees in blast holes before loading. It is shown that the distribution of the amount of caving in materials may be described by a

    Jan 1, 1971