Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Comparision of Two Sizes of FSFs in the Glogów Copper Smelter

    By L. Garycki, P. Poks, R. Urbaniak, T. Gabka

    In 2016 at Głogów Copper Smelter KGHM Polska Miedź S.A., after shutting down the shaft furnaces new FSF was launched. Currently, it is the only smelter with two direct to blister flash smelting furnac

    Jan 1, 2019

  • CIM
    The NICO and Sue-Dianne Proterozoic, Iron Oxide-hosted, Polymetallic Deposits, Northwest Territories: Application of the Olympic Dam Model in Exploration

    By Kathryn L. Neale, Derek L. Mulligan, Robin E. Goad, Norman A. Duke, A. Hamid Mumin, W. John Camier

    "Abstract - The NICO and Sue-Dianne deposits are being explored and delineated by Fortune Minerals Limited in the Mazenod Lake District of the Northwest Territories, using an Olympic Dam model. The de

    Jan 1, 2000

  • CIM
    Laboratoire d?analyse des fluids

    By Valérie Tremblay

    Plan de la presentation ?Laboratoire d?analyse des fluids ?Gestion des contaminants ?Condition Monitoring Avantages reliés aux analyses ?En savoir plus!! ?pour minimiser les coûts d?opération;

    Feb 1, 2008

  • CIM
    The Effect of Shotcrete on the Flotation Nickel Recoveries of Falconbridge Nickel-Copper Ore

    By Peter Wells, Laxman M. Amaratuga, Todd M. Kanhai

    "Certain mining methods (eg. Cut-and-fill) result in the contamination of run-of-mine ore with shotcrete. This shotcrete remains mixed with the ore throughout processing. Experimentation performed by

    Jan 1, 2000

  • CIM
    CO Oxidation Activity and Temperature-Programmed Reduction Study of Au/CuZnOx Catalysts

    By Stephen J. Roberts

    Gold catalysts were prepared on co-precipitated, calcined copper oxide - zinc oxide support by an inverse deposition-precipitation method. These catalysts were characterised by X-ray diffraction (XRD)

    Oct 1, 2003

  • CIM
    150th Anniversary Victoria Bridge, 1859 - mid-December, first train; 1860 August, celebration

    By H. J. McQueen

    ORDER OF PRESENTATION ?INTRODUCTION TO THE VICTORIA BRIDGE ?REASONS FOR A BRIDGE AT MONTREAL ?RAILROAD BRIDGE REQUIREMENTS ?IRON PRODUCTION CANADA / WORLD AL ?METALLURGICAL INDUSTRY CANADA ?FA

    May 1, 2011

  • CIM
    Continuous Training – Insurance for Sustainable Operation

    By Richard Phiri, Mike Milupi, Jackson Kapobe, Anton Lemmer, Charles Mazala

    Sustainability of plant operations in a rapidly changing mining environment requires a well-trained workforce to ensure smooth running of operations. To ensure availability of trained labor, Mopani Co

    Jan 1, 2019

  • CIM
    Green Supply Chain Management: A Future Need For Mining And Mineral Industry

    By D. P. Tripathy

    A supply chain encompasses all the activities associated with the flow and transformation of goods from the raw materials stage(extraction), through to the end user. Supply chain management (SCM) is t

    May 1, 2006

  • CIM
    Increasing Availability through Advanced Gearless Drive Technology

    By C. Dirscherl, M. Combes

    "Declining ore grade, leading to increased material transport and plant throughput requirements, is one of the major challenges in the current mining environment. This is accompanied by rising energy

    Jan 1, 2014

  • CIM
    UNIFLOT SP129 - Copper Sulphide Collector

    By S. Auger, S. McDonald, K. Ward

    "This preliminary paper provides a summary of lab and mill flotation investigations into the copper collector at two Canadian operations. The orebodies illustrated in these studies both contain mainly

    Jan 1, 1992

  • CIM
    In Situ Synchrotron Radiation Diffraction during Compression of a ZKQX Alloy

    By K. U. Kainer, A. Stark, D. Tolnai, M. Hehenberger, C. L. Mendis, N. Schell, N. Hort

    Samples of an as extruded Mg-6Zn-0.6Zr-0.4Ag-0.2-Ca (wt.%) alloy was compressed at room temperature and at 250°C. The in situ deformation tests were performed at the P07 (HEMS) beamline of PETRA III,

    Jan 1, 2014

  • CIM
    Chemistry of paste backfill

    By Jacques Ouellet, Ferri Hassani

    "Within the mining industry paste backfill technology has evolved over the last two decades. This technology aims at producing safe and cost effective backfill of high strength. When used as cemented

    Jan 1, 2002

  • CIM
    On-line Moisture Determination of Ore Concentrates ‘Review of Traditional Methods and Introduction of a Novel Solution’

    By Phillip Cancilla, Daniel Roy, Frank Rosenblum

    "The manual moisture determination methods employed today by mineral processing plants falls short in providing timely information required for automation control. The costs associated with transporti

    Jan 1, 2001

  • CIM
    In situ acid leaching of copper tailings deposits: A case history

    By C. D. Shackelford, J. F. Muñoz, M. Vauclin, P. Rengifo, A. Suazo

    The results of a field-scale study involving in situ leaching of copper ore tailings using sulphuric acid as the leaching agent, injection wells to introduce the leaching solution and extraction wells

    Jan 1, 2001

  • CIM
    Selective Highwall Mining at the Dome Open Pit Mine

    By J. G. Henning

    Following completion of planned mining operations at the Goldcorp Dome Open Pit Mine, a high-grade Shaft Pillar located in the pit highwall was recovered. Mining of this Shaft pillar faced numerous ro

    May 1, 2009

  • CIM
    Flotation of a Copper-Gold Oxide-Sulphide Ore

    By T. Chong, R. Pesalj, B. Marchant, Z. Nikic

    "The Mount Polley copper/gold project is located in central British Columbia and is currently being developed by Imperial Metals Corporation. Extensive laboratory and pilot plant testing was required

    Jan 1, 1991

  • CIM
    Robust image segmentation technique for rock fragmentation analysis

    By G. K. Mann

    Fragmentation analysis of blast or crushed rock material is a time-consuming and costly process. During the last two decades, the mining industry has been investigating image-based analysis systems as

    Jan 1, 2006

  • CIM
    The Link between Pulp Zone Hydrodynamic Characteristics and Froth Stability in a 125 m3 Flotation Column

    By D. Knuutila, G. Goyette, James A. Finch, G. Bartolacci, A. Fortin, Chi Ho Lau, A. Lockhart

    "In a COREM-McGill collaborative research and development project, gas dispersion parameters and froth properties were manipulated in a copper flotation plant to study interactions between the collect

    Jan 1, 2008

  • CIM
    Participative Management at the Golden Giant Mill, A Co-Ordinators Perspective

    By K. Barr, F. Grenier, J. Hettinger

    "To reach the Hemlo Gold Inc. objective of becoming the lowest cost, safest Canadian gold producer while causing no environmental damage, management embarked from its inception on a strategy to build

    Jan 1, 1988

  • CIM
    Concentrate Grade and Regrind Size Improvement on the East Pit Hypogene Ore at Kemess Mine

    By E. Roman, M. Brissette

    "For its end of life, Kemess Mine processed its difficult-to-treat hypogene ore from the east pit, which is a lower grade copper and higher pyrite content gold ore. Metallurgical testwork showed that

    Jan 1, 2012