Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Why Aren?t We Using More Thermal Coal in Canada? ? The Real Reasons

    By Roger K. M. Bellows

    The last coal-fired power plant to be built in Canada came into operation in 1994. Since then, Canada?s electricity requirements have grown substantially but no new coal-burning plants have been built

    May 1, 2001

  • CIM
    Uranium deposits of the Carswell structure

    By Roger T. Laine

    "The Carswell structure, located in the western part of the Athabasca Basin, northern Saskatchewan, has been extensively explored since 1967. This exploration has been successful and lead to the disco

    Jan 1, 1986

  • CIM
    Some Mathematical and Analysis of Underground Model Guides 1n the Mine Stress Problems

    By Stefan Boshkov

    THE ADVENT of mining at great depth has brought to the fore the question of stresses around mine openings. The many-pronged attack on this problem is certified by the accelerated appearance, in the mi

    Jan 1, 1956

  • CIM
    Limestone Drain Design Criteria in AMD Passive Treatment : Theory, Practice and Hydrogeochemistry Monitoring at Lorraine Mine Site, Temiscamingue

    By Louis R. Bernier

    Since 1978, most systematic studies of AMD passive treatment with limestone drains (LD) have dealt with coal mines in the United States. The authors present in this paper the first results of a trienn

    May 1, 2001

  • CIM
    Report on the Rockburst Situation in Ontario Mines

    By R. G. K. Morrison

    By arrangement between the Ontario Mining Association and Messrs. John Taylor & Sons, Mining Engineers, 6 Queen Street Place, London, E.C.4, the writer was engaged for a period of not more than three

    Jan 1, 1942

  • CIM
    Methods of Breaking and Handling Ore at East Geduld

    By A. S. Knight

    THE breaking and handling of ore is obviously the most important consideration when the layout of a new mine is contemplated. The problem must be attacked with due regard to the claim area of the prop

    Jan 1, 1942

  • CIM
    Classifying Variability of Material Properties in Mine Waste Rock

    By N. A. Beier, R. Amos, Smith. L., C. Atherton, D. R. Barsi, D. Blowes, D. C. Sego

    "Waste rock is one of the most abundant materials at mine sites and must be properly characterized and managed to limit acid rock drainage and other harmful byproducts. An experimental waste rock pile

    Jan 1, 2019

  • CIM
    A Conceptual Circuit Development for Gold Processing Based on Bromine/Bromide Lixiviant

    By Mike Dry, Mani Manimaran, Mykolas Gladkovas, Mariam Melashvili, Chris Fleming

    Development of a new hydrometallurgical flowsheet requires quantitative description and optimisation of all chemical processes in each step in the process, as well as mass and energy balances across a

    Jan 1, 2015

  • CIM
    The Cape Breton Development Corporation

    By A. Roy MacLean

    "Cape Breton is an island on the eastern extremity of Nova Scotia, Canada. Here, coal mining under the Atlantic Ocean has been a way of life since the early French militia mined coal for heating purpo

    Jan 1, 1985

  • CIM
    Connecting Mines and Communities: An Overview of the Elk Valley in S.E. British Columbia

    Delivering Our Products On any given day in North America, 80 kilometers of rail cars are engaged in moving our product. Global Customer Base Our business accounts for more than 30% of all bulk

    May 1, 2006

  • CIM
    Water Policy at Inco Metals Company Mills Ontario Division

    By H. R. Butler

    "The Ontario Division of Inca Metals Company, a Unit of Inca Limited, operates eleven mines, four mills, three refineries, one smelter and one iron ore recovery plant. All but one mine, mill and refin

    Jan 1, 1980

  • CIM
    Sample bias and conditional probability ore reserve estimation at Valley

    By G. F. Raymond, W. P. Armstrong

    "At the time of this study, the Valley mine was producing 23 000 tonnes of ore per day from a large, low-grade porphyry copper orebody. Sulphide mineralization, principally bornite and chalcopyrite, o

    Jan 1, 1988

  • CIM
    Economics of Ferrous Smelting in Canada

    By P. E. Cavanagh

    Introduction A comprehensive study of the economics of processes for smelting iron ores has been made by the Ontario Research Foundation on behalf of the Ontario Research Commission. This survey ha

    Jan 1, 1948

  • CIM
    A re-appraisal of the geology and ore deposits of the Horne Mine Complex at Rouyn-Noranda, Quebec

    By David J. Kerr, Robert Mason

    "From1927 to1989, the Hornemineproduced53.7 Mt of ore grading 6.1 g/t Au and 2.2% Cu from two large volcanogenic massive sulphide deposits composed primarily of pyrrhotite, pyrite and chalcopyrite. Th

    Jan 1, 1990

  • CIM
    A Supply System for Western Canadian Thermal Coal

    By E. G. Bazeley

    The paper reviews the scope, timing and financial impact of this significant project, which involves the supply and transportation of nearly 4 million tons per year of bituminous coal and lignite from

    Jan 1, 1978

  • CIM
    Recovery of Zinc and Lead from Complex Low-Grade Sulphide Concentrates by Acid Pressure Leaching

    By V. N. Mackiw, H. Veltman

    "A process is described which permits the separate recovery of lead and zinc from complex low-grade sulphide concentrates such as are produced from the New Brunswick type of disseminated pyrite ores.

    Jan 1, 1967

  • CIM
    Occupational Health and Safety in Metallurgical Plants

    By John C. Taylor

    A resource document, prepared for the Royal Commission on the Health and Safety of Workers in Mines, which outlines aspects of occupational health and safety in the Canadian metallurgical industry has

    Jan 1, 1978

  • CIM
    Practical rock engineering stope design case histories from Noranda Minerals Inc.

    By D. Milne, P. Germain, G. Sauriol

    "The practical determination of optimum stope geometry has, until recently, been an art relying primarily on experience at a given operation. Due to the complex and variable nature of rock masses in s

    Jan 1, 1989

  • CIM
    Bourlamaque batholith and its gold potential, Val d'Or, Quebec

    By Mehmet F. Tauer, Pierre Trudel

    "The metamorphosed mineralized Archean Bourlamaque batholith, dated at 2710 +-54 Ma, is a homogeneous body, composed mainly of quartz diorite; it is cut by late dioritic, mafic and aplitic dykes, and

    Jan 1, 1989

  • CIM
    Thermoluminescence of Rocks as a Prospecting Tool-Equipment and Methods

    By D J. McDougall

    Due to changes in the solid-state conditions of minerals in the rocks surrounding hydrothermal, contact meta-somatic or metamorphosed ore deposits, positive or negative thermoluminescent anomalies may

    Jan 1, 1965