Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Precipitate Flotation for the Removal of Heavy Metals and Cyanide from Metallurgical Effluents

    By CorrOa de Araujo A, Salum MJG

    The treatment of mining and metallurgical liquid effluents is becoming, everyday, a necessity felt by these industries. Physical-chemical and chemical methods for treating such effluents are general

    Jan 1, 1993

  • AUSIMM
    The integration of mine-to-mill and grade engineering at Anglo American’s Los Bronces Mine using IES

    By J Rutter, E Amini, D La Rosa, N Beaton, M Scott, F Faramarz, L Keeney

    Anglo American’s Los Bronces copper mine in Chile has been conducting detailed assessments investigating value adding options for their asset. The mine has conducted several detailed Mine-to- Mill and

    Nov 10, 2020

  • AUSIMM
    The Impact of Residence Time on Copper Recovery in Telfer Gold MineÆs Cyanide Recycling Process

    By P Breuer, A Simons

    The sulfidisation, acidification, recycle and thickening (SART) process is currently being used at NewcrestÆs Telfer Gold Mine to recover cyanide and copper from the cyanidation tails of the pyrite co

    Sep 26, 2013

  • AUSIMM
    Unravelling the Factors Impacting on Concentrate Quality by Geometallurgical Data Analysis at Fortescue Metals Group’s Iron Bridge Magnetite Mine

    By A Manfrino

    The Iron Bridge magnetite mine and infrastructure project is currently in development as a joint venture between Fortescue Metals Group, Formosa and Baosteel. It is supported by an extensive database

    Jul 13, 2015

  • AUSIMM
    What Information and Production Benefit Can I Gain by Using Digital High-Speed Camera and Data Capture Technology?

    This paper will address this question from the point of view of a drill and blast engineer or researcher working in open cut and underground mining operations. The paper will establish a common set of

    Jan 1, 2007

  • AUSIMM
    Management of riverine disposal of tailings and waste rock for AMD control at the Ok Tedi copper-gold mine

    By S Davidge, J Pile, R Schumann, E Kepe, W Stewart, M Ridd, B Rathi

    Geographical constraints, including steep terrain and high rainfall, at the Ok Tedi copper-gold mine in PNG’s Western Province present Ok Tedi Mining Limited (OTML) with significant challenges in mine

    Aug 2, 2023

  • AUSIMM
    Trident Underground Gold Mine – The First Three Years

    By J Howard

    Following discovery in October 2004, commencement of development in February 2007 and first ore production in mid 2007, the Trident gold deposit, located in the Eastern Goldfields of Western Australia

    Mar 21, 2011

  • AUSIMM
    Mining Truck Operations in Association with Truch-Jig Apparatus

    This paper describes a mine truck hauling process called "Truck Jigging" which is currently the subject of a process patent application.The investigation explores the production and cost adv

    Jan 1, 1989

  • AUSIMM
    Acidic Drainage From Calcareous Coarse Kimberlite Reject, Ekati Diamond MineTM, Northwest Territories, Canada

    By J Millard, K Sexsmith

    BHP Billiton Diamonds Inc (BHPB) has been mining kimberlite from several pipes at the Ekati Diamond MineTM located 300 km north of Yellowknife since 1997. Processing of kimberlite produces coarse kimb

    Jan 1, 2003

  • AUSIMM
    Simulation of Flotation Feed Pre-Classification

    By J Arola, B Kettunen, W M. Bond

    Separation of fine and coarse particles as separate streams prior to flotation, and their differential treatments, could substantially increase recovery and reduce collector consumption. A series of s

    Jan 1, 2005

  • AUSIMM
    Knelson Continuous Variable Discharge Concentrator: Analysis of Operating Variables

    By I Grewal, B Klein

    The Knelson Continuous Variable Discharge (CVD) is a continuous centrifugal gravity concentrator for high-mass yield recovery applications. It has four operating variables that enable control of mass

    Jan 1, 2001

  • AUSIMM
    Assessment of lifter effect on tumbling mill dynamics using CFD-DEM coupling approach

    By K Mayank, A N. Mainza, I Govender, M Narasimha, A Mittal

    In mineral processing industries grinding is the most energy-consuming process. A tumbling mill is an essential grinding equipment widely used for particle size reduction. Power consumption, impact fo

    Aug 24, 2022

  • AUSIMM
    Data cross validation for a newly commissioned dynamic drop test facility

    By D W. Evans

    Research into the dynamic properties of ground support elements continues to grow at a global level, given the increasing importance of this field of application within underground hard rock mining. M

    Nov 29, 2022

  • AUSIMM
    Surface Monitoring, Understanding and Modification at Molecular Level in Mineral Beneficiation by Infrared External Reflection Spectroscopy

    By E Mielczarski

    Determination of the adsorbed layer composition and structure at molecular and atomic levels and understanding adsorption mechanisms and dynamics are vitally important for the preparation of surface l

    Jan 1, 2005

  • AUSIMM
    Estimation of Rock Load for Tunnels with Different Disturbance Factors

    By J Rostami, T Afshar, M Sharifzadeh

    Accurate estimation of rock load and selection of types of ground reinforcement to match post-failure behaviour of rock mass are important issues to assure tunnel stability. This paper focuses on the

    Sep 17, 2014

  • AUSIMM
    Five Years With Paste Fill ù Experience at Henty Gold Mine

    By T J. Grandfield

    Paste fill has been used successfully at Henty Gold Mine for the past five years. It has allowed 100 per cent extraction of the orebody, stabilised poor ground and enabled wide sections and offsets to

    Jan 1, 2002

  • AUSIMM
    Improving Fine Sulfide Mineral Recovery ù Plant Evaluation of a New Technology

    By K Ellis, B Lumsden

    A full-scale statistically-based on/off plant trial of a new flotation conditioning technology designed to improve fine mineral recovery was undertaken to determine whether the recovery of selected fi

    Jan 1, 2005

  • AUSIMM
    Understanding the Role of Production Drilling and Drilled Stocks in Efficient Operation of a Sublevel Cave Mine

    By C Beal

    Proper understanding and management of production drilling in sublevel cave (SLC) mines is essential for meeting production targets and for avoiding inefficiencies that could lead to costly bottleneck

    Mar 24, 2014

  • AUSIMM
    Geometallurgical Communication as a Distributed Information System

    By C Moorhead, J Jones

    A common problem in the mining industry is that company geologists can operate in relative isolation to the rest of the company (Jones and Moorhead, 2011). This may result in poor knowledge transfer a

    Sep 29, 2013

  • AUSIMM
    Use of drone and LiDAR technology for mapping underground voids

    By D Woolmer

    Since January 2019, BHP Olympic Dam have been trialling the use of a drone based LiDAR mapping system for the purpose for surveying stope voids. This new technology utilises Simultaneous Location and

    Mar 15, 2021