Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Optimising Large Flotation Cell Performance Through Advanced Instrumentation and ControlBy O Tiili, A Dixon
Many minerals processing plants need to have greater efficiency in current times and optimise their process performance in order to maintain high profitability. This is even more so in the current eco
Jan 1, 2009
-
Talisker Mine, 1862-1872 Its History and HeritageSilver-lead ores are widely distributed through- out the Mount Lofty and Flinders Ranges, but none of the deposits is large. Historically the Glen Osmond Mines are the most significant as the site
Jan 1, 1987
-
Development of the Presink System for Raise Boring at Xstrata Copper’s Mount Isa Copper OperationsBy G Chitumbura
Raise boring is a critical aspect of mining at Xstrata Copper’s Mount Isa Copper Operations (MICO). MICO’s internal raise boring department regularly develops ventilation rises, orepasses and stope cu
Mar 21, 2011
-
A System of Diluting Methane to Safe LevelsBy R Hughes
"Spring Creek Mine uses high pressure water to extract the thick Main seam in the Upper Rewanuicoal measures. The extraction method results in the creation of large voids which collapsespontaneously.
Jun 1, 2012
-
Sustainable production from rehabilitated coal mine pastures in southern Queensland’s Brigalow Region – Acland grazing trial resultsBy J Eberhard, C Paton, J Bennett, C Baillie, A Melland, J F. Clewett, T Newsome
A central aim of rehabilitation is to ensure that disturbed land is returned to a post-mine condition that is safe, stable and self-sustaining. This paper describes initial results from a grazing tria
Jul 25, 2018
-
The International Network for Acid Prevention (INAP) ù An Overview of ActivitiesBy A-M Fleury
There has been much progress on the issue of acid drainage over the past 20 years; however, significant challenges remain. The International Network for Acid Prevention (INAP) is attempting to address
Jan 1, 2003
-
Managing the Diamond Drilling Interactions in Commissioning the Ankata Underground MineBy L Sandery, S Light
Within 22 months of commencing decline development, the Prominent Hill Ankata Underground Project achieved its full production rate of 1.2 Mt/a.In 2010 construction of the Ankata Underground Project w
Mar 24, 2014
-
Current Trends in Countercurrent Decantation and Thickener Circuit Operability and ControlBy E Broers, J Goh, S Davies
With recovery being important in optimising the business performance of a laterite and sulfide plant and with water being a precious resource in Australia, there has been increased pressure for compan
Jan 1, 2009
-
An Alternative Whole-of-Life Approach to Tailings ManagementBy D J. Williams
Tailings management is typically constrained by many factors that are taken as given. These include the tailings production rate that must be accommodated, the desire to deliver the tailings cheaply a
Jul 16, 2014
-
Metallurgical Performance of Outotec’s e500 TankCell® at the Kevitsa Cu-Ni-PGE ConcentratorBy B Murphy, T Mattsson, R Crosbie, T Maksimainen
"An Outotec e500 TankCell, with 500 m³ of actual flotation volume, was commissioned at the Kevitsa Cu-Ni-PGE concentrator in northern Finland during 2014. This flotation cell was implemented at t
Oct 10, 2016
-
Carrapateena project to date – Geotechnical risks and managementBy G Balog, T Ormerod, D Cox
This paper discusses the methods utilised by the technical team to identify and quantify the SLC risk factors, the modifications to mine design and scheduling, and the changes to the planned risk mana
Mar 15, 2021
-
Regional Trade-Offs Between Mine Water and Energy Use - A Water Treatment Case StudyBy A Woodley, G Keir
The mining industry faces concurrent pressures of reducing water use, energy consumption and greenhouse gas (GHG) emissions in coming years. However, the interactions between water and energy use, as
Nov 26, 2013
-
A Holistic Viewpoint for Selecting the Vertical Haulage System – Shafts and ConveyorsBy R M. Krek
The haulage system used to convey ore from an underground mine to a surface stockpile at the mine process plant is a vital component of the mine’s overall infrastructure and economic viability. The sy
Mar 24, 2014
-
Partnering in Joint Ventures - Major vs MinorA mining joint venture presents a real management challenge to achieve harmony with the other participants in the successful development and operation of a mine. This can best be facilitated by a
Jan 1, 1997
-
A Review of the Kapit Orebody, Lihir Island Group, Papua New GuineaBy J R. Robinson
Prior to mine development, exploration drilling within the Luise Caldera on Niolam Island encountered gold mineralisation to the northwest of the main Minifie and Lienetz orebodies. This mineralisatio
Jan 1, 2004
-
Upstream Raising of Laterite Nickel Tailings Storage FacilitiesBy D A. Williams, J C. J Boshoff
The properties of tailings that emanate from laterite nickel processing plants are significantly different to most other mine tailings. They typically comprise a mixture of fine materials that are mad
Jul 27, 2015
-
Is Truck Queuing Productive?By P Malkin, S Thomas, P M. Stone, D Kostyuk
In open pit mining, it is common that the bottleneck to productivity and profit lies in the truck-shovel mining operation, especially as strip ratios and mining intensity have increased with resource
Nov 24, 2014
-
Geochemistry of Tailings and Seepage from Three Tailings Storage Facilities in Australia - Uncapped, Capped and Active TailingsBy T Baumgartl, D Bradshaw, B Forsyth, M Edraki
In a tailings storage facility, the chemistry of pore water is a function of oxidation and dissolution of sulfide minerals, containing metals and metalloids, the neutralising effect of gangue minerals
Jul 10, 2012
-
Gold Particle Characteristics in Narrow Vein Deposits - Implications for Evaluation and MetallurgyBy I M. Platten, Y Xie
Narrow vein gold mineralisation generally contains both fine (<100 ¦m) and coarse (>100 ¦m) gold particles. The in situ size and shape, deportment, distribution and abundance of the particles co
Jan 1, 2008
-
Managing Environmental Impact Assessments of Heavy Mineral Projects in Africa ù Potential Pitfalls and Proactive PlanningDetermining the environmental consequences of green field projects is becoming an increasingly important component of new projects. Feasibility studies are regarded by potential investors as incomplet
Jan 1, 2001