Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Toowong process for treatment of complex ores

    By L MacDonald, D Molver, D Pepper

    Increasing contamination/impurity levels (including arsenic, antimony, mercury etc.) of concentrates is an issue of global commercial and health / environmental significance. With increasing environme

    Nov 21, 2018

  • AUSIMM
    How Ore Deposits can be Overestimated Through Computational Methods

    By Watson DF

    Calculation of the amount of metal in an ore deposit or mining block should be approached by multiplication and integration of appropriate numerical manifolds describing the spatial distribution of

    Jan 1, 1987

  • AUSIMM
    Coobina Chromite Fines Plant û Designed on a Shoestring, Built in a Boom and Commissioned in a Bust

    Chromite ores have a long history of low pricing and for AustraliaÆs only chromite mine this has been a particularly tough challenge, especially as the mine is located nearly 400 km from the nearest p

    Jan 1, 2009

  • AUSIMM
    Mill Modelling Using an Extensible Station-Based Framework

    By E A. Gunn, J Zhou

    In this paper a project to develop a joint optimisation/simulation model for production planning in a mine-mill complex is presented. The system involves a mill receiving ore from a number of differen

    Sep 26, 2011

  • AUSIMM
    Spot Imagery for the Detection of Anomalous and Stressed Vegetation Over Mineral Deposits in Semi Arid Terrain

    SPOT imagery acquired in May 1986 of the areas that include the Dugald River lead-zinc lode, northwest Queensland, Australia and the Ngwenalekau copper deposit, Botswana has been evaluated and comp

    Jan 1, 1988

  • AUSIMM
    Geology and Genesis of Uranium-Rare Earth Deposits at Mary Kathleen, Northwest Queensland

    The Mary Kathleen uranium deposit occurs in 1740-1780 M yr-old calc-silicate melasedimentary and mela-igneous rocks of lhe Corella Formalion which have been tightly folded into lhe Mary Kathleen Syncl

    Jan 1, 1985

  • AUSIMM
    Health, Safety and Sustainability

    By D Cliff, K Bailey

    Traditionally occupational health and safety (OH&S) has been managed for the direct benefits of reducing injury and illness to workers on mine sites. In the current skill shortage climate it is im

    Nov 20, 2012

  • AUSIMM
    Is the Python Right for Me? Python

    Gekko Systems Pty Ltd have developed the Python Underground Processing Plant for the concentration of gold and sulfide ores. The Python plant has an established flow sheet including fine crushing, scr

    Aug 1, 2010

  • AUSIMM
    Revision of the Markham 1:250,000 Sheet, Papua New Guinea: What is the Finsterre Terrane?

    By Kagl J, Publlier M, Nekitel S, Arumba J, Rangin C, Mosusu N

    Since the advent of plate tectonic modelling, the Ramu-Markham valley has been thought the site of a classical island-arc/conti- nent collision zone. In this interpretation the units south of the Ma

    Jan 1, 1997

  • AUSIMM
    Quantitative Risk Assessment Tools to Assist with Waste Management and Placement Guidelines

    By S Lehane, S Pearce

    The characterisation and assessment of waste rock has been the subject of considerable research, and many guidance documents have been published both internationally and within Australia. While these

    Jul 27, 2015

  • AUSIMM
    Global Mining Standards and Guidelines for Determining Comminution Circuit Efficiency

    By A Giblett, M Daniel

    "The Global Mining Standards and Guidelines Group (GMSG) currently supports nine individual industry working groups focused on developing standards and guidelines for the mining industry. In 2013 the

    Oct 10, 2016

  • AUSIMM
    Size by Size Analysis of Operating Characteristics of Jameson Cell Cleaners at the Bajo De Alumbrera Copper/Gold Concentrator

    By A Murphy, D Lauder, J Miranda

    Minera Alumbrera Limited operates the Alumbrera concentrator, treating a nominal 80 000 tpd of porphyry gold/copper ore. It is located in Argentina, 1200 km north-west of Buenos Aires in Catamarca Pro

    Jan 1, 2000

  • AUSIMM
    Kidston Waste Rock Dump Design and æStore and ReleaseÆ Cover Performance Seven Years On

    By G W. Wilson, P Ritchie, N A. Currey

    The design and rehabilitation of potentially acid forming (PAF) waste rock dumps is site specific, being a function, among other factors, of the rock types, the dumping and storage method employed, an

    Jan 1, 2003

  • AUSIMM
    The Use of Rezoning Techniques to Model Historic Tailings Failures

    By D Reid

    Run-out analyses of tailings storage facilities are typically undertaken using methods based on rheological theory. These are reasonable techniques to model the behaviour of tailings that, through sig

    Jul 27, 2015

  • AUSIMM
    Geological Solutions to Short-Term Planning in Iron Ore ù A Pilbara Iron Example, Mt Tom Price

    By J Austin, R Bitencourt

    Differences between the long-term model (LTM) and mine geology system (MGS) grade control block-outs on a blast block scale can impose difficulties to planning crusher feed grade and tonnes on a month

    Jan 1, 2005

  • AUSIMM
    Local Resource Development Initiative - Developing a New Project Sustainability Model (Ambatovy Project Case Study)

    By S Novak

    A world-class example of sustainable development in practice, the Local Resource Development Initiative (LRDI) grew from agreements between the Ambatovy nickel mine developers and the Government of Ma

    Jan 1, 2009

  • AUSIMM
    Inclusion of Safescape Laddertube to enhance emergency egress in ventilation shafts

    By B Murphy

    Safescape Laddertube provides an improved system for emergency egress in ventilation shafts. The addition of Laddertube in a rise has very little impact on ventilation flow, studies have indicated th

    Oct 12, 2022

  • AUSIMM
    Setting for Success – Private Equity Exploration and Mining Project Buy-in to Listing and Divestment

    By A Keogh, P Allen, P Stoker

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Private equity (PE) firms are comparatively free of mandatory requirements for the level an

    Mar 18, 2015

  • AUSIMM
    The critical role of mine planners in the evolution of closure at BHP

    By J Heyes, R Getty, M Sanapala

    Closure is an inevitable part of the life cycle of every mine. Successful closure outcomes critically depend upon early and ongoing integration of closure planning and mine planning. Early and holisti

    Sep 18, 2023

  • AUSIMM
    Lake Margaret Hydro-Electric Power Scheme, Mount Lyell, TAS

    THE exceptional rainfall characteristic of the West Coast of Tasmania, in conjunction with the rugged topography of the district, has always suggested the utilization of water-power, and from the earl

    Jan 1, 1915