Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Operational Excellence in Rock Blasting - From a European Point of View

    By R Lurf, C Weber

    In the frame of this paper a holistic dynamic process model approach is presented in order to introduce operational and technical excellence in drilling and blasting. Both on a macro and micro level t

    Jan 1, 2007

  • AUSIMM
    Titanium Feedstocks – Opaque Quality Requirements

    By D McCoy

    Titanium feedstocks are the building blocks of the titanium value chain. They can be mined directly, as is the case for ilmenite, leucoxene and rutile, or manufactured from ilmenite by extracting vari

    Oct 5, 2011

  • AUSIMM
    The Effect of Stress Damage on Dilution in Narrow Vein Mines

    By J Slade, R Trueman

    Unplanned dilution has the potential to seriously undermine the economic viability of a mine, and in some cases results in mine closure. The effect of stress damage on dilution has become increasingly

    Jan 1, 2005

  • AUSIMM
    Building and Maintaining Effective Project Teams

    By J A. Wells, K G. Thomas, R F. Dewhirst

    "One of the contributing factors to the extreme cost escalation in the first decade of the 21st century was the increase in the amount and cost of engineering work that went into studies and projects.

    Mar 8, 2016

  • AUSIMM
    Creating Wealth Through Minerals Processing - The Path to Recovery

    The sharp deterioration in Au~tralia'S ternn of trade in recent years and the accumulating national debt highlight the need for a restructuring of the economy which is highly dependent upon pr

    Jan 1, 1988

  • AUSIMM
    Mining Through Underground Workings in Fimiston Open Pit Kalgoorlie Consolidated Gold Mines (KCGM)

    By T Jones, K Karunaratna

    The Kalgoorlie Consolidated Gold Mines (KCGM) Fimiston Open Pit is located on the eastern boundary of the Kalgoorlie-Boulder City and is mining an area traditionally known as the Golden Mile. The pit

    Jan 1, 2003

  • AUSIMM
    Derivation of a Backfilling Strategy for Tabular, Deep, Scattered Mining on Vaal Reefs

    By J J. Laas, A J. S Spearing

    Considering the capital outlay, running costs and inherent difficulties of backfilling operations at depth the benefits need to be clearly established, quantified and then exploited. Expansion of Vaal

    Jan 1, 1998

  • AUSIMM
    Use of Pre-injection and Spiling in Front of Hard Rock TBM Excavation

    Hard rock TBMs are very often open machine layouts, with just a part roof shield over the front of the machine. The whole system is designed for fast face advance and the economy of the project often

    Jan 1, 1999

  • AUSIMM
    Derivation of a Backfilling Strategy for Tabular, Deep, Scattered Mining on Vaal Reefs (Minefill '98)

    By Laas JJ, Spearing AJS

    Considering the capital outlay, running costs and inherent difficulties of backfilling operations at depth the benefits need to be clearly established, quantified and then exploited. Expansion of Va

    Jan 1, 1998

  • AUSIMM
    Optimisation of Overburden Blasting Mount Thorley Colliery

    By Mckenzie CK, Scott A

    The injection of coal as an auxiliary fuel in ironmaking blast furnaces has been introduced on many furnaces worldwide. This paper examines the present practice of coal injection and discusses fut

    Jan 1, 1987

  • AUSIMM
    North Mine - A Case Study

    By Terlich R. E, Finlayson J. M

    A combination of high virgin rock temperatures, deep workings and extensive utilisation of heavy diesel equipment has presented North Mine (A Division of North Broken Hill Limited) with challenging

    Jan 1, 1988

  • AUSIMM
    The Cementation of Ag(I) Ions from Sodium Chloride Solutions onto Rotating Copper and Zinc Disks

    By Tran T

    The kinetics of cementation of silver chloro-complexes from sodium chloride solutions onto copper and zinc was studied using rotating disc electrode system. The activation energies were found to be

    Jan 1, 1992

  • AUSIMM
    Injection of Coal-Oil Mixture into Blast Furnace

    By Tamura S, Maekawa M, Nagai C, Deguchi M

    Heavy fuel oil has been injected into blast furnaces in order to reduce the coke rate, to improve productivity and to control the furnace heat condition. However, in the first oil crisis at the en

    Jan 1, 1981

  • AUSIMM
    Transition of the Ernest Henry Mine from Open Pit to an Underground Sublevel Cave

    By J B Tucker, A T. McGrath

    Situated in north-west Queensland, Australia, the Ernest Henry Mine (EHM) has been producing copper and gold since 1996. Owned and operated by Glencore Xstrata, ore is currently sourced from a newly d

    Mar 24, 2014

  • AUSIMM
    Shaft Guide Reactions at No. 2 Ore Shaft Mount Isa Mines Limited

    By Mercer J. K

    Shaft guide reaetions in No. 2 Ore Shaft, Mount Isa Mines Limited, have been reduced to a low order of magnitude by the use of self aligning slippers and spring loaded guide rollers. Before commission

    Jan 1, 1961

  • AUSIMM
    Improvements in Flotation Cell Operation and Maintenance at Newcrest Cadia Valley Operations

    Many parameters are important when considering the performance of a concentrator. These include metallurgical performance, such as throughput, metal recovery and final concentrate grade and operating

    Jan 1, 2009

  • AUSIMM
    The critical pool levels for the Yallourn Mine determined using the MGRI approach

    By N Patel, S Narendranathan, T Mok, J Lowe

    The Hazelwood Mine (HM) commenced operations in the 1950s and was originally operated by the State Electricity Commission of Victoria (SECV) prior to it becoming privatised. ENGIE, the current owners

    Aug 2, 2023

  • AUSIMM
    Sludge Conditioning Technology to Reduce Sludge and the Cost of Acid Mine Drainage Treatment

    By K Banerjee, C Dube

    Veolia Water Technologies was contracted by a global coal mining company to design a retrofit acid mine drainage treatment facility using DenseSludge™ technology on a former coal refuse disposal site.

    Jul 27, 2015

  • AUSIMM
    The design and implementation of the Kibali gold mine off-shaft development

    By T Peters

    The Kibali Gold Mine is currently comprised of several open pits, a 3.5 Mtpa underground mine and a 7.5 Mtpa processing plant. Development of the underground operation commenced in December 2012, with

    Mar 29, 2023

  • AUSIMM
    Gold and Silver Recovery from Waihi Ore, New Zealand

    By Quast K. B

    The ore used in this test program was a composite sample from Waihi, New Zealand containing 2.7 g/t gold and 36 g/t silver. From the testwork it was found that a high concentration of sodium cyanide

    Jan 1, 1991