Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
How the Global Experience and Reach of Tunnelling’s True Multinationals Helped Solve a Road Tunnel Fit-out ChallengeBy S Strong, L I. Sanz Vivanco, T Brown
One of the most significant technical and practical challenges facing the tunnel construction team on the Legacy Way road tunnel project in Brisbane, Australia was how to erect the prestressed precast
Sep 17, 2014
-
A Review of ISO 5802:2001 Industrial Fans - Performance Testing In SituBy K J. Lownie, T Rafferty
The in situ testing of mine ventilation fan systems has been a contentious issue for many years. Site testing was generally undertaken by adapting standards that were developed for the laboratory test
Jul 1, 2013
-
Optimising Project Value and RobustnessBy W Stange, N Hanson
An important aspect of the project evaluation process is the achievement of a clear and quantitative understanding of the primary drivers influencing project value and risk. A business scenario-based
Jan 1, 2007
-
A risk-based approach to drainage design standard selection for mine rehabilitation and relinquishmentBy A Densten, C Gimber
Surface water management and drainage is a key aspect of mine rehabilitation and closure planning. In the authors’ experience, drainage related problems are amongst the most common forms of failure in
Jul 25, 2018
-
Winning the Safety BattleBy S Hanrahan, S McLaughlin
A case study is presented that details the safety journey at a North American project involving two major contracts: a 1000 m shaft recovery and rehabilitation, and the development of a drainage galle
Jun 22, 2016
-
Guidelines for Economic Evaluation of ProjectsBy P Card
“Let’s get discipline and quality into easy to understand evaluations!” Project Managers and MetPlant Operators accept poor quality evaluations because they are generally unaware of what they should
Aug 8, 2011
-
Reverse circulation drill commissioning at Lihir open pit to provide data for medium term planningBy M Akop, G Phillips, L Elliott
An estimation geologist has many tools in their kit and using the correct one for the job is vital for creating a useful model. Reconciliation is a key step to monitor the performance of a resource mo
Mar 22, 2022
-
Accurately defining failure geometries and their variabilityBy E J. Hancock, K H. B Chu
Failures within hard rock underground excavations have historically been defined by a depth of failure, estimated in the field or through individual measurements, with a simplified failure geometry; s
Nov 29, 2022
-
Aluminium ExtractionThe Hall-Hoult process is likely to be the dominant method of aluminium production for the remainder of the century. The characteristics of the operation of a modern smelter are described and attentio
Jan 1, 1985
-
Identify, Convert and Sustain – Resource Development in the Pilbara – The Rio Tinto WayBy G Danckert
The key technical theme of ‘orebody knowledge’ has been applied by Rio Tinto in the Pilbara iron ore precinct from 1966, when operations first started there. It forms the basis of present day applicat
Jul 11, 2011
-
Development and Implementation of the CaveCAD Ground Support Module for Cost and Safety Improvements in Block Cave MinesBy S Talu, E Savage, P Sturm, A van As
It is estimated that substandard ground support installations and elements cost the Rio Tinto Copper Group millions of dollars between 2000 and 2014. These issues have also created significant safety
May 9, 2016
-
Characterising the Spontaneous Combustion Propensity of Waste RockBy J Theiler, B Beamish
The presence of reactive metal sulfide minerals in waste rock contributes to the hazard of spontaneous combustion in dumps, as these minerals react with air and water entering the dump at ambient temp
Jun 28, 2016
-
The Influence of Geology on Blasting Hazards and ResultsBy T N. Little
The aim of any rock breaking activity is to achieve success by developing designs that are blasting objective-specific and geology-specific, and then implementing such designs. This paper targets mini
Aug 22, 2011
-
Coal - Paper No. 12 Coking With A Seven Cubic Foot Capacity Coke OvenA new test coke oven of seven cubic foot capacity is described. The oven was designed to simulate conditions in a central section of a battery oven and a special feature is the achievement of unidi
Jan 1, 1969
-
The Use of Models in Solving Support Questions in Pillar ExtractionPhysical model testing at Bergbauforschung is done in two rigs, a roadway rig and a longwall rig. The loading of such models, in scale relation to the con- ditions in the collieries provides valuable
Jan 1, 1974
-
Paper No. 158. Presidential Address. Ore Treatment at The Broken Hill Proprietary Mine.The treatment of the Broken Hill ores has,undergone many changes during the last ten years, and it may be of interest to some of the members to know what are the main lines on which the Proprietary Mi
Jan 1, 1907
-
The Mineral Industry's Responsibility to the Environment - Acceptance and PerformanceFor some time the-mining industry has been criticised, completely unjustifiably, by certain people who style themselves conservationists but are actually preservationists. The criticism of the minin
Jan 1, 1971
-
Kelian Case StudyBy Barlow S
The Kelian Gold mine project won two excellence awards from the Victorian Division of the Institution of Engineers, Australia. It was a challenging project, fast tracked in a remote and inhospitabl
Jan 1, 1997
-
Costerfield – a Narrow Vein Case StudyBy M McCarthy
Over the last six years Mandalay Resources has increased production rates and improved safety outcomes at its Costerfield mine in Victoria, Australia. This mine is an underground operation utilising n
Jun 22, 2016
-
The Emperor Epithermal Gold Deposit, Vatukoula, FijiBy Setterfield TN, Jones GFP, Tua P, Davis B, Antonio M
The Emperor gold deposit occurs on the western margin of a 5 Ma caldera in a large, mafic shoshonitic shield volcano on the island of Viti Levu, Fiji. Products from two major pulses of post-calder
Jan 1, 1987