Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Regional Geology and Tectonic Evolution of Alaska and Adjacent Parts of the Northeast Pacific Ocean MarginThe western Cordillera of North America, including more than 99% of Alaska, is made up of an agglomeration of litho-tectonic terranes, some of which have undergone large rotations and (or) translation
Jan 1, 1990
-
Flotation Cell DevelopmentBy G J JAMESON
The flotation cell has undergone a number of changes since the process was first introduced in Broken Hill in the early years of this century. The development of the mechanical flotation cell is rev
Jan 1, 1992
-
Elevating geotechnical considerations in the Australian underground coal industry and mine planning processBy T Stambolie
Mine planning processes are continuously evolving, increasing in complexity, and are required to be developed in shorter timeframes, often missing important steps in the process. Underground coal mine
Nov 30, 2018
-
The Challenge of Waterproofing Cross Passages in Segmentally Lined Tunnel Boring Machine TunnelsBy E P. O’Dwyer
Segment and gasket lining in tunnel boring machine (TBM) tunnels; and sheet membrane lining systems in driven tunnels are robust waterproofing systems each with a proven history of performance in Aust
Sep 17, 2014
-
Mine Road Design and Management in Autonomous Hauling Operations – A Research RoadmapBy R J. Thompson
In truck-based hauling systems, the mine haul road network is a critical and vital component of the production process. As such, underperformance of a haul road will impact immediately on mine product
Nov 22, 2011
-
The Casposo Gold-Silver Project – Process Selection and DesignBy D Connelly
Silver and gold bearing ore from the Troy Resources NL Casposo Gold-Silver Project, located within the San Juan Province of Argentina contains a complex mix of gold, silver, electrum and silver sulphi
Aug 8, 2011
-
Operational Challenges and Lessons Learnt at Xinli Nonferrous Co Ltd’s Ilmenite SmelterBy H Weitz
Bateman Engineering provided process technology and engineering design to China Yunnan Metallurgical Company (CYMCO) for a 30 MW DC furnace for the production of high-grade titanium dioxide slag.Follo
Oct 5, 2011
-
A New Approach to Flexible Open Pit Optimisation and SchedulingBy A Galli
Traditionally pit optimisation and scheduling is carried out assuming that the resources, the commodity prices and production costs are all known. Once the pit contour and the mining schedule have bee
Sep 26, 2011
-
Gemstones in Australia - The State of PlayBy S R. Pecover
AustraliaÆs opal and sapphire mining industry has fallen from its peak in the 1980s and 1990s into a significant low today. This is not due to exhaustion of the resource, but instead an over-reliance
Jan 1, 2008
-
Evolution and technical considerations to manage tailings at the RPP- 140 mining title (Antioquia - Colombia)By García B., Wolff E.
In Colombia, northeast of Antioquia, there is a gold deposit that has produced continuously since the middle of the XIX century, located within mining title RPP-140, property of Gran Colombia Gold Seg
Jun 17, 2024
-
An Investigation of Current Flotation Survey SamplingBy D Laskovski, T Nguyen
Flotation surveying can be an extremely powerful means of determining opportunities for circuit optimisation and benchmarking. The type of survey employed depends heavily on the nature of the informat
Jul 29, 2014
-
Brisbane Airport Link Earth Pressure Balance Machine Two Component Tailskin Grouting – A New Australian RecordBy A Reschke
The Thiess John Holland Group is undertaking the design and construction of Brisbane’s Airport Link Project, the largest single investment in transportation infrastructure in Australian history. Twin
Mar 8, 2011
-
Four-Pass Loading ù Must-Have or Myth?It is hypothesised that increasing the number of loading passes will produce a reduced range of truck payload outcomes compared with four-pass loading. The paper provides analysis to support this hypo
Jan 1, 2003
-
Laboratory Flash Flotation Trends for a Variety of Gold ParticlesBy T D. H McGrath, J P. Vaughan, J Heath, J J. Eksteen
A reliable laboratory method to characterise the response of free gold particles when subjected to flash flotation conditions has been developed by AMIRA P420 researchers at Curtin University. This te
Sep 26, 2013
-
Razorback Iron Ore Project – A New Iron District to Meet the Growing Demand of an Iron Hungry WorldBy M Flis
The Razorback Iron Ore Project is a high tonnage, low-grade magnetite deposit that defines a new iron ore district in South Australia. Known since the 1960s, the deposit has come into its own as the i
Jul 11, 2011
-
Kelsey Centrifugal Jig Implementation at Namakwa Sands for Zircon Recovery from Quartz RejectsBy P V. A van der Westhuyzen
Namakwa Sands is a heavy minerals mining and beneficiation business in the Exxaro Sands Division, and operates along the West Coast of South Africa (see Figure 1). The business encompasses mining, min
Oct 5, 2011
-
Thermal Modelling and Mitigation Measures for the Bogong Power DevelopmentBy D Wimpenny
The Bogong Power Development Project in Victoria, Australia involved the construction of a 15 m long mass concrete plug up to 9 m in diameter within the head race tunnel. The plug is critical to thepe
Mar 8, 2011
-
Mine Waste Cover System Design ù Linking Predicted Performance to Groundwater and Surface Water ImpactsBy C Wels
Current best management practice requires the placement of a cover onto most types of mine waste including tailings, waste rock and/or spent heap leach rock at closure of the mine. The objectives of a
Jan 1, 2003
-
Design of Copper-Cobalt Hydrometallurgical CircuitsCopper-Cobalt hydrometallurgy has seen a resurgence in recent years with the development of projects in Zambia and the DRC. Many of the flow sheets are unique in their use of hydrometallurgical techni
Jan 1, 2008
-
Precision Analysis of Iron Ore Sampling, Preparation and Measurement -Overcoming Deficiencies in the Current Standard ISO 3085At Cliffs Natural Resources Ltd (CNR) crushing and shipping sample stations, precisions are estimated for the sampling, preparation and measurement stages of iron ore sampling in accordance with ISO 3
Mar 1, 2010