    Starting the Journey – Launching of the Legacy Way Open Face Tunnel Boring Machines in Mixed Face Ground Conditions

    By M Norbert, D O’Connor

    The mainline running tunnels for Legacy Way comprise two tunnel boring machine (TBM) driven tunnels. Both TBM drives commenced at the Launch Portal adjacent the Mt Coot-tha Road. Excessive surface set

    Sep 17, 2014

  • AUSIMM
    A new sampler for grain and other free-flowing particulates

    By G J. Lyman

    Sampling of grain for mycotoxins is challenging in that some mycotoxins, such as Ochratoxin A (OTA), have very low permitted levels and the kernels carrying the mycotoxin may be highly localised withi

    May 9, 2017

  • AUSIMM
    Uncertainty - An Important Source of (Additional) Value for Mine Projects

    By S Watson, L Martinez

    Mine projects are complex opportunities that demand a constant assessment of uncertainty, ie risk and upside potential. This is because the value of a mine project is typically influenced by many unde

    May 24, 2012

  • AUSIMM
    Shifting the comminution workload from the primary ball mill to TowerMill circuit

    By H Ishikawa, R Halomoan, S Palaniandy

    The Karara iron ore project is a magnetite operation consist of open pit mining and concentrator to produce high-grade magnetite concentrate. The concentrator has adopted three stages of comminution,

    Aug 29, 2018

  • AUSIMM
    Go with the flow – managing hydrogeological staff turnover at Ernest Henry mine

    By C Hawtin, B Miller, D Ashton

    Ernest Henry mine (EHM) is an Iron oxide copper-gold sublevel cave mine located 30 minutes north of Cloncurry in North-West Queensland. The underground mine lies beneath open pit excavations, which we

    Sep 20, 2017

  • AUSIMM
    Sublevel Cave Drop Down Strategy at Perseverance Mine, Leinster Nickel Operations

    By P A. Jenkins, I W. O Jones

    WMC has mined the Perseverance disseminated orebody exclusively by SLC (sublevel cave) methods. Deteriorating ground conditions in the vicinity of an orebody inflection forced a re-evaluation of futur

    Jan 1, 2000

  • AUSIMM
    Benchmarking Energy Efficiency ù A Case Study at Macraes Gold Mine

    By K Osten, N Scagliotta, G Lane

    Oceana Gold (New Zealand) Limited operates the Macraes Gold Mine near Dunedin on the South Island of New Zealand. The orebody is mineralogically complex and comparatively low grade requiring a series

    Jan 1, 2004

  • AUSIMM
    Methods for Evaluating Explosion Resistant Ventilation Structures

    By E S. Weiss, S P. Harteis

    The Pittsburgh Research Laboratory (PRL) of the National Institute for Occupational Safety and Health (NIOSH) has conducted full-scale explosion experiments, to evaluate the strength characteristics o

    Jan 1, 2005

  • AUSIMM
    Bauxite Mining Environmental Management and Rehabilitation Practices in Western Australia

    By Ward S. C, Gardner J. H

    In 1990, Alcoa of Australia Limited was elected to the Global 500 Roll of Honour of the United Nations Environment Program for the environmental management and rehabilitation of the bauxite mines i

    Jan 1, 1995

  • AUSIMM
    Risk Assessment Models for Post-Mining Land Use

    By C Smith, R I. Maczkowiack, P D. Erskine

    Open cut coal-mining has been conducted in the Bowen Basin region of central Queensland for almost five decades, and has disturbed an estimated area of 140 000 ha of agricultural land until 2011. Appr

    Jul 10, 2012

  • AUSIMM
    Effect of Carbon Type on Adsorption of Cu, Zn, Ag and Au from Mixed Cyanide Solution

    By S Lakemond, L I. Ku, J Vaughan

    Conventional processing of poly-metallic gold containing flotation concentrates are challenging for a number of reasons. One reason is that substantial copper and zinc in the cyanide leach solution co

    Sep 26, 2013

  • AUSIMM
    Long-Term Scheduling

    This paper describes modern long-term mine scheduling and gives an example of its application. It then discusses the obstacles to the implementation of such schedules.

    Sep 26, 2011

  • AUSIMM
    Automated joint mapping using the concentric shells algorithm

    By P Valenzuela

    Joint mapping is a fundamental input for rock mass characterisation and slope stability analysis. The usual way to do it is using a compass in the field or digitising structures on a screen, with a so

    Sep 20, 2017

  • AUSIMM
    Mineral Resource Policy Issues for Sustainable Development: Corporate and National Imperatives (e3355e4c-7484-44c3-ab2f-95b2e231f322)

    Constraints on the mineral industry are best treated as issues that have to be understood and managed in partnership rather than in conflict with communities. The Zapopan development at Mt Todd in

    Jan 1, 1995

  • AUSIMM
    Wall Control Blasting

    By D P. Blair

    There are two major aspects to wall control blasting – the potential for any blasthole to cause wall damage and the potential for a delayed sequence of blastholes to cause damage. The damage potential

    Aug 24, 2015

  • AUSIMM
    Exploration and Mining Unified through Seismic Imaging

    By J Dwyer, G Turner, D Pridmore, M Urosevic

    Due to their ability to produce high-resolution images of the subsurface to great depths, seismic surveys provide critical inputs to almost all oil and gas exploration projects. However, with some not

    Nov 4, 2015

  • AUSIMM
    Wetting and drying cycles as a means to determine the effect and consequences of tailings ageing

    By T Baumgartl, R Akesseh, M Edraki, B Usher, M Shaygan

    With the continuing demand for industrialisation and urbanisation, the rate of mining and processing lower grade ores will also increase, producing large quantities of waste. As extreme weather events

    Jul 25, 2018

  • AUSIMM
    Management of Change ù The Transformation of UK Coal Project 105

    In the UK during the 1990s the energy companies had developed a policy of æDash for GasÆ, building large natural gas power stations to produce more than 30 per cent of the UKÆs electricity demand. The

    Jan 1, 2005

  • AUSIMM
    Tubular Drainage and Lining Geocomposite for Mine Tailings and Heap Leach Pads

    By Y Durkheim, P Saunier, L Ameglio

    "In the last decade Afitex developed the Draintube™ geocomposite, which provides simultaneous drainage and waterproofing functions. This new type of drain tubes planar geocomposites (DTPG) differs fro

    Jul 27, 2015

  • AUSIMM
    Operational Assessment of Underground Conveying Systems

    Simple parameters, capable of easy observation on-site under operating conditions without interruption to production, are outlined for the operational assessment of underground conveyor systems. R

    Jan 1, 1982