Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Rock Pressure Control in Development of Heading FaceThe problem of stability of the development working at the great depths of coal winning is of great seriousness. Numerous researches of the problem were carried out in the USSR, the results of which d
Jan 1, 1991
-
Telfer Processing Plant Upgrade - The Implementation of Additional Cleaning Capacity and the Regrinding of Copper and Pyrite ConcentratesBy D R. Seaman, B Adamson, F Burns, B A. Seaman, P Manton
The Telfer concentrator, located in the Great Sandy Desert of Western Australia, consists of a dual train gold/copper operation processing ore from one underground and, currently, two open pit mines w
Oct 29, 2012
-
Discovery, Geology and Development of the Tom's Gully Gold Mine, Northern Territory, AustraliaThe Tom's Gully gold mine is located 90km ESE from Darwin, in the Northern Territory of Australia. The orebody is the auriferous portion of a large sulphide rich quartz reef, hosted in the Wildma
Jan 1, 1990
-
A Collaborative Approach to Iron Ore Beneficiation at Assmang Khumani Processing PlantBy S Döpp
Commencing with early experiences in iron ore beneficiation made at Beeshoek Mine, the paper follows through the process of extensive mineralogical and metallurgical investigations carried out during
Jul 11, 2011
-
Newmont Waihi Operations ù An OverviewThe Newmont Waihi Operations are centred on the Martha mine at Waihi, New Zealand. The mine has produced over 6.6 million ounces of gold from both openpit and underground sources since operations bega
Jan 1, 2002
-
Open Cut Mining Adjacent to Ephemeral Creek and Spring Systems ù Pilbara, Western AustraliaThe Pilbara region, located in the north-west of Western Australia, is significant as the second-largest source of iron ore on the planet. Iron ore mines owned and operated by Pilbara Iron are located
Jan 1, 2006
-
Fluorine Removal From Ok Tedi Copper/Gold ConcentratesBy J W. Glatthaar, M Mavotoi
The occurrence of fluorine in the copper/gold concentrates produced by Ok Tedi Mining Limited has provided a series of challenges to metallurgists since 1988. Although fluorine is distributed througho
Jan 1, 2003
-
Drift and Fill - The High Value, High Recovery Mining SystemBy M English, M Yumlu
At times of high metal prices, mining projects that have previously been put into the ætoo hard basketÆ are now being more closely examined. Typically these projects include the potential recovery of
Jan 1, 2008
-
The Bottle Creek Au/Ag Deposit Ore Resource Calculation ProceduresBy Moeller T
The Bottle Creek mine, when opened next month, will consist of three open cuts, Emu, VB and Boags, feeding ore to a central mill. The open cuts cover a strike length of 4.5 kilometres which forms pa
Jan 1, 1987
-
Gold Room Procedure at Lake View and Star, Ltd.Recovery of gold by smelting zinc dust concentrate has been carried on at Lake View and Star, Ltd., since July, 1930, when the Merrill-Crowe precipitation plant was first put into operation.Part I des
Jan 1, 1948
-
Assessment of Environmental Quality Impacts Caused by Red Mud Storage Facilities in ChinaBy S Zheng, Y Zhang, Z Wen, S Ma
Red mud (RM) is a solid waste product generated during alumina refinery process, and is usually stored in SFs (SFs) because it canÆt be disposed of easily. In this paper, environment degradation cause
Jul 10, 2012
-
Oxygenation System Upgrades and Leach Plant Performance Improvements at Morila Gold Mine - 2009 to 2012By D M. Verster, P L. Gillot, A Kone
Randgold ResourcesÆ MorilaÆs gold leach plant is subjected to uncommon æoxygen stressesÆ. Feed ores exhibit very high oxygen demands, primarily caused by iron sulfides. In addition, ore oxygen demand
Sep 26, 2013
-
Evaluation of Grouted Thread Bar Bolt Performance by Means of Pull Out Test in Deep Ore Zone Mine PT Freeport IndonesiaBy L Rachmad
Freeport IndonesiaÆs Deep Ore Zone (DOZ) mine is the new underground block caving mine within the East Ertsberg Skarn System (EESS) deposit which started production in mid-2000. The DOZ will produce 2
Jan 1, 2002
-
A Simple and Proven Technology for Reclaiming Acidic Mine WatersBy B Mack
The cost of water treatment is now more than ever a major consideration for maintaining an environmentally and economically sustainable mining operation. As an industry, we often have to consider wate
Jan 1, 2009
-
Magnesium Sulfate Production ù First Value Added Salt From Saline Waters of the Murray Basin (Australia)By T Barto, D Thomson, T Norgate, C Doblin
Collaboration between CSIRO Minerals and SunSalt Pty Ltd, a salt producing company located in rural Victoria, has resulted in a commercial process to recover magnesium sulfate (commonly called Epsom s
Jan 1, 2004
-
Didipio - Learning the Lessons, Adapting and Getting Ready for ProductionBy R Redden
"The Didipio Gold-Copper project in the Philippines has been a well-defined reasonably high gold grade porphyry for almost two decades. OceanaGold are now bringing the project into production in late
May 24, 2012
-
The application of secondary crushing at the Jundee gold mineBy S Tyrrell, B Jackson, K Matson
Northern Star Resources Limited Jundee Gold Mine in Western Australia operates a comminution circuit that consists of a primary crusher, 3.85 MW semi-autogenous grinding (SAG) mill, 1.8 MW ball mill a
Aug 29, 2018
-
Modelling of Dry Magnetic Separator by Artificial Neural Network at Gol-e-Gohar Iron Ore MineBy B Yeganeh, A Sam, A Kohsari
The base of separation at Gol-e-Gohar iron ore plant (Sirjan in the south of Iran) is magnetic separation after milling. Magnetic separation in the plant is divided into two parts: dry magnetic separa
Jan 1, 2007
-
Metallurgical Improvements at KagaraÆs Mount Garnet Mine Through the Use of High Chrome Grinding MediaBy R Whittering, C Greet
High chrome grinding media has been used in the mining industry for quite some time, as it often proves economical on a wear basis. However, it is unusual for an operation to change to high chrome sol
Jan 1, 2006
-
Establishing the Design Parameters of a Control Blast for Long-term Stability of the Hang Wall at Rampura Agucha MineBy R Shrimali, P Rajmeny, L Shekhawat, A Joshi
Rampura Agucha open pit mine has successfully been excavated to a depth of 320 m, incorporating multistage working. The key to success is the implementation of presplitting as control blast measures a
Aug 24, 2015