Search Documents
Search Again
Search Again
Refine Search
Refine Search
- 
                    
                Improvement of blast efficiency at Rio Tinto Borates and Lithium Mine in California, USABy J Furtney, W Fu, D Nutakor, A Brose
Rock blasting outcomes are often a shared responsibility of both the mine operations group and the mine geotechnical group. From an operational logistics and planning perspective, blasting concerns in
Jun 22, 2022
 - 
                    
                Getting it right from the beginning – ESG in mineral explorationBy L H. G McClean
Environmental, social and governance (ESG) factors have always been important to the minerals industry and is now considered one of our most important opportunities (and risks). Getting it right from
Sep 1, 2024
 - 
                    
                Project Selection and Process Development for Mining JuniorsBy L Lorenzen, H Muller
"Every year a large number of projects are evaluated by small listed and unlisted mining companies that are hoping to find the ideal project, which will catapult them from a mining junior status to th
May 24, 2012
 - 
                    
                Reducing ventilation change downtime and increasing operational uptimeBy J A. Rowland
When executing a ventilation change the mine ventilation circuit is in a state of flux throughout the entire change period with discrete mine areas both under ventilated and/or over ventilated during
Oct 12, 2022
 - 
                    
                Is Perception Reality? Evaluating the Fiscal Attractiveness of International Jurisdictions for Gold Mining InvestmentBy J P. Sykes, C Gemell, A Trench
The perceived and actual impact of government mineral policy upon the government share from gold mining revenues is assessed for ten key countries in which the gold sector is of relevance in advancing
Jun 22, 2016
 - 
                    
                Mine reconciliation standardisation – R Factor SeriesBy R Hargreaves, T Elkington, W J. Shaw, G W. Booth
Every day, around the world, thousands of tons of ore are loaded onto ships completing the miningproduction process and starting a multimillion-dollar economic transactions process. These transactions
Mar 22, 2022
 - 
                    
                Extending mine life through application of an in situ recovery approachBy D J. Robinson, L L. Kuhar
In-situ recovery (ISR) is accepted and applied across many geographies, and approximately 50% of the world’s uranium is currently extracted by using an ISR method (World Nuclear Association, 2014). T
Jul 25, 2018
 - 
                    
                KEYNOTE: Using Metallurgical Data to Drive Continuous ImprovementBy R Dunne
"Continuous improvement on metallurgical treatment plants is possible only when good data and analysis of the data are available. Good data implies appropriate and accurate mass measurement coupled wi
Oct 10, 2016
 - 
                    
                Professional Development for Metallurgists – Improving Technical SkillsBy D Drinkwater
In 2009, Peter Munro and Peter Tilyard examined the “human capital” in the mineral processing sector in a paper entitled Back to the Future (Munro and Tilyard, 2009). One of their major concerns was
Aug 8, 2011
 - 
                    
                Integrated Communications for Surface and Open Pit ApplicationsBy G Booth
Whilst communications systems in the mining industry have evolved over the years, the premise remains consistent that reliable communication is vital for safety and operational efficiency. TodayÆs ope
Jan 1, 2008
 - 
                    
                Social Licence to Close?By J A. Braithwaite
Social licence to operate is not a new concept for the mining industry, referring to stakeholder approval or acceptance for the activities and impacts of a project, company or industry. It is intangib
Jun 28, 2016
 - 
                    
                An assessment of battery trolley systems’ performance in surface minesBy H Bao, M Nehring, M Kizil, P Knights
The mining sector, a notably energy-intensive industry worldwide, is a major consumer of fossil fuels, leading to significant carbon emissions globally. The move towards electrification, coupled with
Sep 1, 2024
 - 
                    
                Dynamic influences of optimisation on emissionsBy P J. Bangerter, J Pan
Optimising for Net Present Value (NPV) with a strategic optimiser such as COMET, Prober-E, Blaser or Minemax has hitherto lacked a dynamic method for analysing the so-called third-order outcomes (such
Aug 2, 2023
 - 
                    
                Longwall Production - Review of Scheduling Factors and Overall Effects of Some Natural HazardsThe results expected from a longwall face can best be estimated from the ideal production rate, determined by the capacity of the equipment and the conditions in which it is installed, the effective o
Jan 1, 1991
 - 
                    
                Northside Storage Tunnel ProjectBy R J. Cuttler
In January 1998 Sydney Water Corporation formed an Alliance with construction contractor Transfield, and engineering consultants Connell Wagner and Montgomery Watson, to design and construct the North
Jan 1, 1999
 - 
                    
                Virtual Hailage Trucks: Improving the Safety of Surface MinesBy Denby B, Hollands R. Schofield D
Surface mines are in operation worldwide, the vast majority employ large haul trucks for the transfer of material both to the outside world and around the site. The sheer size of these trucks and th
Jan 1, 1998
 - 
                    
                Stockman Base Metals Project – Sustainability, Social Licence to Operate and Permitting Lessons LearntBy R Jacobs, J Yeates
"The Stockman base metals project is situated in State Forest in the alpine area of East Gippsland, Victoria, adjacent to a National Park and within the headwaters of a major Ramsar-listed wetland cat
Mar 8, 2016
 - 
                    
                The Role of Benchmarking and Independent ReviewsBy D Hunter, N Cusworth, J Miller
"Recent project failures have called into question the use and relevance of benchmarking and independent reviews, forcing a rethink of traditional processes and procedures.With cost estimates and sche
Mar 8, 2016
 - 
                    
                Selection Criteria for Open Pit Production Equipment û Payload Distributions and the æ10/10/20Æ PolicyBy R J. Hardy
The aim of this study is to examine the volumetric and mass movement characteristics of load and haul operations using statistical modelling of relatively large samples of bucket loads that are transp
Sep 26, 2011
 - 
                    
                New Continuous Production System in Block Cave Mining – the Rock Flow SystemBy M Frenzel
At the last MassMin Conference in Sudbury, Caterpillar’s vision of a continuous mining concept for block caving operations was presented on the background of global raw material demand and its continu
May 9, 2016