Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Bulk carrier vessel tracking automation – the Dalrymple Bay use caseBy W Russell, P Wighton, J Franke
Recent advances in ruggedised industrial control system technology and architecture in combination with latest technologies in the fast-evolving 3D LiDAR sensor sector becoming available have enabled
Nov 8, 2021
-
Managing Collaboration Effectively at NewcrestBy J Jones
A common problem in the mining industry is that company exploration groups operate in relative isolation to the rest of the company; resulting in poor knowledge transfer (Qureshi and Briggs, 2006
Aug 22, 2011
-
The Preparation of Pastefill and its Use at Some Canadian Mines (6e4bc1a5-4335-470a-b421-2dd830dbe3e2)Two key elements in the design of a pastefill or high density hackfill system are the preparation of the backfill material and its distribution underground. This paper examines these two areas. Owin
Jan 1, 1998
-
Effect of mud farming on the dewatering of bauxite residueBy D J. Williams, C Zhang, F E. Herrera Cabrera
Farming on bauxite residue using screw propelled equipment (SPE) has been commonly practised to accelerate dewatering and as it promotes consolidation and enhances storage capacity. However, it is unc
Jul 1, 2021
-
From Green Field Site to Block Cave Mine - Results of Northparke's Drill and Blast Design ProcessThe green field site is one that has no history of mining and as such it presents the designer with a blank canvas, on which any number of drill and blasting options can be drafted. No matter which mi
Jan 1, 1998
-
The Deep Parts of the Kiirunavaara Apatite-Magnetite Orebody in Kiruna, Northern Sweden and the Impact of Future Mining on the Township of KirunaThe Kiirunavaara apatite-magnetite orebody is about 4 km long and approximately 100 m thick sheet-like body, which lies roughly in a north-south direction and dips from the horizontal plane along its
Jan 1, 2006
-
Applying control frameworks to enhance vehicle interaction technology outcomesBy P Standish
Qualitative risk assessment methods are not well suited to considering complex systems and potential interactions of new technology. As part of supporting tier one mining organisations and internation
Jun 22, 2022
-
Benchmarking – Does it have a Role in Improving the Performance of Mining Geology?By M Berry
Many mining companies routinely use benchmarking to review their operational activities and associated costs. The aim is to measure operational performance against industry norms, and identify areas w
Aug 18, 2014
-
Incorporating Sustainability into Mining Plant and Infrastructure DesignBy A Murphy
Mining plants and infrastructure, and the decisions made by their designers, can have large impacts on their environmental and social context, commonly referred to as the site or plant footprint. They
Jul 16, 2014
-
Geology and Definition of the Wattle Dam Coarse Gold DepositThe Wattle Dam gold mine, located near Kambalda in the Goldfi elds region of Western Australia has recently progressed to an underground operation and is now believed to be Australia's highest gr
Aug 1, 2010
-
"Geometallurgy – Driving Innovation in the Mining Value Chain""Geometallurgy is a discipline that seeks to improve the sustainability of the extraction of metals and minerals by promoting the smarter use of non-renewable resources, better energy efficiency and g
Jun 15, 2016
-
Engineering and Science in Flotation Cell DesignBy J Euston
In the 1990s round flotation tanks were introduced as a result of the lower fabrication costs for larger cells. It was soon observed that round tanks held a number of further advantages over the tradi
Aug 8, 2011
-
Negatively Geared Ore Reserves – A Major Peril of the Break-even Cut-off Grade"Recognising that the mining industry is wedded to the break-even cut-off grade rather than a cut-off grade that optimises value, the author examines some perils and pitfalls in the use of break-even
Mar 8, 2016
-
Everyone Has a Plan Until They Get Punched in the Mouth – Creating Trust, Commitment and Results in Tough TimesBy P Moynagh
"A plan is critical but on its own it is a bit one dimensional, the three dimensions critical to success over the long-term, through changing economic, geological and management conditions are:the qua
Nov 15, 2016
-
A Further Study on the Attenuation Laws of Blasting Vibration FrequencyBy M Chen, G H. Wang, J R. Zhou, P Yan, W B. Lu
Blast vibration analysis is one of the important topics in the control technology of blast vibration damage. Nowadays, blasting vibration safety standards are based on both the particle velocity and t
Aug 24, 2015
-
A process-based approach to mine rehabilitation decision making using Bayesian modelling and risk-based principles for dispersive spoil rehabilitationBy E Thomas, L McCallum, G Dale, J Bennett, K Reardon-Smith, S Raine
Sustainable closure of coal mines in Australia to a safe, stable, non-polluting condition remains one of the industry’s biggest environmental and social challenges. A significant proportion of mines i
Jul 25, 2018
-
A Managed Approach to Project InsuranceHistorically the insurance industryÆs involvement in any project has been relatively late in the process. Often it was a case of the last item to be ticked off the checklist has been to ensure that th
Jan 1, 2007
-
Blast Monitoring and Blast Translation – Case Study of a Grade Improvement Project at the Fimiston Pit, Kalgoorlie, Western AustraliaBy M Fitzgerald
Fimiston Open Pit is operated by Kalgoorlie Consolidated Gold Mines (KCGM) as a joint venture between Barrick Gold and Newmont Mining. Over 110 years of underground mining resulted in the development
Aug 22, 2011
-
Influence of Cognitive Biases on Project EvaluationBy S Love, M Anderson, M Boland
"The high rate of failure of new mine developments to meet feasibility study expectations has been the subject of many fine technical papers. Yet failure rates remain stubbornly high.Similarly, the co
Mar 8, 2016
-
Bit to Bag - The Importance of a Total Coordinated System in Reverse Circulation DrillingBy M Goers, M Almond
"The use of reverse circulation (RC) drilling for grade control sample collection was selected by the Pueblo Viejo Mine Geology department at the recommencement of the operation in 2010. This method w
Aug 21, 2012