Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Understanding Rock Mass Behaviour through the Development of an Integrated Sensing Platform

    By E Widzyk-Capehart, C Hölck Teuber, S Steffen, V Rivero, O Fredes, E Sanchez, I Pedemonte, N Gonzalez

    This paper summarises the research, development and initial application of a sensing platform that has the potential to monitor subsurface deformations, pore pressure and other variables simultaneousl

    May 9, 2016

  • AUSIMM
    æShot to ShovelÆ ù Understanding the Impact of Muckpile Conditions and Operator Proficiency on Instantaneous Shovel Productivity

    By J Battista, J Grace, I Brunton

    The need to better understand and develop strategies to improve instantaneous shovel productivity at the Cadia Hill Open Pit Mine (CHM) instigated the development of the æShot to ShovelÆ project. This

    Jan 1, 2004

  • AUSIMM
    The Use of Glass-Fibre Reinforced Plastic on the Northern Sewerage Project Stage 1 – Design and Construction Considerations

    By S Goff

    The Northern Sewerage Project (NSP) is a $650 M infrastructure project that will increase the capacity of the sewerage system for Melbourne’s growing northern suburbs while also helping to protect the

    Mar 8, 2011

  • AUSIMM
    Monitoring Design and Data Management for a Multiwell CO2 Storage/Enhanced Coalbed Methane Test in a Stacked Coal Reservoir, Buchanan County, Virginia, USA

    By S J. Schafrik, C Keles, C Schlosser, E S. Gilliland, A K. Louk, N S. Ripepi, S Keim, J Amante, E Diminick

    Three legacy coalbed methane production wells have been converted to injection wells for a one-year carbon dioxide (CO2) injection test to evaluate the potential for CO2 storage in the coal reservoir

    Nov 4, 2015

  • AUSIMM
    Geomechanical Modelling of the Mount Isa Copper Deposit – Predicting Mineralisation

    By R O’Sullivan, D Taylor, J G. McLellan, B Miller

    The Mount Isa copper deposit is located adjacent to the city of Mount Isa, Queensland, and lies within a series of Palaeoproterozoic to Mesoproterozoic Superbasins. The deposit is hosted almost entire

    Aug 18, 2014

  • AUSIMM
    Cardox Blasting Trials at Waihi Gold Mining

    By A Van Kersen, J Hodson

    Waihi Gold Mining Co Ltd [WGM], operated by Normandy Mining, has been internationally recognised for its achievements in environmental management at the Martha Mine at Waihi. In a proactive approach t

    Jan 1, 2001

  • AUSIMM
    Going beyond design at Newmont Boddington Gold

    By K Blay, C McCamley, P Petrucci

    The Newmont Boddington Gold (NBG) processing plant was designed for 35Mt/y with ball mills expected to deliver a combined new mill feed rate of 4837 tonnes/hr. Since beginning commercial production in

    Aug 29, 2018

  • AUSIMM
    Anglo American Research LaboratoriesÆ (AARL) Experiences with Flotation Plant Modelling

    By V Ser, R Crosbie

    To date, Anglo American Research Laboratories (AARL) has carried out several projects, based on the techniques developed in AMIRA International LimitedÆs (the mineral industries research association)

    Jan 1, 2005

  • AUSIMM
    Managing the Giant – A Mine Geologist’s Perspective to the Mining of the Olympic Dam Deposit

    By M K. Kapo, S C. Nzama

    The success of a mining operation depends on the quality of data used in decision-making processes and the people involved in making operational decisions. At Olympic Dam, mine geologists form an inte

    Aug 18, 2014

  • AUSIMM
    On the development of a viscosity model for molten multicomponent slag systems with several glass-forming, amphoteric and modifier oxides

    By G M. Zhomin, A S. Arkhipin, A Kondratiev

    Viscosity of multicomponent slags is one of the crucial physicochemical properties for many industrial processes and technologies. While the viscosity-temperature relationship of completely molten sla

    Aug 21, 2024

  • AUSIMM
    Selection of an Optimum Truck and Shovel Fleet Based on Effective Flat Haul and Capacity Constraint Modelling

    By P Hagan, S Campbell

    A study was undertaken using various methodologies to determine the optimum loading and hauling configuration for different haul routes at Callide Mine, a coal mine located in central Queensland. The

    Sep 18, 2012

  • AUSIMM
    The Mine Management System at Olympic Dam Mine

    The operations management system at Olympic Dam has evolved over a two-year period to the state described in this paper. This evolution has been driven largely by the requirements of the recent expans

    Jan 1, 2000

  • AUSIMM
    Lighting up the dark – the use of 3D seismic to optimise mine plans at structurally complex Blackwater mine

    By N Pranoto, E Lawell, T Dean, M Grant

    The Goonyella Riverside Mine is located 30 km north of Moranbah in Central Queensland, Australia. Recent mining activities have exposed the north–south striking Kenya and Zimbabwe thrust Faults. These

    Mar 22, 2022

  • AUSIMM
    Post Closure Management of the Mt Leyshon Gold Mine - Water the Integrator

    By T Baumgartl, D Mulligan, R Haymont

    Mining at the Mt Leyshon Gold Mine in semi-arid north Queensland stopped in 2002. Newmont Australia has recently initiated a thorough post-closure water management study of the site by revisiting the

    Jan 1, 2006

  • AUSIMM
    Resue or Split Face Firing - Trial Results from Hillgrove Mine

    Resue or split face firing has the potential to separate ore and waste rock into separate muck piles within a stope. Thus split face firing has the potential to reduce dilution of the ore stream to be

    Aug 1, 2010

  • AUSIMM
    Application of normative ore mineralogy to geological and metallurgical data sets at the Hera Au-Pb-Zn-Ag mine, New South Wales, Australia

    By A R. McKinnon

    The recently opened Hera Au-Pb-Zn-Ag mine in central New South Wales has provided an ideal opportunity to demonstrate the calculation of sulfide ore mineralogy using normative methods. Normative miner

    Sep 20, 2017

  • AUSIMM
    Innovation in an Uncertain World

    As Pliny commented two millennia ago, The only certainty is that nothing is certain. Despite the many breakthroughs, advances and promises, the way we each live and work remains awash with technologic

    May 1, 2010

  • AUSIMM
    Telfer Project Process Plant Design

    By R Dunne, G Lane, S Ha, D Dreisinger

    The paper outlines the 17 Mt/a Telfer Project plant process design from sample selection to feasibility study design. The 366 Mt Telfer mine reserve consists of a diverse range of copper and gold mine

    Jan 1, 2003

  • AUSIMM
    Epithermal Mineralisation - New Zealand's Leadership

    In the last 40 years, New Zealand has developed a number of liquid- dominated geothermal steam fields, for electricity generation and indus- trial process steam. New technologies were developed, and i

    Jan 1, 1988

  • AUSIMM
    Development of the production optimiser through collaboration between Evolution Mining and Minnovare

    By C McCracken, R Landers, B Hesse

    Minnovare identified the potential to improve production drilling outcomes in underground long-hole stopes through the adaptation of new technology which was under ongoing development. An approach to

    Mar 15, 2021