Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Back to the Future - Why Change Doesn't Necessarily Mean Progress

    By P A. Tilyard

    There have been enormous changes in mineral processing in the past four decades. For example grinding mill power has increased by an order of magnitude, regrinding is done to -10 microns and flotation

    Jan 1, 2009

  • AUSIMM
    Cities as Mine Sites of the Future

    By M Warnken

    Major cities are not only the focal point for AustralianÆs work, leisure and homes, they also are the focal point for the flow of resources into the built environment, motor cars and transportation an

    Jan 1, 2006

  • AUSIMM
    Isasmelt and IsaMills ù Models of Successful R&D

    MIM Holdings Limited has acquired a reputation for the successful application of R&D to develop break-through technologies for the mining industry. The Isa Process tank-house technology has been licen

    Jan 1, 2002

  • AUSIMM
    Variability of Gravity Recoverable Gold Values in Relation to Test Sample Size

    By S C. Dominy

    The gravity recoverable gold (GRG) parameter reflects liberated gold or gold-dominated composite particles that can be recovered by gravity separation. Recoveries depend upon mineralogy, in situ parti

    Sep 29, 2013

  • AUSIMM
    Impartiality and Fairness in Stakeholder Engagement Through Triangular Value Analysis

    By J L. Stacey

    The diverse priorities, drivers and concerns of multiple stakeholders in the minerals industry complicate the integration of sustainable development considerations into mine design, as well as operati

    Jan 1, 2009

  • AUSIMM
    Metallurgical QA/QC – who needs it? The Olympic Dam experience

    By K Ehrig, V Liebezeit, E Macmillan

    The results from metallurgical test programs are used in feasibility studies for design of new plants and brownfield expansions, in long term mine plans, and to make decisions in an operating plant. T

    Sep 11, 2017

  • AUSIMM
    Iran Mining Industry Based on the 20-Year Perspective 2025

    By F Rashidinejad

    Iran has had an active mining sector for some 7000 years. Exceptional in terms of its mineral diversity, Iran produces 62 minerals, and is ranked among the world’s 15 most mineral-rich countries. Many

    Nov 22, 2011

  • AUSIMM
    Eco Underground Coal Mining Systems for Ultra-Thick Coal Seam – Utilisation of Flyash and CO2 Storage

    By A Hamanaka

    EGAT Mae Moh Lignite Mine in Thailand produces about 16 Mt of lignite annually from open-cut mining. The coal is used to generate 2400 MW of electricity. In the near future, however, the coal must be

    Nov 22, 2011

  • AUSIMM
    IsaMills™ at Kalgoorlie Consolidated Gold Mines – from the M3000 to the M10 000 and Replacement of the Roasters at Gidji Processing Plant

    By G S. Anderson, N W. McDonald

    "The IsaMill™ was originally developed to address liberation issues at Mount Isa Mines (now Glencore) operations, McArthur River and Mount Isa in the early 1990s. Following on from the industria

    Oct 10, 2016

  • AUSIMM
    High-pressure Fissure Grouting for Drill and Blast Tunnelling, Ambuklao, Philippines

    By C Harrison, A Bowskill

    The Ambuklao hydroelectric dam was originally constructed in the 1950s in the remote and mountainous region of the northern Philippines. Following its construction the dam has suffered heavily due to

    Sep 17, 2014

  • AUSIMM
    Vibration control blasting for low stability final walls

    By G Wyartt

    In the Pilbara region of Western Australia, an iron ore mine is undertaking a high wall cut-back to improve stability and allow access to deeper ore deposits. Several sections of the wall have been cl

    Nov 30, 2018

  • AUSIMM
    Unlocking Plant Capability through Targeted Debottlenecking of Arrium’s Magnetite Concentrator

    By C Jenkins, M Mativenga, C Stanton, J Gerber

    In 2014, Arrium completed an optimisation program on its magnetite concentrator, enabling a reduction in the overall cost base of producing concentrate through an increased ability to treat a wider ra

    Jul 13, 2015

  • AUSIMM
    Changing the Ground Support in Cemented Hydraulic Backfill at CSA Mine

    CSA mine, which is a deep level copper operation, located 12 km north of Cobar, NSW, currently uses a top down stoping method, utilising cemented hydraulic backfill (CHF) to fill and stabilise the sto

    Nov 25, 2010

  • AUSIMM
    Mineral Sands Resource Security – Underpinning Market Share in a Global Growth Context

    By R Kjar

    Globally, it is anticipated that the mineral sands industry will enter a period of short supply. Demand for both titanium dioxide and zircon is forecast to continue increasing, with new projects neede

    Oct 5, 2011

  • AUSIMM
    Assessing static liquefaction for upstream tailings dams

    By A Litwinowicz, M Laxman, A Fourie, A L. Li

    This paper presents a design approach and analytical methods that were used for assessing the potential of static liquefaction and developing the mitigation measures for a tailings dams. The rigour of

    Jul 1, 2021

  • AUSIMM
    Improving Drive Stability through Efficient Development Blasting Design and Practices

    By P Klaric

    Drive stability is critical in block/panel cave mining. The production levels of these mines are required to remain operational for the entire life-of-mine which can be in excess of 30 years. It is th

    Aug 24, 2015

  • AUSIMM
    Design considerations for an iron tailings filtration plant and their conveying and disposal systems

    By C Garrido, J Barrera, H Alvarez, L Perez, S Ramirez

    In recent years, there has had a greater recurrence of studies and projects that consider tailings filtration followed by dry stacking to reduce the consumption of fresh water, the space required for

    Nov 8, 2021

  • AUSIMM
    New Discrete Element Modelling Calibration Technology to Facilitate the Increased Efficiency of Ore Handling and Processing Operations

    By P W. Wypych, D Curry, A P. Grima

    The market has become highly competitive for engineering and equipment vendors, who are challenged to reduce costs while improving efficiency and productivity of mine operations through plant improvem

    Jul 13, 2015

  • AUSIMM
    Design and Construction Contract C916 Beauty World Station and Tunnels, Singapore

    By R McDonough

    DTL2 contract C916 was awarded in March 2009 for S$340 M. This contract includes two mass rapid transit (MRT) 1100?m long bored tunnels using two slurry tunnel boring machines (TBMs), with an internal

    Sep 17, 2014

  • AUSIMM
    Characterising Rock Mass Properties for Fragmentation Modelling

    By A Scott, I Onederra

    A great deal of technical and research effort has been applied to the development of models to predict fragmentation from rock blasting. A number of quite useful empirical or engineering models are cu

    Aug 24, 2015