Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Thalanga Massive Sulphide Deposit

    By Hartley JS, Wills KJA

    The Thalanga massive sulphide deposit is hosted by Upper Cambrian rhyolites and volcaniclastics of the Mt. Windsor Volcanics near their contact with overlying dacites, rhyolites and sediments of t

    Jan 1, 1987

  • AUSIMM
    Increased drilling accuracy leads to significant improvement in ore recovery and dilution

    By R Stimpson, B Johnson, B Hesse

    During a period of twelve months between FY18-19, a series of trials were conducted to compare production drilling accuracy using two different methodologies, and the subsequent impact this had on sto

    Mar 15, 2021

  • AUSIMM
    From Banded Iron Formation to Iron Ore – Genetic Models and Their Application in Iron Ore Exploration in the Hamersley Province, Western Australia

    By H J. Dalstra

    High-grade iron ore may be derived from banded iron formation (BIF) through four fundamentally different processes:1. syngenetic precipitation of chert free BIF,2. residual enrichment by removal of ga

    Jul 11, 2011

  • AUSIMM
    Mining in Fiji

    The nation of Fiji is located the South Pacific on the æRim of FireÆ some four hours flying time from the eastern sea board of Australia. It is a tourist destination situated on the main route from Au

    Jan 1, 2004

  • AUSIMM
    Innovation in mining – a contractor’s role

    By D Kilkenny

    Underground contractors in the mining industry must be prepared to take a position at the forefront of innovation of equipment and work methods in order to maintain a competitive advantage over in-hou

    Oct 16, 2017

  • AUSIMM
    Sustainability Reporting and Mining - An Assessment of the State of Play for Environmental Indicators

    The global mining industry is perceived to be a world leader in sustainability reporting û with a 2008 Ernst & Young survey placing four mining companies in their top five performers in sustainabi

    Jan 1, 2009

  • AUSIMM
    Treatment and Rehabilitation of Acidic Waste Rock and Tailings – A 14-year Case Study

    By D Blair, T Scutts, L Fergusson

    This paper presents a waste rock treatment and rehabilitation program conducted at a metaliferous mine site in northern New South Wales from 2000–2013. It updates findings from 2005 for Program #1 (wh

    Jul 16, 2014

  • AUSIMM
    High Resolution Soil Geochemistry for Gold Exploration at the Continental, Regional and Prospect Scale

    By P de Caritat, A Davidson, A Mann

    Top outlet sediments from the National Geochemical Survey of Australia have been extracted by a partial extraction method for over 50 elements including gold. The partial extraction results from this

    Sep 26, 2013

  • AUSIMM
    Gold-Silver Vein Mineralisation at Cononish, Scotland

    By I M. Platten, C J. S Sangster, Y Xie, S C. Dominy

    Cononish is a steep, narrow NE-SW trending vein system that was emplaced into late Proterozoic metasediments. It shows brittle style deformation and postdates metamorphism and associated Caledonian fo

    Sep 26, 2013

  • AUSIMM
    Particle Size Analysis – Optimising Returns in Iron Ore

    By B Stump

    Reliable particle size analysis in minerals processing plants is a critical factor to the economic return of a plant. As recovery of valuable minerals is compromised for particles outside the optimal

    Jul 11, 2011

  • AUSIMM
    Work-Life Balance and Atypical Working Hours: Does FIFO Pass the Epicurean Test for Happiness?

    When I was first asked to give a paper on work-life balance in the mining industry I was both excited and aware of the incongruity of my position. I have never worked in mining operations nor have I h

    Jan 1, 2005

  • AUSIMM
    Newmont Tanami Operations – Tailings Storage Facilities

    By S Thacker, M Noakes

    The Newmont Tanami Operations (NTO), formerly the Granites Gold Mine, commenced operation in the mid-1980s with tailings deposition evolving over the past three decades as production has increased and

    Jul 27, 2015

  • AUSIMM
    A More Holistic View of Mill Liner Management

    By N Weerasekara, M Bird, M Yahyaei, M M. Hilden, M S. Powell, J Franke, P Toor

    The combination of new tools with a more rigorous approach to understanding the interaction of mill liners with overall mill performance and economics, forms the basis of an integrated approach to lin

    Oct 29, 2012

  • AUSIMM
    The Application of Value Engineering Principles to Mining Studies

    By T Schrimpf, I Bryan

    The life cycle of a mining project begins with initial regional exploration and ends with mine closure and rehabilitation. Between resource definition and the commencement of mine construction is the

    May 24, 2012

  • AUSIMM
    Using Borehole Radar to Refine Orebody Interpretations in a Narrow Vein Gold Deposit

    By G Morgan, C Kemp

    In December 2010, a trial of borehole radar technology was conducted to test the usefulness of the technique in better refining the position and geometry of narrow vein orebodies away from the primary

    Mar 26, 2012

  • AUSIMM
    Analysis of dust behaviour in the face zone utilising- CFD modelling tools

    By O Joneydi, J Viljoen, R Funnell

    Computational Fluid Dynamics (CFD) modelling is a useful tool that can assist engineers in designing effective ventilation systems for the control of airborne dust generated during mining operations.

    Oct 12, 2022

  • AUSIMM
    Integrated Sustainable Water Management in Mining for Development in the Philippines

    By A N. Danoucaras, S E. Goater, D Hearne, A M. Bansuan

    It is globally recognised that existing and emerging mining activities should be conducted in a æsustainableÆ manner for the entire life of mine. Many companies annually publish corporate sustainabili

    Nov 20, 2012

  • AUSIMM
    In-Pit Crushing and Conveying

    By I Lourel

    In evaluating the installation of an in-pit crushing and conveying (IPCC) system for any mine, a number of options are available for each of the dig side, transport and dump side operations. Some of t

    Jan 1, 2009

  • AUSIMM
    Drilling Techniques for Resource Estimation of Mineral Sand Deposits

    By M Z. Abzalov

    Drilling mineral sand deposits has specific challenges, which are different from drilling hard rock deposits: Drilled sequences are represented by non-consolidated free-flowing sands to semi-conso

    Oct 5, 2011

  • AUSIMM
    Treatment Plant Innovation at Garden Well

    By W T. C Kendall, H D. Ngo

    Garden Well is a shear-hosted Archaean orogenic gold deposit located 100 km north of Laverton, Western Australia. The Garden Well processing plant is designed for a nominal 491 t/h milling rate and an

    Sep 26, 2013