Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Introducing and Sustaining a Continuous Improvement Program in Mines and Smelters

    By M Costa, L Polizzi

    Process optimisation and continuous improvement are usually acknowledged when making a process more effective, efficient and transparent. During the last few decades, thousands of companies around the

    Sep 1, 2014

  • AUSIMM
    The basics of grinding circuit optimisation

    By A Giblett, B Putland

    This paper provides a simple guiding framework for grinding circuit optimisation, focussing on common themes in past optimisation success stories, the conditions for success and techniques that can be

    Aug 29, 2018

  • AUSIMM
    The Dilemma of Gold Companies

    Thank you for your introduction and the opportunity to speak at such an important forum. I feel honoured to be the Tas McKee speaker for this yearÆs conference. I can honestly say that Tas McKee typif

    Jan 1, 2006

  • AUSIMM
    Production Drill and Blast Practices at Ridgeway Gold Mine

    Newcrest Mining Limited (NML) owns and manages the Ridgeway Gold Mine (RGM) located outside Orange in the state of New South Wales. RGM is a new underground sublevel caving (SLC) operation that is ram

    Jan 1, 2002

  • AUSIMM
    Use of a Modified Comminution Index to Predict Bond Work Index and SMC A*b at the Antamina Mine, Peru

    By T Kojovic, S J. Windle, J Sullivan

    "The Geometallurgical Mapping and Mine Modelling (GeM) comminution index (CI) was developed as part of the AMIRA P843 GeMIII project. Drill core geochemistry samples were passed through a Boyd Crusher

    Jun 15, 2016

  • AUSIMM
    Platinum Mining and Sustainability - Understanding the Environmental Costs of Future Technologies

    By G M. Mudd

    The growing popularity of platinum and platinum group metals (or PGMs, including palladium, rhodium and others) for a wide range of applications leads to some interesting issues for mining and sustain

    Jan 1, 2009

  • AUSIMM
    The Role of the Metallurgist in Project Development

    The role of a project metallurgist is diverse and covers input into the resource definition, mining studies, metallurgical test program development, process engineering and plant design, cost estimate

    Jan 1, 2008

  • AUSIMM
    Pre-concentration by screening – a cost-effective approach to testing and evaluation

    By N Clarke, A Barros

    Preconcentration of run-of-mine subgrade and marginal ore by screening has the potential to substantially improve the economics of mining, particularly for large, low-grade orebodies, and to reduce en

    Aug 24, 2022

  • AUSIMM
    Of Detritals, Derivatives and Determination ù An Example of Detrital Iron Discovery

    By P J. Hawke, M F. Flis

    The Hamersley Basin of Western Australia holds significant tonnages of detrital iron deposits. Formed by a cyclic weathering and eroding sequence of nominally barren banded iron formation, they may fo

    Jan 1, 2002

  • AUSIMM
    A global review of productivity and operational performance in sublevel caving mines

    By A D. Campbell

    The sublevel caving (SLC) mining method is becoming more widely adopted as an underground mining method as mines become deeper and target lower grade mineralisation. SLC has been successfully adopted

    Mar 29, 2023

  • AUSIMM
    The evolution of seismicity and ground control measures at Ernest Henry Mine

    By H Esterhuizen

    The Ernest Henry Mine (EHM) in Queensland, Australia is a Sub-level Caving operation that started production below the previously mined open pit at a depth of 535m. Current Production mining has progr

    Nov 30, 2018

  • AUSIMM
    Real-Time Risk Analysis and Hazard Management

    Safety remains a critical priority for the Australian mineral resource industry and will receive increased focus in the future. This is particularly evident in underground coal mines where reserves ar

    Jan 1, 2005

  • AUSIMM
    Financial Modelling with the Auditor in Mind

    By S G. Gemell

    "The financial model is an integral component of any project evaluation based on mineral resources, ore reserves and (at least internally) exploration targets. Given the unity of purpose for preparing

    Mar 8, 2016

  • AUSIMM
    Challenging Perceptions? Sustainability Reporting, the Media and Mining

    By P Clark, P A. Kirsch, R Tapia Rivera

    Community members’ sources of information about companies’ social investments are often influenced by the messages in a variety of communication channels, such as newspapers, television and social med

    Jul 16, 2014

  • AUSIMM
    A ‘no tailings dam future’ – preconcentration strategies ‘down the sizes and across the value chain’

    By P Revell, B Adair, D King, L Keeney

    Grade Engineering®, integrated across the mine value chain, has a pivotal role to play in achieving step change reductions in energy and water usage in mine operations. High levels of gangue rejection

    Nov 10, 2020

  • AUSIMM
    A Decade of Gravity Gold Recovery

    By A Bax, G Wardell-Johnson, W P. Staunton, J McGrath, J J. Eksteen

    Since 2001, the AMIRA P420 gold processing technology project series has been studying the recovery of gold using gravity devices, with particular emphasis on the centrifugal units, Knelson and Falcon

    Sep 26, 2013

  • AUSIMM
    Thirty years since Moura No.2 – so what has changed?

    By D I. Cliff

    The loss of 11 miners in the 7 August 1994 Moura No.2 Underground Mine Disaster was the catalyst for major change in the way safety was managed in the Australian Mining Industry. The impact was felt a

    Apr 16, 2024

  • AUSIMM
    The Integration of Geometallurgy with Plant Design

    By G Harbort

    Traditional engineering design for flotation circuits use the “Rule of Thumb” approach. Typically this uses a nominated maximum head grade for design. A scale-up factor is applied to laboratory flotat

    Aug 8, 2011

  • AUSIMM
    Queensland Mines Should Consider Climate Change Impacts for Decommissioning

    By M C. Evans

    "Mine decommissioning is the final phase in a mining project. Planning for decommissioning must commence for a proposed mine even before the government approves it. Queensland mining approvals require

    Jul 16, 2014

  • AUSIMM
    Zero Liquid Discharge in Coal Mining Operations

    By A Dal-Corobbo, R Zick

    The coal mining industry is now faced with new regulatory requirements that limit the discharge of chlorides into receiving streams. To meet these new regulatory standards for treated mine water, a ze

    Nov 26, 2013