Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Heat Load Estimation from Conveyor Systems in Mass Mines

    By R Moreby, J Kok, L van den Berg

    The high production rates achieved from mass mining methods such as block caving, sublevel caving and longwall mining require large conveyor belts, trucking loops (diesel/electrical) and rail systems

    Aug 31, 2015

  • AUSIMM
    Spatial distribution of geohazards in Western Australia and Imposed risks to tailings storage facility inventory

    By J Penman, N Turner, H Liu

    This paper aims to present a snapshot of the risk profile for tailings storage facilities within Western Australia by comparing the spatial distribution of known facilities against common geohazards s

    Jul 1, 2021

  • AUSIMM
    Laboratory Testing and Stability Analysis of Paste Backfill at the Golden Giant Mine (d53b2c09-d9ab-48b2-94c6-0c6f856d783f)

    By Bawden WF, Paynter JT

    This investigation involves laboratory testing and stability analysis of paste fill at the Golden Giant Mine. Site-cast samples are tested in unconfined, confined, and consolidated-undrained triaxia

    Jan 1, 1998

  • AUSIMM
    Recent advances in tailings testing methods

    By D J. Williams

    The majority of surface tailings storage facilities continue to employ sub-aerial tailings slurry deposition. Surface TSFs are typically sized and operated in a way to minimise the initial capital cos

    Jul 23, 2018

  • AUSIMM
    Operational readiness – what is it and how to get it done?

    By A G. L Pratt

    Operational readiness is a commonly used term in mining and many other industry settings. However, translating this term into a coherent scope of work that is practical and meaningful is a challenge f

    Mar 29, 2023

  • AUSIMM
    Controlled Potential Sulphidisation (CPS) Flotation Process

    Conventional treatment of oxide and oxidised sulphide minerals by flotation involves the use of sodium sulphide for sulphidisation. Sodium sulphide is generally applied in a "slug" dosing fashion

    Jan 1, 1989

  • AUSIMM
    An Application of Simultaneous Optimisation – Improving the Payback Period of a Zinc-Copper Open Cut Project

    By D J. Thobaven

    Project financing challenges caused by declining commodity prices have heightened the need to improve project metrics such as minimising capital payback and maximising net present value (NPV). Khnaigu

    Nov 24, 2014

  • AUSIMM
    Leading Practice Water Management at Moranbah North Underground Mine

    By D Yates, C C(te, M Rodgerson

    This paper describes how specific technical and regulatory issues related to water management have been dealt with at Anglo AmericanÆs Moranbah North mine. It compiles the collection of practices that

    Nov 26, 2013

  • AUSIMM
    Minimum Industry Gold Room Security

    Gold rooms represent a high security area and preventing theft is a challenging task. Where gravity concentrates or high value unit intermediate products are present, particular and specific security

    Aug 1, 2010

  • AUSIMM
    The Simple Facts about Sampling Gold Ores

    By T Day, I G. Robertson, G J. Lyman

    "Various approaches are used in the industry for establishing procedures (sample mass estimation and method of subsampling) for sampling and analysis of gold ores. The key factors that determine the a

    Oct 10, 2016

  • AUSIMM
    Changing Restoration Priorities in the 21st Century – Opportunities for Novel Ecosystem Design in Mine Closure

    By P Audet, D Doley

    The mining industry often embraces mine closure criteria that require the reinstatement of predisturbance or even presettlement (ie historic) ecosystems. However, the extent and severity of disturbanc

    Jul 16, 2014

  • AUSIMM
    Underground Mining Operations at The Selwyn Project

    Since the 1950's drilling has been rapidly mechanised. First from hand held drills with air legs to pneumatic jumbos, then to more effective hydraulic jumbos. Development of underground drill

    Jan 1, 1988

  • AUSIMM
    Catalysing lower-carbon mining supply in Australia

    By M Rea, E O’Connell

    Decarbonising explosives manufacturing and catalysing low-carbon mining supply is a significant global challenge. Low-carbon manufacturing precincts – clusters of geographically close businesses acros

    Sep 1, 2024

  • AUSIMM
    Subtek™ 4D™ – Optimised blasting performance through the application of new underground bulk explosive technology

    By B Taylor, S Evans

    Bulk explosive technology for underground mining has not seen any significant technological advances since the widespread transition from ammonium nitrate fuel oil (ANFO) to ammonium nitrate emulsions

    Sep 1, 2024

  • AUSIMM
    Operations versus Projects - How Do People Think and What are the Implications?

    By B Clements, G Lane

    The operations and project environments are very different, but overlap in many areas. The development of mineral processing projects is goal oriented, is schedule focused and is a contractual environ

    Oct 29, 2012

  • AUSIMM
    Fosterville Gold Mine Heated Leach Process

    By M Binks

    The Fosterville Gold mine is located approximately 20km to the East of Bendigo in central Victoria. The gold at Fosterville occurs as solid solution within disseminated arsenopyrite and pyrite. The Fo

    Aug 8, 2011

  • AUSIMM
    Minimum sample mass from reverse circulation grade control drilling at Rocklands copper project

    By M G. Hawtin

    The Rocklands copper project is a multilode, iron oxide copper gold (IOCG) + cobalt mineralised system located in the Eastern Fold Belt of the Mt Isa Inlier. Rocklands orebodies cover a range of oxida

    Sep 20, 2017

  • AUSIMM
    Calibration of post blast gas simulation using mine site readings

    By F C. D Michelin

    Blast fumes are a significant health risk to underground workers, containing several dangerous gases such as carbon monoxide (CO), nitrogen oxides (NOx) and ammonia. To ensure safe working conditions,

    Oct 12, 2022

  • AUSIMM
    Outotec Pressure Oxidation - More out of Sulfide Ore

    By J Tiihonen, J OÆCallaghan, T Haakana

    Outotec is today capable of providing technologies, process equipment and engineering for the construction of pressure oxidation leaching (POX) plants in any location in the world. Outotec works with

    Sep 26, 2013

  • AUSIMM
    Sustainable Steel Plant on an Environmental Protection Area

    By C A. Chaves

    During most of its history, the metallurgical industry has been seen as a source of pollution for the environment. However, during the second half of the 20th century, as the world environmental legis

    Jan 1, 2009