Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
-
Investigation of Stability of an Unconventional Water-Obstruction Gate Pillar with a Curved Boundary in Mining Inclined Ultra-Thick Coal SeamsBecause of complex geological environments, a number of coal reserves occur in inclined or dipping coal seams in certain parts of the world. Longwall top coal caving using split-level a singleentry pa
Jan 7, 2020
-
A Reclamation Program to Achieve sustainable Postmining Land Uses at the Black Mesa and Kayenta MinesBy Vern Pfannenstiel
Jan 1, 2005
-
Uranium Mineralization at Anomaly 2J, South Alligator Valley, Northern Territory, and Its Significance Concerning Regional Structure and StratigraphyBy Miezitis Y
A weak airborne radiometric anomaly was examined in the field and the presence of uranium confirmed. Rotary-percussion drilling showed the presence of uranium but a subsequent programme of diamond and
Jan 1, 1977
-
Predictive Control and Real Time Optimization in the Minerals IndustryBy Quin Dennis
Process Optimization ?What is it really? It is NOT ?a larger fan to increase draft through a process ?a larger pump on a wet circuit ?a wider conveyor belt for solid materials ?a larger feed el
Nov 1, 2011
-
Cost Model of the Leigh Creek CoalfieldThe Leigh Creek Coalfield is owned and operated by the Electricity Trust of South Australia to supply fuel to the Northern Power Station. To supply electricity at lowest cost, a costing and decision
Jan 1, 1990
-
-
Use Of Micropiles And Soil Nail Piles In State Of California Earthquake Retrofit Project No.#569 - Deep Foundations Institute Seattle, Washingon October 7-9, 1998By Ron Bromenschenkel
The State of California, Department of Transportation is currently retrofitting a major interchange near the San Francisco area. The project is located in a highly traveled area of Oakland with light
Jan 1, 1998
-
Economic Modelling Of A Ferrochrome Furnace ? SynopsisBy W. Biermann
All industrial processes are economically driven, resulting in the ever increasing need for process optimization in order to stay competitive and profitable. Numerous models has been published depicti
Jan 1, 2012
-
Changes In Stress, Strain, And Displacement With Change In Slope Angle At The Kimbley Pit, Ely, NevadaBy David W. Wisecarver
Kennecott Copper Corporation and the U. S. Bureau of Mines cooperated in a full-scale slope stability research project at the Kimbley Pit near Ely, Nevada. The west wall of the Kimbley Pit was mined f
Jan 1, 1968
-
A Preliminary Geotechnical Assessment for Re-Opening the Blackwater MineBy J Taylor, L Richards, M McKenzie
When a collapse in its services shaft caused rapid gas build up and its premature closure in. 1951, the Blackwater Mine at Wiauta was in full production with significant ore reserves yet to be mined.
Jan 1, 1996
-
Improving Flotation Plant Performance at Cadia by Controlling and Optimizing the Rate of Froth Recovery using Outokumpu Froth master™By Peter Bourke, Marc van Olst, Seppo Ronkainen, Natalie Brown
"Since the early days of flotation, process technicians have known that the speed at which the froth is recovered over the lip of the cell has a very direct and consistent influence on the grade and r
Jan 1, 2001
-
Pipeline syphons for economical and simple water transfer (0f637445-7793-433d-94a6-80e764b3d98e)By W. J. Dick, K. G. Kress
A pipeline syphon can be a simple and reliable alternative for water conveyance as compared to otherwise more complex pumping systems or low-level outlet conduits through earthfill dams. In a simple f
Jan 1, 2005
-
Comparison Of Dynamic And Static Methods Of Evaluating Static Pile Capacity - SynopsisBy Harpal Parmar
This paper evaluates dynamic methods of pile capacity prediction by comparing their results to static load test results. Dynamic and static pile load test data were assembled from four southeastern st
Jan 1, 1996
-
Solvent Extraction Approach To Recover Boron From Wastewater Generated By The LCD Manufacturing Industry: Part 1By D. Mohapatra
The possibility of using 2,2,4-trimethyl-1,3-pentanediol dissolved in tetrachloromethane as extractant for boron recovery is discussed. The parameters optimized for this purpose are contact time, boro
Jan 1, 2008
-
IC 8877 SIC-Based Demand Information System For Nonfuel MineralsBy George K. Schenck
This Bureau of Mines publication describes and evaluates a Standard Industrial Classification (SIC) based end-use data system for minerals that is designed to link the demand for minerals to economic
Jan 1, 1982
-
The application of new design concepts in high tension electrostatic separation to the processing of mineral sands concentratesBy D. M. MacHunter, T. Lawson, D. K. Henderson
The development and commercialization of new generation high tension electrostatic separators has provided a basis for simplifying mineral separation plant circuitry. The inclusion of new design f
Jan 1, 2003
-
Handling The Impacts Of Blasting On Grand Central Terminal For The MTA?s East Side Access ProjectBy A. J. Thompson
The Metropolitan Transportation Authority (MTA) East Side Access project (ESA) will, when it is complete, provide a new link to the east side of Manhattan from Long Island, NY that, linked with the Se
Jan 1, 2012
-
IC 7385 Description of Typical Mine-Telephone Systems and Suggestions for making Improved InstallationsBy C. L. Brown
"INTRODUCTION The heavy loss of life from mine fires in some coal mines recently has focused attention on the importance of maintaining reliable communication systems between the active working sectio
Oct 1, 1946
-
IC 8551 Bureau Of Mines Energy Program, 1971 ? IntroductionBy John D. Spencer
Clean energy production from coal, oil, and gas, and the development of these and other energy sources continued to be a major objective of the energy research program of the Bureau of Mines.3 In 1971
Jan 1, 1972