Search Documents

  • AUSIMM
    Pelletising performance of Western Australian ultra-fine magnetite concentrate and strengthening technique by optimising ore matching

    By X Hu, C-C Yang, J Pan

    In this work, preheating and roasting tests of pellets made from blends of Western Australia ultra-fine (WAU) magnetite concentrate and Chinese domestic magnetite concentrate or Brazilian hematite con

    Jul 24, 2017

  • DFI
    Characterization Of Loess For Deep Foundations

    By Robert L. Parsons

    This paper describes the results of a detailed analysis of a loess deposit at the deep foundations test site established by the Kansas Department of Transportation. Multiple CPT, SPT, and pressuremet

    Jan 1, 2009

  • DFI
    Design and Construction of the Thames Water Lee Tunnel Shafts, London

    By Sivilay Sayavong, David Puller, Julian Gatward, David Hard, Martin Stanley

    "AbstractThe Thames Water Tideway Tunnels programme involves the upgrade of London’s combined sewer and storm water system. The first section is the Lee Tunnel between the Beckton Sewage Treatment Wor

    Jan 1, 2014

  • AUSIMM
    Presidential Address, 1957-The Place of the Iron and Steel Industry in the Australian Economy

    Six years ago it was my responsibility to give the presidential address, and now that privilege has come my way again. On that occasion we were gathered atWhyalla and I took the opportunity of putting

    Jan 1, 1957

  • SME-ICGCM
    Numerical Modelling of the Range of Rock Fracture Zone Around Gateroads on the Basis of Underground Measurement Results (edbcb7c0-6a88-4056-904b-d121adf0097c)

    By Andrzej Walentek

    This paper presents the results of numerical modeling of the fractured zone around longwall gateroads. The numerical computations have been based on the results of underground measurements of the frac

    Jan 1, 2009

  • TMS
    Tin, Tantalum, and Niobium Recovery from Kougarok, Seward Peninsula, Alaska

    By J. L. Johnson

    The U.S. Department of the Interior, Bureau of Mines, investigated recovery of concentrates containing tin, tantalum, and niobium from the Kougarok deposit on the Seward Peninsula, AK. To date, 25 mil

    Jan 1, 1990

  • AUSIMM
    Analysing and Rehabilitating Rock Mass Failure in Critical Mine Infrastructure

    To optimise the haulage of the large tonnages produced from stopes in this high production gold mine, an ore pass and feeder system was introduced. This ore pass was designed and developed in 2006 and

    Nov 25, 2010

  • AUSIMM
    Use of Small-Scale Passive Systems for Treatment of Acid Mine Drainage

    By P Gunn, M Watts

    The general goal of passive acid mine drainage (AMD) treatment is to reduce levels of acidity and metals to acceptable levels. Most treatment systems use either an oxidising or a reducing strategy. In

    Jan 1, 2005

  • AUSIMM
    Beyond NPV - A Review of Valuation Methodologies and Their Applicability to Water in Mining

    By D Brereton, C J. Moran

    In this era of rising focus on the social and environmental costs and benefits of mining operations, the valuation methodologies used to assess such impacts become increasingly important. Within an in

    Jan 1, 2006

  • NIOSH
    RI 7506 A Method For Sampling And Analyzing Trona Dust

    By Murray Jacobson

    A method for determining airborne trona dust concentrations using a midget impinger was developed. During sampling, the trona dust, composed of sodium carbonate and bicarbonate, dissolves in the colle

    Jan 1, 1971

  • AIME
    Drilling Performances At The Kensico Dam, Catskill Aqueduct System, New York

    By W. L. Saunders

    WHEN work was begun in September, 1910, on the rock excavation for the foundation of the gigantic dam at Valhalla, N. Y., which is to convert Kensico lake into an important storage reservoir of the Ca

    Jan 2, 1914

  • SAIMM
    The Influence Of Mill Speed And Pulp Density On The Grinding Efficiency For Secondary Stage Grinding

    By J. Lux, B. Clermont

    Magotteaux, with the co-operation of Anglo Platinum, has erected a fully instrumented pilot plant at Frank concentrator, which is being used to study the influence of a variety of grinding parameters.

    Jan 1, 2004

  • AUSIMM
    Distinguishing Intrusion-Related from Orogenic Gold Systems

    By R J. Goldfarb

    Reduced intrusion-related gold deposits have become a new, low-grade, large-tonnage exploration target during the last decade. The best recognized examples of such deposits are recognized throughout t

    Jan 1, 2005

  • SME
    Glenbrook Nickel – Can New Caledonian Ore Save the Only US Nickel Producer?

    By Kerry Spickelmier

    The only nickel smelter and the only active nickel mine in the United States is Glenbrook Nickel Co., a joint venture (50% each) of Cominco Resources International Ltd. and Cominco Ltd. In 1989, with

    Jan 1, 1993

  • ISEE
    Presplitting and Controlled Blasting Techniques

    The objective in control blasting is to reduce overbreak to control the final pit wall slope, shaft, drift, ditch, bench, etc. to the final planned excavation limit.

    Jan 1, 1990

  • IMPC
    Beneficiation Of Graphite Deposits Of Arunachal Pradesh By Gravity Separation Method

    By S. C. Borah

    Graphite, a mineral form of pure carbon, is one of the most versatile minerals in industry, because of its varying physical properties and characteristics. The mineral occurs naturally in the form of

    Sep 1, 2012

  • SAIMM
    Developments In Controlling The Roof In South African Coal Mines - A Smarter Approach

    By P. Altounyan

    Techniques used to safely control the roof in UK coal mines for some 10 years have been applied to a South African coal mine. This new approach known in the UK as advanced rockbolting technology, is b

    Jan 1, 2001

  • SAIMM
    Safety Considerations In Underground Logistics?A Look At Vertical, Horizontal And In-Stope Transportation Systems ? Synopsis

    By S. M. Rupprecht

    Transportation accounts for some 26% of all mine accidents in South Africa. Although this figure may not be as prolific as fall of grounds accidents or accidents caused by seismic events, the enormity

    Jan 1, 2011

  • AUSIMM
    Mine Planning Information from Photogrammetry Sources at the El Teniente Mine

    By P González, E Córdova, E Faundez

    An integrated mine system must be capable of displaying and reporting valuable information that can be used to easily understand, manage and take action on the key parameters being reported.One of the

    May 9, 2016

  • CIM
    Stress Measurements at Great Depth at Craig-Onaping Mines, Sudbury Canada

    Reliable estimation of in situ stress is a major step in the analysis and design of underground excavations in rock, particularly for evaluating the stability of underground structures to prevent fail

    May 1, 2009