Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
A Simplified Two-Dimensional Analysis Of The Roof-Pillar-Floor Interaction Problem In Coal Mines
A two-dimensional time-dependent analysis of a overburden-coal pillar-weak floor strata interaction problem is presented as a beam model consisting of a composite roof beam resting on multiple elastic
Jan 1, 1988
-
Practical Aspects Of Longwall Pillar Design
By Christopher Mark
The past decade has provided a wealth of practical experience with longwall pillar design. Design formulas developed specifically for longwalls have proven their value in numerous applications. Analyt
Jan 1, 1990
-
Mine Roof Geology Information System (MRGIS)
By Syd Peng
It is necessary to fully understand roof geological features in order to design a proper roof support system for underground coal mines. These geological features include: rock type, rock strength. ro
Jan 1, 2003
-
Comparison of Some Aspects of Bolting Mechanisms Between Fully-Grouted Resin and Tensioned Bolts in Underground Mine Entries
By Asmaa Yassien
Finite element models were developed to study the effect of tensioned and fully-grouted bolts on the stability of the mine opening in a three-entry development system using a typical geological column
Jan 1, 2002
-
Roof Support Performance In High Stress Conditions
By Thomas P. Mucho
To document the performance of mine roof and roof support systems the U.S. Bureau of Mines (IJSBM) has been installing instrumentation at selected sites in U.S. coal mines. Much of this support and ro
Jan 1, 1995
-
Rock Mechanics and the Analysis of Underground Mine Stability Adjacent to Coal Refuse Impoundments
By David Newman
Coal refuse impoundments and underground mines are frequently sited in close vertical and horizontal proximity in the valleys of the Southern Appalachian coalfield. The steep V-shaped valleys provide
Jan 1, 2003
-
Controlled Thrust And Torque Placement Of Mechanical Anchor Bolts And Their Relationship To Improved Roof Control
By Anil Mahyera
Under contract to the Bureau of Mines, a roofbolting machine has been developed which will: control torque on the bolthead to within 4 percent of a set point, control thrust to a low level (150 lbf),
Jan 1, 1981
-
Finite Element Modeling Of Subsidence Induced By Underground Coal Mining: The Influence Of Material Nonlinearity And Shearing Along Existing Planes Of Weakness
By Daniel W. H. Su
Surface subsidence induced by multiple-panel coal extraction was calculated with finite element stress analysis. The use of nonlinear material behavior and GAP elements, which provide a realistic repr
Jan 1, 1990
-
The Control Of Surface Subsidence By Width/Depth Ratio And Chain Pillar Size In The Presence Of Competent Coal Measures
By E. H. R. Schumann
The local stratigraphy and composition of the coal measures, including competent dolerite sill and massive sandstone lavers is shown to have a restricting influence on the development and magnitude of
Jan 1, 1988
-
The Formation And Effects Of Transient Abutment Stress During Nonuniform Face Advance
By George J. Karabin
Since the inception of a qualitative pressure arch theory by Haak4 in 1911, much work has been done in an effort to apply this concept to underground mining. It has been used in both longwall and room
Jan 1, 1982
-
Developments in Improving the Standard of Installation and Bond Strength of Full Column Resin Roofbolts
By Peter Altounyan
Goedehoop Colliery in the Witbank Coalfield of South Africa produces some 8 million tonnes of coal from fully mechanised room and pillar mining methods, using resin anchored bolts as roof support. Inv
Jan 1, 2003
-
Horizontal Stress: The Root Of All Evil?
By J. Nielen van der Merwe
The effects of horizontal stress in coal mine roofs in South Africa did not receive the attention it deserved for several years, but now there is a danger that it may be over emphasized. A number of p
Jan 1, 2000
-
Design Of The Ventilation Shaft In The South Link Railway Tunnel Construction, Taiwan
By Jay Keng
During the construction of shaft on the fractured and weak rock strata, the stability of construction plays an important role. This study includes earth stress estimation, support method, and stabi
Jan 1, 1988
-
The Utilisation of Numerical Modelling to Predict Water and Gas Flows Around Longwall Panels; Two Case Studies from the UK Coal Mining Industry
By D. J. Reddish
This paper illustrates how numerical modelling has been utilised to predict water and gas pathways around active longwall panels using two case studies. This information has proved invaluable m the de
Jan 1, 2003
-
Evaluation Of Low-Coal ATRS Systems
By M. Terry Hoch
This paper presents information on low-coal ATRS systems that are now in use. A study was conducted consisting of an in-mine evaluation of ATRS- equipped roof bolters capable of bolting in seams below
Jan 1, 1988
-
Ground Control And Safety Considerations During Longwall Recovery
By William J. Gray
The Roof Control Division of MSHA's Pittsburgh Safety and Health Technology Center has been conducting a program to evaluate methods employed by the U.S. coal mining industry during recovery of l
Jan 1, 1993
-
The Use of NDT Methods to Determine the Condition of Rockbolt Support During the Recovery of a Previously Flooded Coal Mine Roadway at Thoresby Colliery
By Brian Clifford
Thoresby Colliery is in the process of recovering an old roadway that was flooded following the closure of an adjacent mine. The aim is to re-use the roadway as a gate road for a longwall retreat pane
Jan 1, 2002
-
Pillar Sizing
By Marek J. Mrugala
Coal strength based on scaled uniaxial compressive strength from the laboratory and back calculations from in-mine observations of pillar stability indicate that material strength scaling rules are op
Jan 1, 1989
-
Monitoring For The Evaluation Of The Stability Of Underground Openings
By P. K. Kaiser
The purpose of deformation monitoring for the evaluation of the stability of underground openings is reviewed briefly and some results from laboratory tests of small tunnels are presented. The ground
Jan 1, 1981
-
Pre-Driven Experimental Longwall Recovery Room Under Weak Roof Conditions - Design, Implementation, and Evaluation
By Stephen Tadolini
Reduction in the time required and improvements in safety during a longwall face move have compelled coal mine operators to examine and use pre-driven longwall recovery rooms. While this concept is no
Jan 1, 2002