Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Improving Stope Support At Modikwa Platinum Mine

    By Jaco J. van Vuuren

    Modikwa Platinum Mine, in the Eastern Bushveld of South Africa's Limpopo Province, is a new operation employing a hybrid mining method where mechanised methods are used for the main developments

    Jan 1, 2004

  • SME-ICGCM
    Rock Compaction Caused By Dewatering In Poorly- Consolidated Sandstones

    By Hamid R. Nikraz

    This paper reports the finding of a comprehensive investigation carried out to evaluate the compaction characteristics of saturated sandstone aquifers in the Collie Coal Basin under conditions anticip

    Jan 1, 1993

  • SME-ICGCM
    Progress In The Knowledge Of Granite Cutting With Diamond Wire (bf80b832-f557-4b46-b5c9-31193e67bf2d)

    By A. Bortolussi

    The paper discusses the state of the progress reached in the development of the diamond wire tool for cutting hard rocks. To the advances of this relatively new technology a substantial contribution h

    Jan 1, 1992

  • SME-ICGCM
    Longwall Surface Subsidence Prediction Through Numerical Modelling

    By Noor Mohammad

    Comprehensive numerical modelling of the subsidence associated with longwall mining in UK Coal Measures strata has been conducted and validated against UK data. The Rock Mass Classification System (RM

    Jan 1, 1997

  • SME-ICGCM
    Determination Of Basis For The Double Use Of Rectangular Rockbolted Roadways In The D/C Seam At The Auguste Victoria Mine

    By Karl H. Brandt

    In the Auguste Victoria mine a bolted rectangular roadway has been kept open for the first time in the seam D/C after retreat. The target of the project was to gain a basis for planning and experie

    Jan 1, 2001

  • SME-ICGCM
    Stability And Stress Evaluation In Mines Using In-Seam Seismic Methods

    By E. M. Williams

    The U.S. Bureau of Mines is investigating the use of in-seam seismic methods to monitor stress-induced changes in coal near the working face of longwall mines. Seismic surveys performed through a long

    Jan 1, 1994

  • SME-ICGCM
    The Application of Pre-tensioned Grouted Tendons at Harworth Colliery, UK

    By Chris Adams

    The application of pre-tensioned tendon roof support assisted Harworth Colliery in their revival, from impending closure to lowest cost deep-mined producer in the UK, over just six months last year. T

    Jan 1, 2003

  • SME-ICGCM
    A Possible Alternative To Hardwood Chock Pieces

    By B. G. D. Smart

    The development of a softwood alternative to the hardwood chockpiece used to build the waste-edge breakers commonly incorporated in gateroad packs is described. The results of laboratory tests on soft

    Jan 1, 1992

  • SME-ICGCM
    Hydrogeologic Effects Of Subsidence At A Longwall Mine In The Pittsburgh Coal Seam

    By Leslie Carver

    The effects of longwall mine subsidence on water resources were studied at a West Virginia coal mine (mine Z) by Carver (1994). Data were obtained for 137 domestic supply wells and springs and 12 base

    Jan 1, 1994

  • SME-ICGCM
    Analysis And Field Testing Of Presupport Application In Coal Strata

    By J. D. Dizon

    Conventional strata control methods (i.e. roof bolts. cable trusses) are not always effective for ground control of very weak coal strata. An alternative method, termed presupport. is being investigat

    Jan 1, 1990

  • SME-ICGCM
    Statistical Characterization Of Coal-Mine Roof Failure: Suggestions And Case Study

    By Alan D. Smith

    [A standardized checklist in a questionnaire format, was established to investigate selected factors associated with coal nips roof falls, as derived from an intensive review of the literature. A plot

    Jan 1, 1984

  • SME-ICGCM
    Bolting Practice In Longwall Gateroads At The Miike Colliery

    By Kikuo Matsui

    Standing supports such as steel arches or square work supports along with the necessary struts and lagging have been traditionally employed in the longwall gateroads of the Japanese underground coal m

    Jan 1, 1993

  • SME-ICGCM
    Development Of A Slope Stability Program For Improved Quarry Design

    By John Bullock

    Limestone and dolomite quarries were mapped to determine specific failure mechanisms for the various geologic and structural conditions. Algorithms for analyzing these mechanisms were incorporated int

    Jan 1, 1993

  • SME-ICGCM
    Evaluation Of Measurement System For Monitoring The Stability Of Roof Bolted Roadways With Rectangular Cross Section By Selected Examples

    By Axel Preusse

    To detect improper deformations of a roof bolted roadway in order to reduce inner mine damages in the most early stage and to initiate suitable countermeasures if necessary, several different measurem

    Jan 1, 2000

  • SME-ICGCM
    Roof Monitoring In Limestone Mines-Experience With The Roof Monitoring Safety System (RMSS)

    By Thomas E. Marshall

    During the past few years, the Pittsburgh Research Laboratory of the National Institute for Occupational Safety and Health (NIOSH) examined and characterized conditions at a majority of the undergroun

    Jan 1, 2000

  • SME-ICGCM
    Methods Of Controlling Thick And Strong Roof In Longwall Mining

    By Deren Zhu

    The principle of roof control in longwall mining is to control main roof fractures so as to reduce roof weighting, plus reasonable and effective design of supports to reduce the convergence and premat

    Jan 1, 1990

  • SME-ICGCM
    A Method To Determine Expander Spacing For Steel Pipelines In Mining Districts

    By Axel Preusse

    In the Ruhr district, pipelines of public and private infrastructure are made of cast iron, steel, plastics or asbestos cement. Legal framework, technical regulations and normative standards define wh

    Jan 1, 2004

  • SME-ICGCM
    Hazard Mapping Combining Geostatistical Modeling Of Coal Mine Roof Quality Ratings With Numerical Modeling Of Stress Data

    By J. Riefenberg

    U.S. Bureau of Mines (USBM) researchers are developing a personal computer-based hazard mapping system for use in underground coal mines. Hazard mapping is rapidly gaining interest as delineating area

    Jan 1, 1994

  • SME-ICGCM
    Stooping Low Safety Factor Pillars at Goedehoop Colliery - 12 Months Later

    By Gift Makusha

    Pre-feasibility work at Goedehoop Colliery indicated that stooping of the undersized pillars could be undertaken safely and economically. In light of the findings a decision was taken in may 2003 to u

    Jan 1, 2004

  • SME-ICGCM
    Effect Of Face Advance Rates On The Characteristics Of Subsidence Processes Associated With U.S. And German Longwall Mining Operations

    By Yi Luo

    Regulating the face advance rate in longwall mining operation can be an effective means to reduce the disturbance potential to surface structures associated with a longwall subsidence process. However

    Jan 1, 2001