    Development of Sattankulam heavy mineral sands, Tamilnadu, India by Tata Steel

    By S. Asokan, D. Rathod, Ch. V. G. K. Murty

    Tata Steel, a steel arm of Tata Group, is Asia's first and India's largest integrated private sector steel company. Tata Steel’s turnover in fiscal 2004-05 was nearly US$ 3.25 billion. As pa

    Jan 1, 2005

  • SME
    Scheduling Fast-Track Tunnel Construction Projects - Introduction

    By Valerie (Wollet) Rebar

    Successful execution of fast-track projects is an arduous task at best. Effective and organized management, a comprehensive technical design with an independent check-and-balance system, and optimal s

    Jan 1, 2008

  • SME
    Issues Impacting Coal Ash Utilization – Preprint 97-114

    By D. Dodgen, L. Larrimore

    Electric utilities depend heavily on coal as a major fuel source for power generation, annually producing more than 85 million tom of ash, boiler slag and FGD (flue gas desulfurization - "scrubber") m

    Feb 24, 1997

  • SME
    Utilizing Minerals And Materials With Negative Properties

    By G. W. Douglas

    The need for dimensionally stable filled polymer composites has spurred the quest for materials that possess a negative coefficient of thermal expansion (CTE). Finding minerals and materials with a ne

    Jan 1, 2010

  • SME
    Web Enabled Industrial Desktop To Increase Overall Process Effectiveness In Metallurgical Plants

    By J. P. Kennedy, O. A. Bascur

    Large metallurgical complexes have more data than a small city and these data change as internal and external conditions evolve. Staffing turnover hinders experienced-based decisions especially with

    Jan 1, 2002

  • SME
    The Effect Of Postponing The Delivery Of Commodity Product Based On Real Option Method

    By K. Zhang

    Real option value (ROV) method is considered to be more practical and advanced compared to net present value (NPV) method in evaluating a mining project, in particularly when there is substantial unce

    Feb 23, 2014

  • SME
    In Situ Leaching Of Copper -An Economic Simulation Approach (f03b625d-56a0-4dc7-9c7f-9baf892094c3)

    By A. Aly Selirn

    An economic simulation model was developed to predict the amount of copper recovered from copper oxide deposits and the cost of producing it as a function of the deposit parameters. The economic simul

    Jan 1, 1977

  • SME
    Cyanide Leach Process Bans: The Technical Side

    By C. A. Young

    Cyanide is a fast-acting, highly toxic substance but, at the same time, is deemed essential for sustaining life as well as our standard of living. In this manuscript, the facts about cyanide are pres

    Jan 1, 2001

  • SME
    Bold and Visionary Planning of Tunnels and Underground Space ? Introduction

    By Harvey W. Parker

    Our industry has developed to the skilled, experienced and productive industry that we now enjoy as a result of the visions of great engineers throughout history, but, in particular for their visions

    Jan 1, 2008

  • SME
    Mixed Potential Oscillations In The Dissolution Of Galena In Ferric Sulfate Solution

    By Li Zhou

    The kinetics of the dissolution of galena was studied by monitoring the mixed potential of a galena electrode in ferric sulfate solutions. The results show that the mixed potential of the galena elect

    Jan 1, 2008

  • SME
    Redefining the Ultimate Pit: Improving NPV by Factoring Scheduling into Design

    By H. Burton

    "The selection of the ultimate pit shell has a major impact on the overall value of a mining project. The size and shape of this pit drives the selection of pushbacks, equipment, and project strategy,

    Jan 1, 2015

  • SME
    Influence of highwall mining progression on web and barrier pillar stability

    By M. J. Raffaldi, K. W. Harris, K. A. Perry

    "Highwall miners have been widely used to extract additional coal reserves from existing surface operations, particularly on contour operations in the Appalachian coalfields. Using a continuous miner

    Jan 1, 2014

  • SME
    Looking Back at the Metal Mines of Cornwall

    By Thomas A. Simpson

    Traveling through the moors and valleys of Cornwall, England, one is reminded of the extensive mining activities of the past. Abandoned shafts, remains of granite block wheel houses and engine houses,

    Jan 9, 1981

  • SME
    Pumping and Drainage

    By Christopher J. Bise

    INTRODUCTION The control of nuisance water in a mine is extremely important; left uncontrolled, nuisance water can have a severe effect on haulage, ventilation, production, and the health and safe

    Jan 1, 1986

  • SME
    Case Study in Rock Mass Behavior: TBM versus Drill and Blast

    By Scott Chesman

    Increased TBM performance is leading the way for resurgence in tunneling activity in NYC. Tunnels will be excavated in the same geologic formations as previously excavated D&B tunnels whose constructi

    Jan 1, 2005

  • SME
    Bacís Flotation Cell For Gold- And Silver-Beard Pyrite Recovery

    By J. R. Parga

    In mineral processing, poor froth-flotation performance translates into both an enormous loss of revenue and an unnecessary waste of the ore reserve. In this context, Bacís Mining Company developed a

    Jan 1, 2009

  • SME
    Studies On Mechanical Properties And Influence Of Structural Defects Of Cu-Mo Composite Materials Obtained By The PVD Method

    By V. G. Grechanyuk

    The paper presents the mechanical properties of Cu-Mo composite materials depending on the molybdenum content. The influence of structural defects on the mechanical-physical properties of the condensa

    Jan 1, 2008

  • SME
    "SAFETY FIRST" in the development of underground mining machines

    By E. Lammer

    "Underground mining processes are dangerous. The design of mining equipment, which is able to cope with the hostile underground environment, is a challenge for all machine manufacturers. Presuppositio

    Jan 1, 2011

  • SME
    Considerations For Blending Low-Rank And High-Rank Coals

    By M. Downing

    This paper gives a brief overview of impacts of coal blending on coal-fired power plants performance and discuses the preliminary results of an on-going study aimed at evaluating the effect of coal pr

    Jan 1, 1997

  • SME
    Transactions Volume 344 - 2018 - SME Transactions 2018

    By Chee S. Theng

    As the 2018 president of the Society for Mining, Metallurgy & Exploration Inc., I am pleased to present the 2018 issue of the Transactions of the Society for Mining, Metallurgy & Exploration Inc., Vol

    Jan 1, 2018