Grouting And Freezing For Shaft Water Control In Milwaukee
By Patrick J. Doig
The contract for the construction of the Inline Pump Station for the Milwaukee Metropolitan Sewerage District involves the sinking of three shafts and the excavation of a pump chamber. The shafts a
Jan 1, 1985
-
Performance Characteristics Of Geogrid When Used For Roof And Rib Surface Control
By D. R. Dolinar
Geogrids can be used as surface control on both the roof and rib in underground mines to prevent the fall of small pieces of rock and material from between the primary supports. The use of screen mate
Feb 27, 2013
-
Vale Inco?s international search to curtail diesel emissions
By J. S. Stachulak
The Diesel Emissions Evaluation Program (DEEP), a research consortium formed in 1997 by Canadian mining companies, labour unions, and provincial and federal government departments, completed its work
Jan 1, 2009
-
Health Effects Of Amosite Mining And Milling In South Africa
By Jill Murray
This study focuses on the amosite mining region in South Africa and associated health effects, compared to other mined asbestos fiber types. Historically, dust and fiber levels were high in the amosit
Jan 1, 2007
-
Appraisal Techniques To Rank A Corporate Set Of Exploration Projects
By S. Angioletti
This paper addresses strategic investment decisions when they are nested in a project development format where each project is implemented in phases and each phase is approved to move on to the next p
Jan 1, 2010
-
Experiences And Projections On Sag Mill Multivariable Predictive Control
By R. Fuenzalida
Since 2007, a number of Multivariable Predictive Control (MPC) Applications have been implemented on SAG mills, among others, within the Kairos Mining Concentrator Automation Program using ?Profit Con
Jan 1, 2012
-
Movements Due to Freezing, Thawing and Tunneling Beneath Two Buildings
By K. E. Wood, K. J. DiRocco, L. A. Becker
The Russia Wharf segment of the Silver Line Phase II Project for the MBTA incorporated ground freezing and underpinning during New Austrian Tunneling Method(NATM) tunneling through timber pile foundat
Jan 1, 2005
-
Status Of A Reclaimed Mine Site In Colorado After 10 Growing Seasons – Preprint 97-54
By J. J. Gusek
Several final pits in the Seneca No. 1 Surface Coal Mine were abandoned in the 1960's without king reclaimed. In addition, a progressive landslide aggravated by the abandoned mine land conditions
Feb 24, 1997
-
Carbon Emissions From Base Metals - Preprint 09-096
By M. J. Farrell
Mining is a significant emitter of greenhouse gases and is the focus of increasing attention from green groups and regulators. Miners need to know their own carbon emissions and how they compare with
Jan 1, 2009
-
Evaluations Of 3m Fluorad™ Fc-gold On Gold Extraction From Production Heap Leaching At Daisy Gold Mine (Glamis Gold)
By Shawn Orser, Jennifer Waddell, Mike Sierakowski, Tom Barrett
Production evaluations were conducted at Daisy Gold Mine (Glamis Gold, formerly Rayrock), between August, 1997 and August, 1998 to quantify the effect of 3M fluorochemical surfactants (fluorosurfactan
Jan 1, 2000
-
Design and construction outlined of the Cannon mine tailings impoundment
By Ian Hutchison, Ted Sluder, Jack Caldwell, Don Moore
Introduction The Cannon mine at Wenatchee, WA has recently been brought into operation to recover gold from the sandstones of the Swauk formation. The mine is a joint venture between Asamera Minerals
Jan 8, 1986
-
Multiple Criteria Approach To Model Calibration In Dem Simulation Of Compaction Processes
By A. Sand
A 2-dimensional computational model based on the discrete element method (DEM) is utilized for modeling of stamp-charged coke making. In this process, a large volume of coal is compacted to one single
Feb 27, 2013
-
SelectionConsiderations - Using a Consultant
By Alfred Weiss
Selecting a minicomputer is not unlike selecting a costly piece of mining equipment such as a truck, shovel, crusher, or conveyor belt system. A marked difference might lie in the frequency at which s
Jan 11, 1981
-
Inner City Slurry Tunneling—Project Asdam, Antwerp, Belgium
By Klaus Rieker
North of Antwerp central train station, two single-track tunnels for the high-speed train line between Brussels and Amsterdam were constructed. At the same time, the central train station was modified
Jan 1, 2007
-
Construction Of Longueuil "Centre" 4.0 M Diameter Interceptor In The Montreal Area
By Rudy Scarabelli, John R. Wagner
At one time explosives were the only economical means of rock tunnel excavation. Except in relatively long tunnels in the right rock explosives are still the cheapest means of rock excavation where th
Jan 1, 1987
-
Extensive Mechanization Produces Record Performance In Drill-Blast Tunnelling
By Hans Hamrin
Three drill-blast cycles of 3.1 m advance achieved in one working shift of 7.5 hours at the Holsfjorden Tunnel project in Norway. The tunnel, 5235 m long, with a cross section of 8.6 m2, was completed
Jan 1, 1987
-
Reducing dust exposure from contaminated work clothing with a stand-alone cleaning system
By A. B. Cecala
A few years ago, the National Institute for Occupational Safety and Health and Unimin Corporation developed a clothes cleaning system that is able to quickly, effectively, and safely remove dust from
Jan 1, 2009
-
Simulation of Material Transport in a SAG Mill with Different Geometric Lifter and Pulp Lifter Attributes Using DEM Mining, Metallurgy and Exploration
By Alejandro Gutiérrez, David Ahues, Paola Merino, Felipe González
A Discrete Elements Method (DEM) study of load movement within a SAG mill 12,192 × 7620 (40′ × 25′) in normal operating conditions is performed. The purpose is to determine how the geometry of the lif
-
Colorado School Of Mines Mine Rescue Simulator
By C. Geier
Our national interests are best served by having well-trained first responders available for rapid response to emergency situations in underground mines. However, recent mine disasters have indicated
Feb 27, 2013
-
Designing, Scheduling And Managing Waste Rock Facilities - A Case Study On The Waste Rock Facilities At The Phoenix Mine, Nevada.
By V. Galla
Waste rock facilities (WRF) generally have a large footprint depending on the strip ratio the mine plan provides. Considerable planning is involved during the initial phase of the mine plan regarding
Jan 1, 2011