Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Sag Mill Operating Practice And Developments at Hilton Concentrator, Mount Isa Mines Limited, AustraliaBy A. Platts, K. Leung, P. Rohner, P. Munro, B. Coulter
The Hilton Concentrator treats a laminated stratiform silver- lead-zinc ore to produce separate lead, zinc and bulk concentrates. Commissioning commenced in December 1989. Grinding circuit performance
Jan 1, 1992
-
Refrigeration Economics At The Star Mine - IntroductionBy John R. Marks
The recent trend in the ventilation of deep under- ground metal mines in the United States is to rely more and more on refrigeration for air cooling. This paper describes the layout and the economics
Jan 1, 1980
-
Rethinking the use of new technology to improve operational performanceBy B. Cavender
Investments in new technology are often intended to improve the production or cost performance of existing operations. The economics used to justify these projects can be flawed, however, if they do n
Jan 1, 2000
-
Development Of Chemical Caps In Acid Rock Drainage EnvironmentsBy J. A. Chermak, D. D. Runnells
Sulfide-bearing waste rock, ore and tailings have the potential for generating acid rock drainage (ARD) when exposed to an oxidizing environment. The possibility exists of utilizing the acid produced
Jan 1, 1998
-
Acid/Base Sites On Mineral Filler Surfaces Determined By The Adsorption Of Probe MoleculesBy R. J. Pugh
The surface chemical sites on several fillers (quartz, feldspar, calcite and granite) were studied by the adsorption of well defined acid and basic probe molecules (benzoic acid, benzyl alcohol, ethyl
Jan 1, 1993
-
State-of-the-art in coal pillar designBy 1980, the US mining community had reached a broad consensus regarding coal pillar design. The pillar load could be estimated from tributary area theory, and the pillar strength could be estimated f
Jan 1, 2000
-
Characterization Of Eddy Current Separation Samples Of Aluminum Smelting By-ProductsBy J. Y. Hwang, M. L. Jeong, R. C. Greenlund
Various aluminum-smelting by-products from three production sources were received and characterized. The waste materials were tested for compound identification and environmental acceptance. A coarse
Jan 1, 2001
-
Plant Trial of a New On-Line Pressure Vessel Rheometer For SlurriesBy A. K. Bakshi, Komar S. Kawatra
A plant trial of a new on-line pressure vessel rheometer for slurries, developed at Michigan Technological University, was carried out at a nearby copper concentrator. The rheometer measured the flow
Jan 1, 1997
-
Rock Deformations and Stresses in Reinforcement for Large Rock CavernsBy Tzou-Shin Ueng
Rock reinforcement of rock anchors and rock bolts are commonly used for the support of large rock caverns. The rocks at the location of most large underground openings are usually under very high init
Jan 1, 1986
-
Measurement of Bulk Formation Compressibility Using Transient Pressure TestingBy F. C. Schwerer, C. R. McKee, J. C. Seccombe
Production of methane from coal seams requires hydrofracturing, and the length of a hydraulic fracture determines we11 spacing. Since the volume of fluid injected is known, the fracture length is the
Jan 1, 1986
-
Radiological Aspects Of Uranium Solution MiningBy Steven H. Brown
Ore bodies which were once uneconomical to mine by conventional methods such as tunneling or open pits, have become attractive due to the development of nonconventional techniques, involving considera
Jan 1, 1981
-
Crushed Stone Quarry Fines Use For Structural Devices ProductionBy R. Candia
The use of industrial wastes, such as quarry fines of crushed stone, should represent a basic component of sustainable development indicators. Therefore, increasing investments should be foreseen in t
Jan 1, 2007
-
Comparison of microcomputer-based optimum pit limit design algorithms AlgorithmsBy Y. C. Kim, W. L. Meyer, W. Cai
Although the first published optimum pit limit design algorithm by Lerchs-Grossmann dates back to 1965, the majority of the open-pit mines in the US has not as yet adopted such a rigorous optimization
Jan 1, 1987
-
Application of Rock Mass Characterization to the Stability Assessment and Blast Design in Hard Rock Surface Mining ExcavationsBy A. M. Elmherig, M. R. Sunu, R. N. Singh
The presence and orientations of fractures and discontinuities in rock masses exposed in a surface mining excavation are likely to have a great influence on both slope stability and blasting efficienc
Jan 1, 1986
-
The Design Of Mine Fan Evasees ? IntroductionBy E. F. C. Ferrett
The benefits derived from the use of main fan evasees or diffusers are well known. If a well designed evasee is fitted to a fan either more air will flow through it or the same air flow rate will be d
Jan 1, 1980
-
Multiple-Seam Longwall Gate Road Pillar Design Using Modeling TechniquesBy Jeffrey M. Listak, Gregory J. Chekan
The U.S. Bureau of Mines, in an effort to improve coal conservation and utilization is currently investigating longwall panel layouts to maximize coal recovery and minimize interactive problems in mul
Jan 1, 1992
-
A Regressive Simulation Model Analysis Of Acoustic Pollution In Mining EngineeringBy C. Orf. Chukabarah
Acoustic pollution (noise) is a significant mine environmental system problem. The U.S. Bureau of Mines (USBM), Environmental Protection Agency (EPA), Department of Labor (DOL) and other researchers h
Jan 1, 1992
-
Laboratory Testing for Design of Thickener CircuitBy Joseph M. Keane
Introduction The English word "sedimentation" is derived from the Latin verb "sedere" meaning to sink down. As a mineral processing unit operation, sedimenta¬tion has been defined as the separatio
Jan 1, 1986
-
Applying Risk Analysis To Assess Economic Viability Of Underground Mining At The Golden Sunlight MineBy James Sheridan
Risk can generally be defined as the possibility or chance of a loss corresponding to uncertainty. Analysis is the process for examining the components and relationships of a complex system in order t
Jan 1, 2002
-
Underground Drilling In High-Pressure Water At GrasbergBy Noris Del Be1 Belluz
Drilling underground in the Grasberg dewatering drifts has routinely hit water aquifers with high flow rates and pressures. Two types of holes are used. Pilot holes probe ahead of the tunnel developme
Jan 1, 1998