Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SAIMM
    Possible Difficulties With Building Tailings Dams Of Cyclone Overflow Product

    By G. E. Blight

    Many mines engaged in deeplevel gold mining in South Africa are experimenting with the use of tailings fills, or are implementing tailings backfilling programmes on a limited scale. The approach varie

    Jan 1, 1988

  • SAIMM
    Proceedings, Annual General Meeting, 1990

    The 93rd Annual General Meeting of The South African Institute of Mining and Metallurgy was held in the Highveld Room of the Carlton Hotel in Johannesburg on Wednesday, 15th August, 1990. Obituarie

    Jan 1, 1990

  • SAIMM
    Development Of A Prototype X-Ray Transmission Washability Monitor - Synopsis

    By S. Shamaila

    The design and efficient operation of density-based mineral processing units requires regular densimetric analysis to be carried out on the various associated process streams. The results obtained fro

    Jan 1, 2012

  • SAIMM
    Light detection and ranging-based georeferencing of underground mining ground-penetrating radar data

    By M. Mpofu, M. van Schoor, T. Kgarume, H. Grobler

    The South African mining industry has committed to achieving a state of zero harm for its workforce, with a strong emphasis on worker health and safety. Among the major safety concerns are falls of gr

    Jul 23, 2025

  • SAIMM
    Performance Evaluation Of A New Stochastic Network Flow Approach To Optimal Open Pit Mine Design?Application At A Gold Mine ? Synopsis (67824a6c-621d-4d66-8f1a-3155e9a184f1)

    The optimal design of production phases and ultimate pit limit for an open pit mining operation may be generated using conventional or stochastic approaches. Unlike the conventional approach, the stoc

    Jan 1, 2012

  • SAIMM
    Simulation Techniques for the Optimization of High Capacity Refrigeration in German Coal Mines

    By E. -U. Reuther

    To improve the climatic environment underground the German coal mining industry has installed refrigerators with a capacity of 300 MW cooling power. One third of this total is accounted for by central

    Jan 1, 1987

  • SAIMM
    The next generation of permanent cathode and lead anode technology

    By T. Marsden

    The demand for continuous improvement in the industrial world is an ongoing process. Some sectors, where the competitive forces are well established, have led the development of new and reliable techn

    Jan 1, 2009

  • SAIMM
    Modern Practices Of Post Taphole Operation In Ferro Chrome Production And Its Advantages

    By S. K. Mahata, P. G. Suresh Kumar, B. B. Singh

    Improvement of post tap hole practices is achievable by mechanized handling of melt during the production of Ferro Chrome, resulting in higher recovery of chromium. The paper deals with modern practi

    Jan 1, 2007

  • SAIMM
    Evaluation Of Processing Options For The Treatment Of Zinc Sulphide Concentrates At Skorpion Zinc - Synopsis

    By H. F. Fuls

    Skorpion Zinc, an integrated zinc mine and refinery located in the south of Namibia, has a production capacity of 150 000 t/a of special high grade (SHG) zinc. The Skorpion zinc oxide resource will be

    Jan 1, 2013

  • SAIMM
    METTOP’s ionic liquid cooling technology: the safest way of furnace tapping

    By S. Konetschnik, E. Dreyer, A. Filzwieser

    "More intense furnace operations require effective cooling in order to achieve low refractory wear and good furnace lifetimes, making cooling technology an important aspect of furnace operations. Howe

    Jan 1, 2014

  • SAIMM
    A Follow-Up Paper On The Development Of The West Driefontein Tailings Backfill Project

    By M. F. G. Bruce

    Two backfill systems have been developed on West Driefontein, namely the centrifuge dewatered tailings system and the cyclone-classified tailings system. Modifications to the two systems since the p

    Jan 1, 1988

  • SAIMM
    Photogrammetry for Structural Mapping in Mining

    By G. Poropat, A. R. Guest, H. P. Grobler

    At the De Beers Consolidates Mines operations it is common practices to perform Geotechnical mapping of the newly exposed faces in the waste and ore rock. The purpose of Geotechnical mapping is to qua

    Jan 1, 2003

  • SAIMM
    Poor Sampling, Grade Distribution, and Financial Outcomes

    "This study examines the problems faced by open pit mine superintendents who make choices about how to direct their materials, either to the waste dump or to the mill. The paper explores the effects o

    Jan 1, 2017

  • SAIMM
    The Dual-Electrode DC Arc Furnace?Modelling Brush Arc Conditions ? Synopsis (33ce1b78-a71f-4fad-b87a-23567a029921)

    By Q. G. Reynolds

    The dual-electrode DC arc furnace, an alternative design using an anode and cathode electrode instead of a hearth anode, was studied at small scale using computational modelling methods. Particular at

    Jan 1, 2012

  • SAIMM
    Considerations In The Design And Operation Of Backfill Systems For Narrow Tabular Orebodies

    By C. L. de Jongh

    The number and scale of backfilling operations in the South African gold mining industry have grown rapidly in recent years. The application of backfilling as a means of stope support in a wide range

    Jan 1, 1988

  • SAIMM
    SORD - A Novel Underground Dredge Mining Technology

    By N. Graham, C. Walker

    The SORD Miner is a patented mining principle being developed to exploit mineral and energy resources that current technology can not access. SORD Miner is designed to operate in underground wet, gran

    Jan 1, 2007

  • SAIMM
    A Model for Determination of Methane Flow Parameters in Coal from Desorption Tests

    By R. D. Lama

    This paper presents the results of a study of the mechanics of methane gas flow in coal. Desorption tests carried out on cylindrical coal specimens showed that an analytical formulation can be made to

    Jan 1, 1987

  • SAIMM
    Impact of plant upgrade and DMS on the processing capability of the Tati Nickel concentrator?a case study ? Synopsis

    This paper describes DRA?s involvement with the expansions at Tati Nickel, Phoenix Mine, that have taken an initial plant design of 3.6 Mtpa (originally built by Murray & Roberts), up to 5 Mtpa, and e

    Jan 1, 2009

  • SAIMM
    Analysis of a rock slope failure in a feldspar open pit mine

    By G. Iabichino, M. Cravero, F. Nacci, L. Rinaldi, L. Vigliero

    ABSTRACT: The proposed paper is aimed at analysing the failure of a steep cliff slope that, in the past, was exploited for open pit mining operations. A volume of over 400,000m3 of gneissic aplitic ro

    Jan 1, 2003

  • SAIMM
    An Assessment Of Pentlandite Occurrence In The Run Of Mine Ore From BCL Mine (Botswana) And Its Impact On The Flotation Yield.

    By Oaitse Medupe

    The feed to the BCL concentrator is made of the ore from Phikwe No3 shaft, Selebi shaft and Selebi North shaft. The receiving bin of the concentrator has daily throughput of 7869mt live capacity of or

    Jan 1, 2007