Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
New Approach Controls Dust At The Collector Dump Point - NIOSH Finds A Simple, Cost-Effective Solution For Reducing Dust For Blasthole Dills
By Steven J. Page, Wm. Randolph “Randy” Reed, John A. Organiscak
Researchers studying dust generation from blasthole drills developed a simple, quick fix that reduced respirable dust concentrations by more than 63% at the dump point. This device, which requires alm
-
IC 6290 Mining Methods And Costs At The Park Utah Mine Park City, Utah ? Introduction
By E. A. Hewitt
This paper describing the mining practices at the Park Utah mine in the Park City district is one of a series being prepared by the United States Bureau of Mines on mining practices, methods, and cost
Jan 1, 1930
-
Microseismic Techniques For Monitoring The Behavior Of Rock Structures
By Wilson Blake
This report presents the results of a 7-year Bureau of Mines program to review, revise, and make an effective engineering tool of the microseismic method of determining the stability of rock structure
Jan 1, 1974
-
RI 7785 The K2HfF6-K2ZrF6-1.25 Percent HF System At 40° C With Other Solubility Curves From 25° To 70° C
By Stanley C. Rhoads
The Bureau of Mines investigated the complete ternary system K2 HfF6¬K2ZrF6-l.25 weight-percent HF at 40° C. In addition, solubility curves have been established at 25°, 30°, 500, 60°, and 70° C. Thes
Jan 1, 1973
-
OFR-51-82 Technology For Environmental Noise Control In Surface Mines
By Michael A. Staiano
The objective of this study was to determine the magnitude and sources of environmental noise from mining operations near populated areas, to de-scribe monitoring techniques, and to identify applicabl
Jan 1, 1981
-
IC 6336 Mining Laws of El Salvador
By A. D. Garman
This paper presents one of a series of digests of foreign mining legislation and court decisions which is being prepared in advance of a general report relative to the right of American citizens to ex
Sep 1, 1930
-
OFR-47(5)-83 Ecological Studies On The Revegtation Process Of Surface Coal Mined Areas In North Dakota - 5. Plant Production On Spoils And Topsoils As Affected By Time And Amendments
By Richard H. Bares
One criterion central to most definitions of reclamation is the restoration of mined lands to their original productive potential. This is often difficult to achieve on mined lands in the Northern Gre
Jan 1, 1982
-
RI 7371 Reaction Of Co-Ni-V Alloys With O2 At 1,351° To 1,429° K
By Robert M. Doerr
The research objective was to determine the effect of vanadium alloy additions on the oxidation behavior of cobalt-nickel Alloys. Eighteen alloys were reacted with 0 2 at 0.5 arm and 1,351°, 1,389°, a
Jan 1, 1970
-
RI 4260 Investigation Of Arkansas Bauxite ? Volume X (Deposits in T. 1 S., R.13 W.)
By M. C. Malamphy
A general description of the activities and results of bauxite investigation by the Bureau of Mines at its bauxite project in Saline and Pulaski Counties, Arkansas has been given in Report of Investig
Jan 1, 1948
-
Jarring/jolting exposure and musculoskeletal symptoms among farm equipment operators
By A. G. Mayton
Vehicle vibration exposure has been linked to chronic back pain and low back symptoms among agricultural tractor drivers. The objectives of this study by the National Institute for Occupational Safety
Jan 1, 2008
-
RI 8934 - Minimizing Lead Contamination in Copper Produced by Solvent Extraction-Electrowinning
By T. H. Jeffers
The Bureau of Mines conducted a laboratory investigation of copper electrowinning from electrolytes produced by solvent extraction. The purpose of the research was to gain a better understanding of th
Jan 1, 1985
-
IC 8762 Correlating Microfilm Mine Maps With Topographic Maps
By David C. Uhrin
Two improved methods have been developed to transfer microfilmed mine maps to suitable base maps showing surface features. The methods provide for (1) positioning and orienting maps; (2) merging adjac
Jan 1, 1977
-
Design Parameters Of Roof Support Systems For Pre-Driven Longwall Recovery Rooms
By T. M. Barczak, S. C. Tadolini
Reduction in the recovery time required and improvements in safety during a longwall face move have compelled coal mine operators to examine and use pre-driven longwall recovery rooms. The recovery e
-
OFR-117-80 Heap Leaching Studies On Uranium Ore - Phase VI: Field-Scale Heap Leaching Test Program
By Robert Merritt
Approximately 2,500 tons of low-grade uranium ore were used to conduct a field-scale heap leaching test as well as throe column leach tests. The ore used to construct the field-scale heap leaching tes
Jan 1, 1980
-
RI 3844 Performance of a Hydraulic Classifier Designed to Incorporate Four Hitherto Neglected Principles
By Will H. Coghill, I. L. Feld, G. D. Coe
The object of this paper . is to make known the superior classification accomplished in a hydraulic classifier designed to make use of principles determined by recent research ... The details of the d
Dec 1, 1945
-
IC 7219 Marketing Strategic Mica ? Introduction
By Lawrence G. Houk
In modern warfare mica is truly indispensable. The coordination of combatant units necessitates maintenance of intricate communications equipment, in the construction of which high-grade sheet mica is
Jan 1, 1942
-
IC 8798 Mine Health And Safety In-House Research, Development, And Demonstration In Fiscal Year 1979
This publication summarizes, for all interested parties, the research, development, and demonstration in-house projects programed by the Bureau of Mines for fiscal year 1979 (October 1, 1978--Septembe
Jan 1, 1979
-
OFR-150-83 Ground Control In Multi-Level Room And Pillar Mines
By William G. Pariseau
The research reported here concerns ground control in multi-seam mining and relates mainly to the analysis of stress about multi-seam room and pillar mines. The two variables of most concern are dista
Jan 1, 1983
-
RI 7449 A Method For Estimating Strength Of Rock Containing Planes Of Weakness
By Frank G. Horino
This report presents a method of utilizing the Coulomb strength criteria for estimating the strength and stability of pillars and pit slopes containing planes of weakness. It is assumed that the Coulo
Jan 1, 1970
-
The Unpredictable Life Cycle of a Coal Pillar
By Stephen C. Tadolini, Peter (Yunqing) Zhang
A unique circumstance created by monitoring a pre-driven longwall recovery room permitted measuring the stresses of a coal pillar throughout its entire life cycle in less than a week. A fender pillar